Predictika · Harbour tug orders
An AI sales agent prepares a harbour tug order: the tug model, diesel or electric propulsion, fire-fighting, crane and aft winch options, the number of tugs, the crew, the bollard pull the operation needs, the draught the home port allows, the delivery time and the bollard pull the order states. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of how these choices fit together, and returns a verdict, every reason and the figures it computed.
This validator models six tug models and their options, not just the scenarios shown below.
Any tug order that touches these rules is in scope — not only the scenarios pictured here. Not covered: other Damen vessel types and prices. The model names, bollard pull, crew, draught and options come from public Damen tug pages; Damen does not publish its option exclusions or approval thresholds, so those are modeled from comparable tug builders and are not published by Damen. No prices are modeled.
6 scenarios in 2 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Options that depend on the model | Only with workarounds A crane is not offered on one model, a crane and an aft winch exclude each other on the two smallest decks, and each exclusion differs by model. | Model and options are fields of one order and are checked against each other on every call. |
| Propulsion that changes the figures | Only with care Electric versions exist for two models only, carry a lower bollard pull, and do not combine with fire-fighting, so one choice changes several limits. | Propulsion, model and the computed bollard pull are checked together. |
| Operation requirements against the tug | Only with care The bollard pull, crew and draught the operation needs must each be compared with a value that depends on the model and propulsion. | Required and delivered figures are compared on every call, and the reasons are listed together. |
| Blocks and approvals at once | Only with workarounds A fleet order and a short delivery time need a person while a wrong option stops the order, and both should be seen together. | Blocks and approvals are reported together, so one problem never hides another. |
| A stated figure that must match the tug | Only with workarounds The bollard pull on the order depends on model and propulsion, so a separate rule must recompute it and compare it with the stated figure. | The stated bollard pull is a field of the order and is compared with the computed one on every call. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the order; approval findings need a person to sign off; everything else is computed.
| 1 | An electric version is listed for the ASD Tug 2111 and the RSD Tug 2513 only. |
| 2 | Ice-class tugs are separate Damen designs (for example the ASD Tug 3413 ICE); none of the models on this order is ice class. |
| 3 | The ASD Tug 3212 is offered with an aft winch, not a crane; choose another model for a crane. |
| 4 | The working deck of the ASD Tug 2111 and 2312 takes a crane or an aft winch, not both. |
| 5 | The fire-fighting package is ordered with the diesel tugs; it is not combined with an electric version here. |
| 6 | The operation needs 85 t of bollard pull; the tug on the order delivers 80 t. |
| 7 | The order plans 11 crew; the tug accommodates up to 10. |
| 8 | The tug draws up to 590 cm; the home port allows 550 cm. |
| 9 | The quote states 80 t of bollard pull, but the tug on the order delivers 60 t. |
| 10 | An order of 4 tugs or more is a fleet deal and needs a commercial review. |
| 11 | The order has 0 tugs. |
| 12 | The RSD Tug 2513 is not listed as ready from stock; delivery in 17 months needs the yard to confirm a build slot. |
| 13 | Options fitted to a stock tug with delivery in 3 months need the yard to confirm the conversion time. |
| 14 | The order asks for delivery in 0 months. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote 4 electric ASD Tug 2312 tugs with fire-fighting, a crane and an aft winch, delivery in 14 months, 8 crew, an operation that needs 65 tons of bollard pull and a home port that allows 5.2 meters of draught. The order states 70 tons of bollard pull. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 4 diesel ASD Tug 2813 tugs with fire-fighting and a crane, delivery in 14 months, 8 crew, an operation that needs 65 tons of bollard pull and a home port that allows 5.2 meters of draught. The order states 80 tons of bollard pull. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 4 diesel ASD Tug 2813 tugs with fire-fighting and a crane, delivery in 14 months, 8 crew, an operation that needs 65 tons of bollard pull and a home port that allows 6.5 meters of draught. The order states 80 tons of bollard pull. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote 3 diesel ASD Tug 2813 tugs with fire-fighting and a crane, delivery in 14 months, 8 crew, an operation that needs 65 tons of bollard pull and a home port that allows 6.5 meters of draught. The order states 80 tons of bollard pull. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 1 electric RSD Tug 2513 tug with fire-fighting and ice class, delivery in 12 months, 7 crew, an operation that needs 75 tons of bollard pull and a home port that allows 7 meters of draught. The order states 80 tons of bollard pull. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 1 diesel RSD Tug 2513 tug with fire-fighting, delivery in 20 months, 6 crew, an operation that needs 75 tons of bollard pull and a home port that allows 7 meters of draught. The order states 80 tons of bollard pull. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.