Predictika · Optical transport system quotes
An AI sales agent drafts a quote for optical transport equipment: the optical platform, the coherent optics module, the number of line cards, the line rate, the partner discount tier, licenses, support and the term in years. Before the quote goes out, the agent sends it to Predictika, which checks it against a declarative model of the platform and module limits, the options each platform offers and the discount authority, compares the net total the agent states with the one it computes, and reports every problem it finds in one pass.
This validator models Ciena style optical transport quotes: four optical platforms (compact metro, modular metro, core and super-core), three coherent optics modules, three partner discount tiers, the number of line cards, the line rate in Gbps, an encryption license, a 24x7 support plan and the term in years. It handles any quote made of these parts, not just the scenarios shown below.
Any optical transport quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: other Ciena products such as routers, switches and network management software, real list prices, optical link budget and fiber plant design, or tax and multi-currency quoting.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Options by platform | Only with care Whether the encryption license or the support plan is offered differs by platform, so option rules multiply with every platform. | Each platform lists the options it offers; the check follows from the choices. |
| Line rate limits per platform and module | Only with care Each platform and each optics module has its own maximum line rate, and the flex-grid exclusion adds a third rule, one validation rule per combination. | The limits are properties of the platform and the module, checked on every call. |
| Discount stacking and approval bands | Only with workarounds Partner tier, volume and extra discounts add up across rules and approval levels, and the total is rarely checked in one place. | The discounts are added once and compared with both the rep authority and the limit. |
| Terms, quantities and reviews | Only with care Term, quantity and line-rate review triggers sit in separate rules that are easy to miss when one input changes. | Term, quantity and capacity reviews are evaluated together with the price. |
| The total the agent states | Only with workarounds Comparing a stated total with a computed one means a separate rule per quote layout, and price rules rarely run on stated figures. | The stated net total is a field in the request and is checked against the computed total. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | A line rate in Gbps of 600 is outside the 1 to 400 range of the Compact metro optical platform. |
| 2 | The encryption license is not available on the Compact metro optical platform. |
| 3 | A line rate in Gbps of 1,400 is above 1,000; a capacity planning review is required. |
| 4 | Order value of $1,642,016 is above $1,200,000 and needs a deal desk review. |
| 5 | A contract of 6 years is outside the 1 to 5 years allowed. |
| 6 | Total discount of 22 percent exceeds the 20 percent limit. |
| 7 | The quoted net total of $210,816 does not match the $234,240 the validator computed. |
| 8 | A quantity of 450 is outside the 1 to 400 line cards allowed. |
| 9 | The Standard coherent optics module is not rated for the flex-grid spectrum the core and super-core platforms need. |
| 10 | A quantity of 25 is below the minimum of 40 for the Gold partner tier. |
| 11 | A quantity of 120 is above 100 line cards; a large network build review is required. |
| 12 | A contract of 4 years is longer than 3 years; finance must approve the price lock. |
| 13 | Total discount of 13 percent is above the 12 percent a rep can give; sales director must approve. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. This is for a reseller quoting 30 line cards for a metro network build for a utility customer on its Silver partner tier, with the best discount it can offer. 30 line cards on the Modular metro optical platform with the Standard coherent optics module on the Silver partner tier, 6-year term, with a 14 percent extra discount. Net total $544,284. It is ready to send.
Verdict: Blocked.
The agent's request. This is for a reseller quoting 30 line cards for a metro network build for a utility customer on its Silver partner tier, with the best discount it can offer. 30 line cards on the Modular metro optical platform with the Standard coherent optics module on the Silver partner tier, 2-year term, with a 5 percent extra discount. Net total $506,862. It is ready to send.
Verdict: Needs approval.
The agent's request. This is for a reseller quoting 30 line cards for a metro network build for a utility customer on its Silver partner tier, with the best discount it can offer. 30 line cards on the Modular metro optical platform with the Standard coherent optics module on the Silver partner tier, 3-year term, with a 3 percent extra discount. Net total $544,146. It is ready to send.
Verdict: Allowed.
The agent's request. This is for a regional carrier adding encrypted 600 Gbps wavelengths between 12 metro sites, with the encryption license included. 12 line cards on the Compact metro optical platform with the Standard coherent optics module and the encryption license, at 600 Gbps. Direct list pricing, 2-year term. Net total $221,040. It is ready to send.
Verdict: Blocked.
The agent's request. This is for a regional carrier adding encrypted 600 Gbps wavelengths between 12 metro sites, with the encryption license included. 12 line cards on the Modular metro optical platform with the Standard coherent optics module and the encryption license, at 600 Gbps. Direct list pricing, 2-year term. Net total $263,040. It is ready to send.
Verdict: Allowed.
The agent's request. This is for a university research network adding 12 line cards at about 300 Gbps, with 24x7 support included. 12 line cards on the Compact metro optical platform with the Standard coherent optics module, at 300 Gbps, with the 24x7 support plan. Direct list pricing, 2-year term. Net total $210,816. It is ready to send.
Verdict: Blocked.
The agent's request. This is for a university research network adding 12 line cards at about 300 Gbps, with 24x7 support included. 12 line cards on the Compact metro optical platform with the Standard coherent optics module, at 300 Gbps, with the 24x7 support plan. Direct list pricing, 2-year term. Net total $234,240. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.