Predictika · Fuel cell power and heat capture site orders
An AI sales agent prepares an order for a site powered by 325 kW solid oxide fuel cell Energy Servers, with or without steam, chilled-water or hot-water heat capture. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the published data sheet figures and limits and returns a verdict, every reason and the figures it computed.
This validator models Energy Server 6.5 site orders with the heat capture options on the published data sheets, not just the scenarios shown below.
Any Energy Server 6.5 order that touches these figures and limits is in scope — not only the scenarios pictured here. Not covered: prices (Bloom Energy does not publish prices, so this validator produces no price build-up or line-item quote), earlier Energy Server generations, grid interconnection codes, emissions, electrical efficiency and any figure that is not in the data sheets.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Output figures that depend on platform size and layout | Only with care Steam, chilling and footprint come from a table by platform size, pressure or temperature pair and layout; each table is a lookup to build and keep current. | Every size, application and layout is in one request, and the figures are looked up and compared with the quote on every call. |
| Stated figures that must match the data sheet | Only with care A stated figure is a free-entry field; a rule can compare it with a looked-up value, but someone has to write one for each output. | The stated power, steam, chilling, hot-water flow and footprint travel with the order and are compared on every call. |
| Limits on gas pressure, voltage, frequency and site temperature | Only with workarounds Each limit is a validation rule on its own field; they work, but they only fire when that field is saved, so errors surface one at a time. | All limits are checked together, whatever order the choices arrive in. |
| Choices that are possible only by arrangement with the manufacturer | Only with workarounds Fuels, unlisted sizes and indoor sites need a human decision; a rules-based CPQ usually forces a binary allow or block, or relies on a rep remembering to ask. | These come back as a separate "needs approval" finding, distinct from a block. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the order is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The quote has no Energy Server; at least one 325 kW Energy Server is needed. |
| 2 | The natural gas input pressure on the quote is 20 psig; the Energy Server data sheet requires 12 to 18 psig (15 psig nominal). |
| 3 | The natural gas input pressure on the quote is 10 psig; the Energy Server data sheet requires 12 to 18 psig (15 psig nominal). |
| 4 | The site design minimum temperature is -25 C; the Energy Server temperature range is -20 C to 45 C. |
| 5 | The site design maximum temperature is 48 C; the Energy Server temperature range is -20 C to 45 C. |
| 6 | The data sheets list three-phase output at 480, 415, 400 V (and 380 V on the heat capture sheets); 208 V is not a listed output voltage. |
| 7 | The Energy Server output frequency is 50 or 60 Hz; the quote asks for 25 Hz. |
| 8 | The quote states 1,500 kW net AC, but 4 Energy Servers at 325 kW each give 1,300 kW. |
| 9 | The quote states 2,200 kg/hr of steam, but the data sheet gives 1,955 kg/hr for 10 Energy Servers at the selected steam pressure. |
| 10 | The quote states 1,955 kg/hr of steam, but the data sheet gives 1,683 kg/hr for 10 Energy Servers at the selected steam pressure. |
| 11 | The quote states 14,000 kWth of chilling, but the data sheet gives 14,627 kWth for 64 Energy Servers at the selected chilled-water temperatures. |
| 12 | The quote states 50,000 kg/hr of hot water, but the data sheet gives 55,540 kg/hr for 20 Energy Servers. |
| 13 | The quote states a heat output of 782, but a power-only configuration has no heat capture. |
| 14 | The quote states a footprint of 2,211 square meters, but the data sheet gives 3,567 square meters for 64 Energy Servers in the selected layout. |
| 15 | The data sheets list natural gas; biogas, blended hydrogen and hydrogen configurations require contacting Bloom Energy. |
| 16 | The natural gas input pressure on the quote is 9 psig; the Energy Server data sheet requires 12 to 18 psig (15 psig nominal). |
| 17 | 12 Energy Servers is not one of the platform sizes listed for steam and chilling configurations; the data sheets say other sizes are available on request. |
| 18 | The power-only data sheet lists 480, 415 and 400 V; 380 V appears only on the heat capture data sheets. |
| 19 | The data sheets list outdoor as the Energy Server location; an indoor installation is not a listed configuration. |
| 20 | The quote states a footprint, but the data sheets publish footprints only for the steam and chilling platform sizes; it cannot be checked. |
| 21 | The natural gas input pressure on the quote is 22 psig; the Energy Server data sheet requires 12 to 18 psig (15 psig nominal). |
| 22 | The site design maximum temperature is 50 C; the Energy Server temperature range is -20 C to 45 C. |
| 23 | The quote states 20,000 kW net AC, but 64 Energy Servers at 325 kW each give 20,800 kW. |
| 24 | The quote states a footprint of 3,000 square meters, but the data sheet gives 3,567 square meters for 64 Energy Servers in the selected layout. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote a site with 10 Bloom Energy Servers (3,250 kW net AC), heat capture for steam at 5 barg, running on natural gas at 21 psig, 480 V output at 60 Hz, installed outdoors, with site temperatures from 2 to 38 °C. Layout: on the ground. The quote states net power of 3,250 kW, steam output of 2,200 kg/hr and a footprint of 585 square meters. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a site with 10 Bloom Energy Servers (3,250 kW net AC), heat capture for steam at 5 barg, running on natural gas at 15 psig, 480 V output at 60 Hz, installed outdoors, with site temperatures from 2 to 38 °C. Layout: on the ground. The quote states net power of 3,250 kW, steam output of 1,955 kg/hr and a footprint of 585 square meters. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote a site with 64 Bloom Energy Servers (20,800 kW net AC), heat capture for chilled water at 18/28 °C, running on natural gas at 15 psig, 208 V output at 60 Hz, installed outdoors, with site temperatures from -5 to 40 °C. Layout: stacked. The quote states net power of 20,800 kW, chilling output of 14,000 kWth and a footprint of 3,000 square meters. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a site with 64 Bloom Energy Servers (20,800 kW net AC), heat capture for chilled water at 18/28 °C, running on natural gas at 15 psig, 480 V output at 60 Hz, installed outdoors, with site temperatures from -5 to 40 °C. Layout: stacked. The quote states net power of 20,800 kW, chilling output of 14,627 kWth and a footprint of 2,211 square meters. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote a site with 20 Bloom Energy Servers (6,500 kW net AC), heat capture for hot water at 50/100 °C, running on natural gas at 15 psig, 400 V output at 50 Hz, installed outdoors, with site temperatures from -10 to 36 °C. The quote states net power of 6,000 kW and hot water flow of 50,000 kg/hr. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a site with 20 Bloom Energy Servers (6,500 kW net AC), heat capture for hot water at 50/100 °C, running on natural gas at 15 psig, 400 V output at 50 Hz, installed outdoors, with site temperatures from -10 to 36 °C. The quote states net power of 6,500 kW and hot water flow of 55,540 kg/hr. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote a site with 8 Bloom Energy Servers (2,600 kW net AC), power only (no heat capture), running on natural gas at 15 psig, 480 V output at 60 Hz, installed outdoors, with site temperatures from -28 to 30 °C. The quote states net power of 2,600 kW. It is ready to send.
Verdict: Blocked.
The text of the narrated walkthrough, step by step.