Predictika · Tower colocation and equipment-add quotes

An AI sales agent's tower colocation quote, checked before it goes out

An AI sales agent prepares a monthly rent and upfront fee quote for a carrier that wants to add equipment on a tower: the antennas, radio units and dishes, the ground lease area, the power allocation, the term and any discount. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the lease and structural rules and returns a verdict, every reason and the rent it computed.

Scope: New colocation, equipment add and equipment swap quotes for a tenant on a monopole, self-support, guyed or rooftop site, in metro, suburban or rural markets. See everything this validator covers

This validator models tower colocation and equipment-add quotes, not just the scenarios shown below.

  • Equipment and site — antenna, radio unit and microwave dish counts, the ground lease area, the radiation center height against the tower height, and the extra limits on rooftop sites.
  • Structure, loading and power — the structural analysis result, the wind loading of the equipment against the limit for the tower type, and the power allocation against the amps the equipment needs.
  • Term, discount and backhaul — the lease term, the volume discount that needs a long term, and fiber backhaul, which is not offered on rural towers.
  • Rent and stated figures — the monthly rent and upfront fees computed at illustrative prices, and the rent the quote states against the rent computed.
  • Approvals — passed-with-modifications structures, wind loading above the standard allotment, the volume discount, tall installations and non-carrier tenants go to a person.

Any tower colocation quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: tenant fees, escalators and renewal terms. Crown Castle's lease rules and rents are negotiated and not public, so every limit, threshold and price here is a modeled assumption and all prices are illustrative US dollar amounts.

The AI sales agentBuilds the colocation quote from the conversation with the carrier and says it is ready.
Predictika validatorChecks every rule at once and returns the verdict, each finding, and the computed figures.

7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch

What the agent proposes

The AI sales agent says

Illustrative agent statement. The validator receives the structured request below.

Proposing agent: AI sales agent (scripted)

Before sending, the agent must call Recorded run

Predictika validator


      
Waiting for the call.

Where rules-based CPQ gets it wrong

Click to expand

Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.

What the validator caughtTypical rules-based CPQPredictika
Limits that depend on the tower typeOnly with care
Wind loading limits and dish limits differ by tower type, so each limit needs a lookup per type and a new type means editing every rule.
The tower type is a field of the request and selects its limits on every call.
A discount that needs a longer termOnly with care
The volume discount is allowed only on a term of ten years or more, so a term rule has to sit beside the discount rule and stay in step with it.
The term and the discount tier are in one request and checked together on every call.
A structural result that decides the whole quoteOnly with workarounds
A failed or missing analysis blocks the quote, a passed-with-modifications one needs a sign-off, so one field drives rules at three severities.
The structural result is a field of the request and sets the severity of each finding in one pass.
A stated rent that must match the computed rentOnly with workarounds
The rent is built from the market, extra antennas, radio units, dishes, lease area, height and discount, so a separate rule is needed to recompute it and compare it with the stated figure.
The stated rent is a field of the request and is compared with the computed monthly rent on every call.
Every problem returned in one answerOnly with workarounds
Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next.
All findings come back together, whatever order the choices arrived in.

What this validator catches: findings from its test cases

Click to expand

Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.

113 antennas requested; a tenant may install 1 to 12 antennas.
2Equipment wind loading of 1,020 is above the 1,000 standard allotment; a person should confirm.
30 antennas requested; a tenant may install 1 to 12 antennas.
425 remote radio units requested; the limit is 24.
57 microwave dishes requested; the limit is 6.
6A rooftop site accepts at most 2 microwave dishes; 3 requested.
7A ground lease area of 401 sq ft is outside the 25 to 400 sq ft range.
8A ground lease area of 24 sq ft is outside the 25 to 400 sq ft range.
9Radiation center at 151 ft is below 20 ft or above the 150 ft tower.
10Radiation center at 19 ft is below 20 ft or above the 150 ft tower.
11The structural analysis has not passed (it failed or has not been done); equipment cannot be approved for installation.
12The structural analysis passed only with tower modifications; engineering and commercial sign-off is needed.
13The equipment needs 60 amps but only 59 amps are allocated.
14Equipment wind loading of 1,200 is above the 1,000 standard allotment; a person should confirm.
15Equipment wind loading of 1,500 is above the 1,000 standard allotment; a person should confirm.
16Fiber backhaul is not offered with rural towers.
17A term of 4 years is below the 5 year minimum.
18The 10 percent volume discount needs commercial approval.
19The volume discount requires a term of 10 years or more; 9 years quoted.
20Equipment at 200 ft on a tower of 250 ft or more needs lighting and airspace review.
21A non-carrier tenant needs commercial and sublease review.
22The quote states a monthly rent of $2,899.00; the modeled price gives $2,900.00.
23The quote states a monthly rent of $2,900.01; the modeled price gives $2,900.00.
24Equipment at 250 ft on a tower of 300 ft or more needs lighting and airspace review.
25A ground lease area of 500 sq ft is outside the 25 to 400 sq ft range.
26A term of 3 years is below the 5 year minimum.
27The quote states a monthly rent of $0.01; the modeled price gives $4,100.00.
28Equipment wind loading of 1,590 (tenths of sq ft) is over the 1,500 limit for this tower type.

Scenarios and results

Click to expand

The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.

1. Counts, lease area and rent: An equipment add with too many antennas, an oversized ground lease and heavy wind loading

The agent's request. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a metro market, with the radiation center at 150 ft: 14 antennas, 9 remote radio units and 1 microwave dish on a 450 sq ft ground lease, 80 amps of power allocated and a 10-year term. The structural analysis has passed. The monthly rent is $6,500.00. It is ready to send.

Verdict: Blocked.

