Predictika · chiller plant quote validator, modeled on AquaSnap 30RC air-cooled chillers
A sales agent prepares a chiller plant quote for a building and says it is ready to submit. Before it goes out, the agent sends it to Predictika's validator, which checks the plant against the site (voltage, roof, electrical service, sound limit, climate, seismic zone), the load, the delivery date and the discount rules together, and reports every problem it finds in one pass.
This validator checks any plant quote for the modeled chillers and sites, not just the scenarios shown below.
Any quote for these chillers and sites that touches these rules is in scope, not only the scenarios pictured here. Not checked: detailed engineering, installation, controls design, incentives and the accuracy of the facts the caller states.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based quote checklist or configurator form (one rule per field, each limit checked on its own) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | A rules-based quote checklist | Predictika |
|---|---|---|
| Capacity that depends on the weather | Only with workarounds Capacity is derated by the design ambient, the glycol mix and the unit held in reserve, so each site and fluid needs its own table of numbers. | The derating is calculated from the site and the choices in the same request. |
| Limits that depend on each other | Only with care Adding a unit changes capacity, electrical draw, weight, sound and price at once, and a checklist treats them as unrelated fields. | Capacity, electrical, weight and sound are all re-evaluated together on every call. |
| Options that only some sites need | Only with care Freeze, seismic, high-ambient and coating options apply only at certain sites, so each needs a guard. | The site and the option are in the same request and checked together. |
| Approvals that depend on the deal | Only with care The discount a rep, a manager or a vice president can approve depends on the deal size. | The approval limit is calculated from the deal and reported with the finding. |
| Every problem returned in one answer | Only with workarounds Form checks usually stop at the first failing field, so an agent fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The chiller model must be offered at the site's electrical voltage. |
| 2 | A plant is limited to six chillers, the most the plant controller can manage. |
| 3 | The total electrical draw must fit within the site's electrical service. |
| 4 | On a roof, the total weight must stay under the roof load limit. |
| 5 | The plant must meet the load after derating for hot weather and glycol, and with one unit held back when redundancy is chosen. |
| 6 | The sound at the property line must stay under the site's limit, using the low-sound option if needed. |
| 7 | A site with freezing winters on plain water needs the freeze kits. |
| 8 | A site in a seismic zone needs the seismic kits. |
| 9 | A site with a design ambient above 105F needs the high-ambient kit. |
| 10 | A requested delivery that is much earlier than the lead time is refused; one slightly earlier needs approval to expedite. |
| 11 | A discount above what a rep can give needs approval; one above the limit for the deal size is refused. |
| 12 | A plant far larger than the load needs approval as oversized. |
| 13 | A coastal site without coil coating needs approval. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please check this chiller plant quote for Desert Vista Medical in Phoenix: three AquaSnap 30RC120 chillers on plain water for a 280-ton load, all running with none held in reserve, and delivery in 18 weeks. It is ready to submit.
Verdict: Blocked.
The agent's request. The hospital now needs 300 tons, and I added the high-ambient kit. Please check three AquaSnap 30RC120 chillers on plain water at the Phoenix hospital, none held in reserve, delivery in 18 weeks.
Verdict: Blocked.
The agent's request. I changed the plant to four AquaSnap 30RC120 chillers with one held in reserve (N plus 1), the high-ambient kit, and a 260-ton load at the Phoenix hospital, delivery in 18 weeks. Please check it.
Verdict: Allowed.
The agent's request. Please check this chiller plant quote for Maple Grove School in Toronto: four AquaSnap 30RC060 chillers on a 30 percent glycol mix for a 220-ton load, none held in reserve, delivery in 16 weeks. It is ready to submit.
Verdict: Blocked.
The agent's request. I added the low-sound option to the Maple Grove School quote: four AquaSnap 30RC060 chillers on a 30 percent glycol mix, 220 tons, delivery in 16 weeks. Please check it.
Verdict: Allowed.
The agent's request. Please check this chiller plant quote for Bayfront Hotel in Miami: three AquaSnap 30RC080 chillers on plain water for a 220-ton load, none held in reserve, delivery in 16 weeks. It is ready to submit.
Verdict: Needs approval.
The agent's request. I added the coil coating to the Bayfront Hotel quote: three AquaSnap 30RC080 chillers on plain water, 220 tons, delivery in 16 weeks. Please check it.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.