Predictika · Datadog annual-commit quotes
An AI sales agent prepares an enterprise annual-commit quote: Infrastructure and APM hosts, ingested and indexed logs, prepaid containers, a committed annual spend and a volume discount, in US dollars per year. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the host, commit and discount rules, compares the annual total the quote states with the computed one, and returns every finding together with the line-item quote. This is an illustrative model built from public information; it is not Datadog's internal rule set.
This validator models one process: enterprise annual-commit quotes for Datadog's Infrastructure Monitoring, APM and Log Management products, including committed spend, usage beyond the commit and volume discounts. It handles any quote built from these choices, not only the scenarios shown on this page. It does not cover Datadog's other products.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| APM hosts that cannot exceed the Infrastructure hosts they attach to | Only with care Comparing two quantity lines on the same quote is a cross-line check. Per-line rules do not see it, so it ends up in a summary field or custom code. | The host counts are compared on every call and the finding states both numbers. |
| Expected spend against the committed annual spend, in both directions | Only with workarounds Spend is a total over many usage lines, and the commit is a contract field. Warning that usage will overrun the commit, or that the commit is far above the spend, needs a computed total plus two thresholds. | The annual total is computed from the line items and compared with the commit; overrun and shelfware each get their own finding. |
| Volume discount ceiling that depends on host count and commit term | Only with care A host-count band and a term bonus are two inputs to one ceiling. It works when every combination is entered, and drifts when a band changes. | The ceiling is derived from host count and term in one place; the rep limit, the approval band and the block are evaluated together. |
| Container allotment that scales with hosts and plan | Only with care The included containers depend on the plan and the host count, and prepaid containers offset the overage. The result is a gray zone between included and billed on demand. | The allotment is recomputed from hosts and plan; the overage and its estimated cost appear as an approval finding. |
| Stated annual total that must match the computed one | Only with workarounds A validation rule can compare a stated figure with a calculated one only if the stated figure is a field on the quote, which it rarely is. | The stated annual total travels with the quote and is compared with the computed one on every call. |
| Indexed log events that need ingested logs behind them | Only with care The dependency between two usage lines is easy to state but is rarely enforced across products on one quote. | The two log quantities are checked together on every call. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | 1,500 million indexed log events are quoted with no log ingestion; events must be ingested before they can be indexed. |
| 2 | 1,800 containers are above the 1,500 included with the hosts; the extra 300 are billed on demand, about $438.00 a month (an estimate). |
| 3 | 10 percent discount is above the 5 percent a sales rep can give; approvable up to 10 percent. |
| 4 | 15 percent discount exceeds the 10 percent maximum for 600 hosts on a 12 month term. |
| 5 | 350 APM hosts is more than the 300 Infrastructure hosts; APM is priced with Infrastructure attached to the same hosts. |
| 6 | A $12,000.00 annual commit is below the $20,000.00 minimum commit. |
| 7 | A 6 month term is outside the 12 to 36 months the validator accepts. |
| 8 | Expected annual spend of $231,600.00 is above the $230,000.00 commit; usage beyond the commit is billed at on-demand rates. |
| 9 | Stated annual total does not match: the agent stated $442,800.00; the validator computes $376,380.00. |
| 10 | The $100,000.00 commit is more than 125 percent of the $78,300.00 expected annual spend; unused commit is not refunded. |
| 11 | The quote has no products or usage. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Quote for Halvorsen Retail Cloud on the Datadog Enterprise plan, 12-month commit: 600 Infrastructure hosts, 400 APM hosts, 20,000 GB of ingested logs and 3,000 million indexed log events (15-day retention) a month, about 6,000 containers a month, a $425,000 annual commit and a 15 percent volume discount. The quote states an annual total of $442,800.00. It is ready to send.
Verdict: Blocked.
The agent's request. Quote for Halvorsen Retail Cloud on the Datadog Enterprise plan, 12-month commit: 600 Infrastructure hosts, 400 APM hosts, 20,000 GB of ingested logs and 3,000 million indexed log events (15-day retention) a month, about 6,000 containers a month, a $425,000 annual commit and a 5 percent volume discount. The quote states an annual total of $420,660.00. It is ready to send.
Verdict: Allowed.
The agent's request. Quote for Brightmoor Health Platforms on the Datadog Pro plan, 24-month commit: 300 Infrastructure hosts, 350 APM hosts, 0 GB of ingested logs and 1,500 million indexed log events (15-day retention) a month, about 1,800 containers a month, a $230,000 annual commit. The quote states an annual total of $231,600.00. It is ready to send.
Verdict: Blocked.
The agent's request. Quote for Brightmoor Health Platforms on the Datadog Pro plan, 24-month commit: 300 Infrastructure hosts, 300 APM hosts, 10,000 GB of ingested logs and 1,500 million indexed log events (15-day retention) a month, about 1,800 containers a month, a $200,000 annual commit. The quote states an annual total of $222,600.00. It is ready to send.
Verdict: Needs approval.
The agent's request. Quote for Brightmoor Health Platforms on the Datadog Pro plan, 24-month commit: 300 Infrastructure hosts, 300 APM hosts, 10,000 GB of ingested logs and 1,500 million indexed log events (15-day retention) a month, about 1,800 containers a month with 300 prepaid containers, a $230,000 annual commit. The quote states an annual total of $226,200.00. It is ready to send.
Verdict: Allowed.
The agent's request. Quote for Tamarack Labs on the Datadog Pro plan, 12-month commit: 40 Infrastructure hosts, 40 APM hosts, 0 GB of ingested logs and 0 million indexed log events (15-day retention) a month, about 200 containers a month, a $12,000 annual commit. The quote states an annual total of $24,000.00. It is ready to send.
Verdict: Blocked.
The agent's request. Quote for Tamarack Labs on the Datadog Pro plan, 12-month commit: 40 Infrastructure hosts, 40 APM hosts, 0 GB of ingested logs and 0 million indexed log events (15-day retention) a month, about 200 containers a month, a $24,000 annual commit. The quote states an annual total of $24,000.00. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.