  • Antenna count outside 1 to 12. 14 antennas requested; a tenant may install 1 to 12 antennas.
  • Lease area outside 25 to 400 sq ft. A ground lease area of 450 sq ft is outside the 25 to 400 sq ft range.
  • Wind loading near limit. Equipment wind loading of 1,155 is above the 1,000 standard allotment; a person should confirm.

2. Counts, lease area and rent: The agent resubmits after fixing the errors

The agent's request. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a metro market, with the radiation center at 150 ft: 9 antennas, 9 remote radio units and 1 microwave dish on a 150 sq ft ground lease, 80 amps of power allocated and a 10-year term. The structural analysis has passed. The monthly rent is $4,900.00. It is ready to send.

Verdict: Blocked.

  • Stated rent does not match. The quote states a monthly rent of $4,900.00; the modeled price gives $4,950.00.

3. Counts, lease area and rent: The agent resubmits after fixing the errors

The agent's request. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a metro market, with the radiation center at 150 ft: 9 antennas, 9 remote radio units and 1 microwave dish on a 150 sq ft ground lease, 80 amps of power allocated and a 10-year term. The structural analysis has passed. The monthly rent is $4,950.00. It is ready to send.

Verdict: Allowed.

  • Quote summary. Monthly rent $4,950.00, upfront fees $5,000, first-year total $64,400.00 at illustrative prices.

4. Volume discount and term: An equipment add with the volume discount on a seven-year term

The agent's request. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a metro market, with the radiation center at 150 ft: 9 antennas, 9 remote radio units and 1 microwave dish on a 150 sq ft ground lease, 80 amps of power allocated and a 7-year term, with the volume discount. The structural analysis has passed. The monthly rent is $4,455.00. It is ready to send.

Verdict: Blocked.

  • Volume discount needs a 10 year term. The volume discount requires a term of 10 years or more; 7 years quoted.
  • Volume discount to confirm. The 10 percent volume discount needs commercial approval.

5. Volume discount and term: The agent resubmits after fixing the errors

The agent's request. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a metro market, with the radiation center at 150 ft: 9 antennas, 9 remote radio units and 1 microwave dish on a 150 sq ft ground lease, 80 amps of power allocated and a 12-year term, with the volume discount. The structural analysis has passed with tower modifications. The monthly rent is $4,455.00. It is ready to send.

Verdict: Needs approval.

  • Tower modifications needed. The structural analysis passed only with tower modifications; engineering and commercial sign-off is needed.
  • Volume discount to confirm. The 10 percent volume discount needs commercial approval.
  • Quote summary. Monthly rent $4,455.00, upfront fees $5,000, first-year total $58,460.00 at illustrative prices.

6. Fiber backhaul on a rural tower: An equipment add on a rural tower with fiber backhaul

The agent's request. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a rural market, with the radiation center at 150 ft: 9 antennas, 9 remote radio units and 1 microwave dish on a 150 sq ft ground lease, 80 amps of power allocated and a 10-year term, with fiber backhaul. The structural analysis has passed. The monthly rent is $4,800.00. It is ready to send.

Verdict: Blocked.

  • No fiber backhaul in rural markets. Fiber backhaul is not offered with rural towers.

7. Fiber backhaul on a rural tower: The agent resubmits after fixing the errors

The agent's request. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a metro market, with the radiation center at 150 ft: 9 antennas, 9 remote radio units and 1 microwave dish on a 150 sq ft ground lease, 80 amps of power allocated and a 10-year term, with fiber backhaul. The structural analysis has passed. The monthly rent is $5,600.00. It is ready to send.

Verdict: Allowed.

  • Quote summary. Monthly rent $5,600.00, upfront fees $5,000, first-year total $72,200.00 at illustrative prices.

Narration transcript

Click to expand

The text of the narrated walkthrough, step by step.

  1. Welcome to a demo of Predictika's Validator. An AI sales agent prepares a monthly rent and upfront fee quote for a carrier that wants to add equipment on a tower: the antennas, radio units and dishes, the ground lease area, and more. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the lease and structural rules and returns a verdict, every reason and the rent it computed.
  2. I will start with the first request by the agent.
  3. The agent says. Please quote an equipment add for a Tier 1 carrier on a 180 ft monopole in a metro market, with the radiation center at 150 ft: 14 antennas. The structural analysis has passed. The rest of the request is on screen. The monthly rent is $6,500.00.
  4. Before it goes out, the agent calls the validator.
  5. Blocked, with two findings and one approval, all in one answer. 14 antennas requested; a tenant may install 1 to 12 antennas. A ground lease area of 450 sq ft is outside the 25 to 400 sq ft range.
  6. The validator returned two blocking findings and one approval in one answer. A check that reads one field at a time would pass most of this; it shows only when the choices in the quote are checked against each other.
  7. What this shows: for limits that depend on the tower type, a rules-based CPQ is error-prone for this.
  8. Now the agent resubmits.
  9. The corrected request. It changes the antennas to 9, the ground lease area to 150 sq ft and the monthly rent stated on the quote to $4,900.
  10. It calls the validator again.
  11. Still blocked, with one finding, all in one answer. The quote states a monthly rent of $4,900.00; the modeled price gives $4,950.00.
  12. Three findings cleared, but the change brings a different blocking finding: stated rent does not match.
  13. The agent resubmits once more.
  14. The revised request. It changes the monthly rent stated on the quote to $4,950.
  15. It calls the validator once more.
  16. This time the validator clears it.
  17. The earlier finding is cleared.
  18. Three problems caught in one call, fixed in two passes, and a clean quote. That is the value of Predictika's validator: catching mistakes before they reach the customer. Now you can try the other scenarios yourself.