Predictika · Power generation
An AI sales agent prepares a quote for a gas turbine power plant: a turbine from the Ansaldo Energia heavy-duty range (AE64.3A, AE94.2, AE94.3A, GT26 or GT36-S5) in simple cycle or combined cycle, the number of plant blocks, grid frequency, fuel and hydrogen blend, the site conditions, a service agreement and a discount. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model and returns a verdict, every reason and the figures it computed. The turbine names and ratings are from the public Ansaldo Energia brochure; the prices and several of the rules are modeled for this demonstration and are not Ansaldo Energia's.
This validator models a quote for one turbine model at a time, in simple cycle, 1x1 combined cycle or 2x1 combined cycle blocks, not just the scenarios shown below. It separates what is public from what is modeled.
Any gas turbine plant quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: the AE-T100 microturbine, steam turbine and generator choices beyond the block types above, emissions permits, grid connection, financing, real performance guarantees, and any real Ansaldo Energia price or term. The customer, the site and the prices on this page are fictional or illustrative.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Only the grid frequencies, hydrogen blends and fuels each turbine is listed for | Only with workarounds Each of the five models has its own frequency and hydrogen rating, and the fuel limits differ by class. A rules-based CPQ needs a table or one rule per model, and every brochure update means editing them. | Model, frequency, hydrogen blend and fuel arrive in one request and are compared with each model's row on every call. |
| Plant output that depends on blocks, configuration and the site | Only with care Output is a per-block rating times the number of blocks, reduced by temperature and altitude, then compared with the customer's requirement. It works, but the derating has to be kept in step with the ratings. | The rated output, the site output and the requirement are computed and compared together. |
| A price that adds turbines, steam cycle, balance of plant and service | Only with care Several price rules that depend on the model, the configuration and the service years, and a stated price has to be recomputed and compared. | The price build-up is computed on every call and compared with the net price the agent states. |
| Discount thresholds that trigger approval or a block | Only with care Two thresholds as percentages of a gross price that other rules change; a discount rule has to run after every price rule. | The gross price, both thresholds and the discount are evaluated together, in any order. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a person often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The selected gas turbine is listed for 50 Hz only; the AE64.3A is the model listed for 50 and 60 Hz. |
| 2 | A hydrogen blend above 30 percent by volume needs a combustion engineering review before it is promised. |
| 3 | A hydrogen blend of 41 percent by volume is above the 40 percent the selected turbine is listed for. |
| 4 | A hydrogen blend of 46 percent by volume is above the 45 percent the selected turbine is listed for. |
| 5 | A hydrogen blend of 71 percent by volume is above the 70 percent the selected turbine is listed for. |
| 6 | A hydrogen blend is quoted only with natural gas as the base fuel. |
| 7 | Heavy oil firing needs an emissions and maintenance review. |
| 8 | Heavy oil is quoted only for the E-class turbines (AE64.3A and AE94.2). |
| 9 | The customer needs 78 MW at the site; the plant gives 77.454 MW after the site derating. |
| 10 | The site temperature of 46 degrees Celsius is above the 45 degree limit of the output model. |
| 11 | A site above 1,000 metres needs an engineering check of the output and cooling. |
| 12 | The quote has 0 plant blocks; at least 1 is needed. |
| 13 | The service tier and the number of service years do not agree; a tier needs 1 to 20 years and no tier takes none. The quote has 5 years. |
| 14 | The service tier and the number of service years do not agree; a tier needs 1 to 20 years and no tier takes none. The quote has 0 years. |
| 15 | The service tier and the number of service years do not agree; a tier needs 1 to 20 years and no tier takes none. The quote has 21 years. |
| 16 | The discount is more than 5 percent of the gross price; a sales director should approve it. |
| 17 | The discount of $63.301 million is more than 20 percent of the $316.5 million gross price. |
| 18 | The quote states 480 MW of plant output at ISO conditions; the listed ratings give 495 MW. |
| 19 | The quote states a net price of $316.501 million; the modeled price build-up gives $316.5 million. |
| 20 | A hydrogen blend of 60 percent by volume is above the 45 percent the selected turbine is listed for. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote 2 combined cycle 1x1 (one gas turbine and one steam turbine) blocks with the GT26 on a 50 Hz grid, firing natural gas with a hydrogen blend of 55 percent by volume. The site is at 30 degrees Celsius and the customer needs 800 MW at the site. The quote includes a full service agreement for 12 years. The quote states 1,080 MW of plant output at ISO conditions and a net price of $726.48 million. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 2 combined cycle 1x1 (one gas turbine and one steam turbine) blocks with the GT26 on a 50 Hz grid, firing natural gas with a hydrogen blend of 25 percent by volume. The site is at 30 degrees Celsius and the customer needs 800 MW at the site. The quote includes a full service agreement for 12 years. The quote states 1,080 MW of plant output at ISO conditions and a net price of $726.48 million. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 1 combined cycle 1x1 (one gas turbine and one steam turbine) block with the AE94.3A on a 60 Hz grid, firing natural gas. The site is at 38 degrees Celsius and 400 metres above sea level and the customer needs 350 MW at the site. The quote includes a full service agreement for 10 years. The quote states 495 MW of plant output at ISO conditions and a net price of $316.5 million. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 2 combined cycle 2x1 (two gas turbines and one steam turbine) blocks with the AE64.3A on a 60 Hz grid, firing natural gas. The site is at 38 degrees Celsius and 400 metres above sea level and the customer needs 350 MW at the site. The quote includes a full service agreement for 10 years. The quote states 486 MW of plant output at ISO conditions and a net price of $329.4 million. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 1 combined cycle 2x1 (two gas turbines and one steam turbine) block with the GT36-S5 on a 50 Hz grid, firing natural gas. The site is at 30 degrees Celsius and the customer needs 1,200 MW at the site. The quote includes a full service agreement for 15 years and a discount of $285.81 million. The quote states 1,600 MW of plant output at ISO conditions and a net price of $1,143.24 million. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 1 combined cycle 2x1 (two gas turbines and one steam turbine) block with the GT36-S5 on a 50 Hz grid, firing natural gas. The site is at 30 degrees Celsius and the customer needs 1,200 MW at the site. The quote includes a full service agreement for 15 years and a discount of $114.324 million. The quote states 1,600 MW of plant output at ISO conditions and a net price of $1,028.916 million. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote 1 combined cycle 2x1 (two gas turbines and one steam turbine) block with the GT36-S5 on a 50 Hz grid, firing natural gas. The site is at 30 degrees Celsius and the customer needs 1,200 MW at the site. The quote includes a full service agreement for 15 years and a discount of $57.162 million. The quote states 1,600 MW of plant output at ISO conditions and a net price of $1,086.078 million. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.