Predictika · Subsea production system quotes
An AI sales agent prepares a quote for a subsea production system package: the tree type and pressure rating, the number of trees, the manifold, the control system, materials, water depth, temperature, sour service, the metering station and wellheads, the umbilical length and a discount. Before the quote goes out, the agent sends it to Predictika, which checks it against a declarative model of the package and returns a verdict, every reason and the total it computed.
This validator models subsea production system package quotes, not just the scenarios shown below.
Any subsea production system quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: installation vessels, intervention services, project financing and negotiated project pricing. The scope (trees, manifolds, metering, control systems, wellheads, tie-in equipment and umbilicals) and the headline ratings (trees to 15,000 psi, -18 to 176 °C) follow public Aker Solutions pages. All prices in US dollars, the rules that link the options and the approval and discount limits are modeled from comparable subsea systems and are illustrative, not published by Aker Solutions.
6 scenarios in 2 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| A tree type that limits pressure and depth | Only with care The standardized tree has its own pressure and depth limits, so each limit is a rule that looks at the tree type chosen. | The tree type, the pressure and the depth are fields of one quote and are checked together on every call. |
| Trees that must fit the manifold slots | Only with care The slot count depends on the manifold chosen, and a direct tie-back has a different limit, so the tree count feeds several comparisons. | The tree count and the manifold are read together and the finding names the mismatch. |
| Materials that depend on temperature and sour service | Only with workarounds Hot service and sour service each force corrosion-resistant alloy, so one choice is constrained by two separate conditions. | Both conditions are read inside the model and compared with the material in the same pass. |
| A limit that depends on another choice | Only with workarounds The umbilical limit depends on the control system, so changing the control system changes which length is allowed. | The control system and the length are looked up together on every call. |
| A stated total that must match the computed one | Only with workarounds The price depends on the trees, pressure, material, depth, control, wellheads, manifold, umbilical and discount, so the total has to be recomputed before it is compared. | The total is computed inside the model and compared with the stated one on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a person often fixes one error and meets the next. | All findings come back together, so the agent can fix them in a single pass. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | 7 trees do not fit the chosen manifold slots. |
| 2 | Without a manifold at most 3 trees are tied back directly; the quote has 4. |
| 3 | The metering station is fed from a manifold; the quote has none. |
| 4 | 0 trees is outside the 1 to 20 trees one package covers. |
| 5 | The standardized vertical tree is a 10,000 psi design; 15,000 psi needs the vertical or horizontal tree. |
| 6 | More than 6 trees at 15,000 psi needs a capacity check by a person. |
| 7 | The standardized vertical tree is offered to 1500 m; the quote has 1501 m. |
| 8 | 2001 m of water depth needs an engineering review by a person. |
| 9 | 3001 m is deeper than the 3000 m this package is priced for. |
| 10 | Above 121 °C the trees need corrosion-resistant alloy material. |
| 11 | 176 °C service needs a design review by a person. |
| 12 | 177 °C is above the 176 °C rating. |
| 13 | Sour (H2S) service needs corrosion-resistant alloy material. |
| 14 | 100 km of umbilical needs a route and installation review by a person. |
| 15 | An electro-hydraulic control system is limited to 100 km of umbilical; the quote has 101 km. |
| 16 | 251 km of umbilical is beyond the 250 km a package covers. |
| 17 | A discount of 6 percent is above the 5 percent a salesperson may give; a manager should approve it. |
| 18 | A discount of 11 percent is above the 10 percent limit. |
| 19 | The quote states a total of USD 65,699,000; the prices give USD 65,700,000. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote 4 standardized vertical subsea trees rated for 15,000 psi, with dual-slot satellite structures. The water depth is 1,800 m and the service temperature is 130 °C. The material is carbon and low-alloy steel and the service is sour (H2S). The control system is electro-hydraulic with 20 km of umbilical. The quote includes wellheads. The sales rep offers a discount of 12 percent and the quote states a total of USD 60,192,000. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 4 horizontal subsea trees rated for 15,000 psi, with a six-slot manifold. The water depth is 1,800 m and the service temperature is 130 °C. The material is corrosion-resistant alloy and the service is sour (H2S). The control system is electro-hydraulic with 20 km of umbilical. The quote includes wellheads. The sales rep offers a discount of 12 percent and the quote states a total of USD 77,528,000. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 4 horizontal subsea trees rated for 15,000 psi, with a six-slot manifold. The water depth is 1,800 m and the service temperature is 130 °C. The material is corrosion-resistant alloy and the service is sour (H2S). The control system is electro-hydraulic with 20 km of umbilical. The quote includes wellheads. The sales rep offers a discount of 5 percent and the quote states a total of USD 83,695,000. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 8 horizontal subsea trees rated for 15,000 psi, with a twelve-slot manifold. The water depth is 2,500 m and the service temperature is 160 °C. The material is corrosion-resistant alloy and the service is not sour. The control system is electro-hydraulic with 120 km of umbilical. The quote includes wellheads. The sales rep offers a discount of 7 percent and the quote states a total of USD 142,371,000. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 8 horizontal subsea trees rated for 15,000 psi, with a twelve-slot manifold. The water depth is 2,500 m and the service temperature is 160 °C. The material is corrosion-resistant alloy and the service is not sour. The control system is all-electric with 120 km of umbilical. The quote includes wellheads. The sales rep offers a discount of 7 percent and the quote states a total of USD 194,091,000. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote 6 horizontal subsea trees rated for 15,000 psi, with a twelve-slot manifold. The water depth is 1,900 m and the service temperature is 140 °C. The material is corrosion-resistant alloy and the service is not sour. The control system is all-electric with 60 km of umbilical. The quote includes wellheads. The sales rep offers a discount of 5 percent and the quote states a total of USD 143,355,000. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.