Predictika · load and height limits, drive speed, mast ties and regional certification
An AI sales agent prepares a rack and pinion hoist quote for a contractor: a hoist, a drive unit, a mast, a region, a travel height, a load, a speed, a tie spacing and a number of hoists. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the hoist rules and returns a verdict, every reason and the price it computed.
This validator models rack and pinion construction hoists in the style of Alimak, not just the scenarios shown below.
Any quote for these hoists, drive units, masts and regions is in scope — not only the scenarios pictured here. Not covered: other Alimak product lines such as industrial elevators, platforms or services, real list prices, lead times, installation and rental terms. Every price and limit is an estimate, not a vendor price list.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Height against hoist and mast | Only with workarounds Two separate limits on the same number, one per product, each held in its own rule. | The travel height is compared with both the hoist and the mast on every call. |
| Speed against hoist and drive | Only with care A speed limit on the hoist and another on the drive that must both hold. | Both limits are checked and the one that fails is named. |
| Certification by region | Only with care A matrix of products and regions that has to be kept in rules or option filters. | The region is looked up against the certification data of the chosen hoist. |
| A stated total that must match the computed total | Only with workarounds Comparing a stated total with a computed one needs a separate rule per quote layout, and price rules rarely run on stated figures. | The stated net total is a field of the request and is compared with the computed total on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | A load of 2,200 kg is outside the 1 to 2,000 kg of the Twin cage rack and pinion hoist. |
| 2 | The load is above 90 percent of the hoist rating; application engineering must confirm. |
| 3 | A travel height of 180 m is outside the 1 to 150 m of the Single cage rack and pinion hoist. |
| 4 | A travel height of 160 m is above the 150 m the Standard mast section supports. |
| 5 | A speed of 45 m per minute is above the 38 m per minute of the Single cage rack and pinion hoist. |
| 6 | A speed of 60 m per minute is above the 54 m per minute of the Standard frequency drive unit. |
| 7 | A tie spacing of 12 m is above the 9 m the Standard mast section allows. |
| 8 | The Single cage rack and pinion hoist is not certified for the region chosen. |
| 9 | 9 hoists are outside the 1 to 8 hoists of one quote. |
| 10 | Order value of USD 2,514,240 is above USD 1,500,000 and needs a deal desk review. |
| 11 | Total discount of 12 percent exceeds the 10 percent limit. |
| 12 | The quoted net total of USD 261,900 does not match the USD 291,000 the validator computed. |
| 13 | A travel height above 250 m needs a wind load and tie design review by engineering. |
| 14 | Order value of USD 1,834,560 is above USD 1,500,000 and needs a deal desk review. |
| 15 | Total discount of 6 percent is above the 5 percent a rep can give; sales director must approve. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote one twin cage rack and pinion hoist with a standard frequency drive unit and standard mast sections, for a tower contractor with a 100 m building in the EU: 2,200 kg load, 48 m per minute, 9 m tie spacing. The net total is USD 291,000. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one twin cage rack and pinion hoist with a standard frequency drive unit and standard mast sections, for the same contractor: 1,800 kg load, 100 m travel height, 48 m per minute, 9 m tie spacing, EU. The net total is USD 291,000. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote one single cage rack and pinion hoist with a standard frequency drive unit and standard mast sections, for a US contractor building a 60 m tower: 1,200 kg load, 36 m per minute, 9 m tie spacing. The net total is USD 168,000. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one twin cage rack and pinion hoist with a standard frequency drive unit and standard mast sections, for the same US contractor: 1,200 kg load, 60 m travel height, 36 m per minute, 9 m tie spacing. The net total is USD 255,000. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote one twin cage rack and pinion hoist with a standard frequency drive unit and standard mast sections, for a tower contractor with a 100 m building in the EU: 1,600 kg load, 48 m per minute, 9 m tie spacing. The net total is USD 261,900. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one twin cage rack and pinion hoist with a standard frequency drive unit and standard mast sections, for the same contractor: 1,600 kg load, 100 m travel height, 48 m per minute, 9 m tie spacing, EU. The net total is USD 291,000. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.