Predictika · ADU and JADU project pre-screen, Fremont, California
A permit intake assistant takes in a homeowner's accessory dwelling unit (ADU) project in Fremont, California, and says it is ready for a building-permit application. Before it goes out, the assistant sends it to Predictika's validator, which checks it against California ADU law and the City of Fremont's ADU rules together, applies state law where it overrides a stricter local rule, and reports every problem it finds in one pass.
This validator pre-screens any ADU or JADU project on a residential lot in Fremont against both sets of rules, not just the scenarios shown below.
Any ADU or JADU project in Fremont that touches these rules is in scope, not only the scenarios pictured here. Not checked: building, fire and structural codes, impact and connection fees, objective design standards and other zoning beyond what is listed, hazard zones, private covenants, and the accuracy of the facts the caller states (such as transit distance or historic status). The validator reflects the codes as of September 30, 2026; later changes are not applied.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: permit intake assistant (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based permit checklist or form validator (one rule per field, each limit checked on its own) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | A rules-based permit checklist | Predictika |
|---|---|---|
| A state-law rule that overrides a stricter local rule | Only with workarounds Each local limit is a separate rule, so a 12-foot front setback fails against the 20-foot standard even where state law protects an 800 sq ft unit, and someone has to remember the exception. | Both sets of rules are checked together; where Fremont's text is stricter, the state-law result is applied and the finding says state law prevails. |
| Limits that depend on each other | Only with care Trimming a unit from 850 to 800 sq ft changes the front-setback result and the unit-count result at once, and a checklist treats size, front setback and count as unrelated fields. | Size, height, setbacks and unit count are in one request and re-evaluated together on every call. |
| Limits that change with the lot and the unit type | Only with care Single-family and multifamily lots, conversions, attached and detached units and JADUs each have different caps, so the rule list multiplies. | The lot type and unit type are fields of the request, and every cap is computed from them. |
| A condition that applies only in some cases | Only with care The owner must live on the property only when a JADU shares a bathroom, and a historic listing needs review only for a conversion, so each condition needs a guard. | The condition and its trigger are in the same request and checked together. |
| Every problem returned in one answer | Only with workarounds Form checks usually stop at the first failing field, so an applicant fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the permit application; approval findings need a person to sign off; everything else is computed.
| 1 | A detached or attached ADU must stay within the size limit for its type, and a conversion has no size limit but may add at most 150 sq ft for access. |
| 2 | Height must be within the limit that applies: 16 feet for a detached ADU, more near major transit or with a matching roof pitch, and more for an attached ADU. |
| 3 | New floor area needs at least 4 feet of side and rear setback. |
| 4 | The front setback must match the main house, unless the unit is 800 sq ft or less and the front setback would block it; then state law prevails. |
| 5 | A single-family lot allows one ADU and one JADU; state law also allows a conversion ADU plus one detached ADU of 800 sq ft or less with 4-foot setbacks and a height of 16 feet or less. |
| 6 | A multifamily lot allows conversions of up to 25 percent of existing units (at least one) and up to 8 detached ADUs, never more than the number of existing units. |
| 7 | A JADU must be inside the single-family home, may be at most 500 sq ft, and needs a deed restriction. |
| 8 | A JADU that shares a bathroom needs the owner to live on the property. |
| 9 | The rental term must be at least 30 days. |
| 10 | The ADU may not be sold separately from the main home, except a sale that qualifies under Government Code section 66341, which gets staff review. |
| 11 | A listed historic home gets staff review. |
| 12 | New separate utility connections for a conversion or JADU get staff review. |
| 13 | The unit needs a separate entrance and address, and a required passageway, parking or sprinklers are not demanded beyond what the law allows. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please pre-screen this project for the Calloway household on their single-family lot in Fremont: a new two-bedroom detached ADU of 850 sq ft, 18 feet tall, with 4-foot side and rear setbacks and a 12-foot front setback, on a lot 60 feet deep where the main house sits 20 feet from the front property line and the unit is 38 feet deep, plus a garage conversion ADU and a JADU that shares a bathroom with the main home. The owner does not live on the property. The units will be rented for 14 days at a time. It is ready for the permit application.
Verdict: Blocked.
The agent's request. Please pre-screen this project for the Calloway household on their single-family lot in Fremont: a new two-bedroom detached ADU of 800 sq ft, 16 feet tall, with 4-foot side and rear setbacks and a 12-foot front setback, on a lot 60 feet deep where the main house sits 20 feet from the front property line and the unit is 38 feet deep, plus a garage conversion ADU and a JADU that shares a bathroom with the main home. The owner does not live on the property. The units will be rented for 14 days at a time. It is ready for the permit application.
Verdict: Blocked.
The agent's request. Please pre-screen this project for the Calloway household on their single-family lot in Fremont: a new two-bedroom detached ADU of 800 sq ft, 16 feet tall, with 4-foot side and rear setbacks and a 12-foot front setback, on a lot 60 feet deep where the main house sits 20 feet from the front property line and the unit is 38 feet deep, plus a garage conversion ADU and a JADU with its own bathroom. The owner does not live on the property. The units will be rented for 365 days at a time. It is ready for the permit application.
Verdict: Allowed.
The agent's request. Please pre-screen this project on a multifamily lot in Fremont with 12 existing units: nine new detached ADUs of 600 sq ft each, 18 feet tall, in a single-story building that is not within half a mile of major transit. The side setback is 3 feet, the rear setback is 4 feet, and the front setback is 25 feet; the main building sits 20 feet from the front property line. It is ready for the permit application.
Verdict: Blocked.
The agent's request. Please pre-screen this project on a multifamily lot in Fremont with 12 existing units: eight new detached ADUs of 600 sq ft each, 16 feet tall, in a single-story building that is not within half a mile of major transit. The side setback is 4 feet, the rear setback is 4 feet, and the front setback is 25 feet; the main building sits 20 feet from the front property line. It is ready for the permit application.
Verdict: Allowed.
The agent's request. Please pre-screen a garage conversion ADU of 650 sq ft at a listed historic home on a single-family lot in Fremont. The conversion adds 200 sq ft for access, the unit will be rented for 14 days at a time and sold separately from the main home, and it will have new separate utility connections. It is ready for the permit application.
Verdict: Blocked.
The agent's request. Please pre-screen a garage conversion ADU of 650 sq ft at a listed historic home on a single-family lot in Fremont. The conversion adds 120 sq ft for access, the unit will be rented for 365 days at a time and kept together with the main home, and it will have new separate utility connections. It is ready for the permit application.
Verdict: Needs approval.
The text of the narrated walkthrough, step by step.