Predictika · Basalt Storage Systems delivery proposals
An AI deal desk agent prepares a delivery proposal for an AI storage order on Basalt Storage Systems' AX3 appliance line. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the delivery rules, compares the figures the agent states with the ones it computes, and returns a verdict, every reason, and the figures it computed.
This validator models one process: a delivery proposal for Basalt Storage Systems' AX3 appliance line, the AX3 all-flash and AX3H hybrid flash/HDD units. It handles any delivery proposal involving these appliances, not just the scenarios shown on this page. It checks:
It does not cover other Basalt product lines, and it produces no price build-up or line-item quote: it checks the agent's unit price against the floor but does not build a price.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI deal desk agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Certified reference design for large training clusters | Only with care The rule depends on the GPU count of the cluster and on the product family, so it has to be written for each model and kept in step as appliances are added. | Cluster size and the appliance family arrive in one request, and the certification rule is checked on every call. |
| Throughput and capacity the proposal states | Only with workarounds The stated figures come from the model and the number of units, so a rule has to recompute them and compare, for each product line. | The stated figures are fields in the request and are compared with the computed ones on every call. |
| SSD supply and build slots already committed in the quarter | Only with workarounds The limit depends on orders already committed in the delivery quarter, which is data outside the proposal and changes as orders are booked. | Committed orders are part of the model, so the totals for the delivery quarter are computed on every call. |
| Support tier against regional parts depots | Only with care Each support tier promises a response time that only some regions can meet, so the tier and the region have to be checked against each other. | Support tier and region are in one request, and the depot rule is checked together with the other rules. |
| Per-unit price floor by order size | Only with care The maximum discount changes with the number of units, so a rules-based tool needs a price table for each order size band. | The floor is computed from the order size on every call, and the finding states the floor it applied. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as a quote is saved or a step is completed, so a person often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the delivery proposal; approval findings need a person to sign off; everything else is computed.
| 1 | Not enough throughput. 4,096 GPUs of Training need 1,638 GB/s of read throughput; 8 AX3 all-flash units deliver 1,520 GB/s. |
| 2 | Hybrid units are not certified for large training. Training clusters of 1,024 GPUs or more must use a certified reference design; AX3H hybrid flash/HDD is not certified. |
| 3 | Stated throughput does not match. The proposal states 1,900 GB/s of throughput, but the computed figure is 1,680 GB/s. |
| 4 | Stated capacity does not match. The proposal states 12,000 TB of usable capacity, but the computed figure is 10,000 TB. |
| 5 | Delivery is inside the build lead time. 2027-Q1 is inside the build lead time; the earliest quarter that can be promised is 2027-Q2. |
| 6 | Not enough SSD supply in the quarter. 2027-Q2 has 140,000 TB of SSD allocated; committed orders use 118,800 TB and this proposal takes it to 166,800 TB. |
| 7 | Not enough build slots in the quarter. 2027-Q2 has 150 build slots; 120 units are already committed and this proposal takes it to 160. |
| 8 | No parts depot for this support tier. Premium Onsite support promises a one-hour onsite response, and Latin America has no parts depot. |
| 9 | Price is below the discount floor. $620K per unit is below the $630K floor for a 60-unit order (900K list less the 30 percent maximum discount). |
| 10 | Not enough usable capacity. 20 PB is needed; 10 AX3 all-flash units hold 10,000 TB usable. |
| 11 | Quote held too long for the price risk (needs approval). Holding the AX3 all-flash price for 45 days exceeds the 30-day limit while SSD prices are moving. Needs finance approval. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please send Helix Compute a delivery proposal for 14 AX3H hybrid flash/HDD units for its 4,096-GPU training cluster, delivered in 2027-Q4, with Premium Onsite support in US West at $600K a unit, held open 30 days. It delivers 1,900 GB/s and 21,000 TB of usable capacity, which covers the 8 PB the cluster needs. It is ready to send.
Verdict: Blocked.
The agent's request. Please send Helix Compute a delivery proposal for 10 AX3 all-flash units for its 4,096-GPU training cluster, delivered in 2027-Q4, with Premium Onsite support in US West at $760K a unit, held open 30 days. It delivers 1,900 GB/s and 10,000 TB of usable capacity, which covers the 8 PB the cluster needs. It is ready to send.
Verdict: Allowed.
The agent's request. Please send Helix Compute a delivery proposal for 40 AX3 all-flash units for its 16,384-GPU training cluster, delivered in 2027-Q2, with Premium Onsite support in US West at $740K a unit, held open 30 days. It delivers 7,600 GB/s and 40,000 TB of usable capacity, which covers the 30 PB the cluster needs. It is ready to send.
Verdict: Blocked.
The agent's request. Please send Helix Compute a delivery proposal for 40 AX3 all-flash units for its 16,384-GPU training cluster, delivered in 2027-Q4, with Premium Onsite support in US West at $740K a unit, held open 30 days. It delivers 7,600 GB/s and 40,000 TB of usable capacity, which covers the 30 PB the cluster needs. It is ready to send.
Verdict: Allowed.
The agent's request. Please send Helix Compute a delivery proposal for 10 AX3 all-flash units for its 4,096-GPU training cluster, delivered in 2027-Q4, with Premium Onsite support in Latin America at $700K a unit, held open 30 days. It delivers 1,900 GB/s and 10,000 TB of usable capacity, which covers the 8 PB the cluster needs. It is ready to send.
Verdict: Blocked.
The agent's request. Please send Helix Compute a delivery proposal for 10 AX3 all-flash units for its 4,096-GPU training cluster, delivered in 2027-Q4, with Business support in Latin America at $760K a unit, held open 45 days. It delivers 1,900 GB/s and 10,000 TB of usable capacity, which covers the 8 PB the cluster needs. It is ready to send.
Verdict: Needs approval.
The agent's request. Please send Helix Compute a delivery proposal for 10 AX3 all-flash units for its 4,096-GPU training cluster, delivered in 2027-Q4, with Business support in Latin America at $760K a unit, held open 30 days. It delivers 1,900 GB/s and 10,000 TB of usable capacity, which covers the 8 PB the cluster needs. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.