Predictika · Fremont SB 9 Project Check
A homeowner in Fremont, California, asks an AI agent whether a two-unit project or an urban lot split under SB 9 looks approvable. Before the agent answers, the call goes to Predictika’s Fremont SB 9 Project Check. It reads the project against California SB 9 (Gov. Code 65852.21 and 66411.7) and Fremont Municipal Code 18.190.007 together: zone, excluded sites, historic status, tenant history, unit counts, setbacks, parking, utilities, rentals, parcel sizes, the owner-occupancy affidavit and the recorded covenant. Where the city is stricter than state law, state law prevails and the validator says so. Then it returns one verdict: approvable by right, approvable with changes, or needs staff review.
Pre-screen only. This is a pre-screen, not a permit or map decision, and it is not legal advice. The rules reflect SB 9 and Fremont Municipal Code 18.190.007 (Ord. 07-2023, amended by Ord. 02-2026) as understood in September 2026, and have not been reviewed by the city or an attorney. We are not affiliated with the City of Fremont.
This validator decides one thing: how one proposed SB 9 project looks against California SB 9 and Fremont Municipal Code 18.190.007 read together. It does not issue a permit or map decision, and it does not check plans.
Within these rules the validator handles any SB 9 project in Fremont that touches the listed items, not just the scenarios shown on this page. The unit limit applied is Fremont's total of four units of any kind (FMC 18.190.007(d)(4)); the validator does not apply separate ADU or JADU counts, sizes or setbacks (FMC 18.190.005, state ADU law), which are not checked here. Not covered: other cities, ADU-only projects, plan review and design standards, fees, and anything the applicant does not state. Site facts such as hazard zones, historic status and tenant history are taken as stated and are not verified.
The validator takes the project as inputs: the project type, unit counts, setbacks, parking, utilities, parcel sizes, and the answers to the zone, site, historic, tenant, affidavit and covenant questions. It computes the limits and returns the verdict and every finding, with the law behind each.
Two honest limits. The validator judges the project it is given: if an applicant understates a setback, the answer follows. And a project is only pre-screened if the agent calls the validator; in a deployment the intake workflow makes the call. Once a project is approvable by right, the validator accepts its release for the ministerial application, which is also not a permit decision; a project that needs changes or review is not released.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of how a typical permit form or checklist handles the same cases. It is a general judgment about effort and reliability, not a statement about any named product or city system, and anyone running a specific tool will know it better than we do.
| What the validator caught | Typical tool | Predictika |
|---|---|---|
| A unit limit made of a state rule and a city rule | Only with workarounds SB 9 requires two units; the city sets a total including ADUs and junior ADUs. A form has to carry both numbers and compare them with the plan. | Every rule is checked on every call and the verdict lists each finding. |
| A city condition that state law does not mention | Only if someone is vigilant The recorded covenant is a Fremont requirement. A checklist built from state law passes the project unless someone remembers it. | Every rule is checked on every call and the verdict lists each finding. |
| A question that depends on history nobody gave | Only if someone is vigilant Tenant history in the last three years decides whether a demolition qualifies. A form can leave it blank and move on. | Every rule is checked on every call and the verdict lists each finding. |
| Reporting every problem at once | Only if someone is vigilant A form usually shows the first problem. Here each rule fires on its own and all are reported with the law behind them. | Every rule is checked on every call and the verdict lists each finding. |
| More units on one parcel than the rules allow | Only with workarounds The limit mixes a state rule (two units) with a city rule on the total of units, ADUs and junior ADUs. A form has to know both and compare them with the plan. | Every rule is checked on every call and the verdict lists each finding. |
| Required covenant not agreed | Only if someone is vigilant A checklist built from state law passes this split. The covenant is a local condition, so someone has to remember to check it. | Every rule is checked on every call and the verdict lists each finding. |
| Tenant history not confirmed | Only with workarounds Some questions cannot be settled by a rule. The right result is a review, not a guess either way. | Every rule is checked on every call and the verdict lists each finding. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the request; approval findings need a person to sign off first.
| 1 | 3 SB 9 unit(s), 0 ADU(s) and 0 JADU(s) on one parcel. State law requires allowing two units (Gov. Code 65852.21); Fremont allows at most four units of any kind on a parcel where no lot split is proposed (FMC 18.190.007(d)(4)). Fremont governs the limit. Appears to conflict. |
| 2 | A recorded covenant is required that runs with the land and bars further subdivision and rentals of 30 days or less (FMC 18.190.007(f)(7)). Fremont governs; state law is silent on the covenant. Appears to conflict. |
| 3 | The project demolishes or alters existing housing and tenant history for the last three years was not confirmed (Gov. Code 65852.21(a), 66411.7(a)). Needs review. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. I would like to build 3 new units on my single-family parcel in Fremont. No lot split. The side and rear setbacks are 4 ft, there is 1 parking space per unit, and each unit has its own utility connections.
Verdict: Blocked.
The agent's request. I would like to build 2 new units on my single-family parcel in Fremont. No lot split. The side and rear setbacks are 4 ft, there is 1 parking space per unit, and each unit has its own utility connections.
Verdict: Allowed.
The agent's request. I would like to split my single-family parcel in Fremont into two parcels of 3000 sq ft each, with 1 unit on each parcel. I have signed the owner-occupancy affidavit.
Verdict: Blocked.
The agent's request. I would like to split my single-family parcel in Fremont into two parcels of 3000 sq ft each, with 1 unit on each parcel. I have signed the owner-occupancy affidavit, and I agree to record the covenant that runs with the land.
Verdict: Allowed.
The agent's request. I would like to demolish the existing house on my single-family parcel in Fremont and build 2 new units. The side and rear setbacks are 4 ft, there is 1 parking space per unit, and each unit has its own utility connections.
Verdict: Needs approval.
The agent's request. I would like to demolish the existing house on my single-family parcel in Fremont and build 2 new units. The housing has had no tenant in the last three years. The side and rear setbacks are 4 ft, there is 1 parking space per unit, and each unit has its own utility connections.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.