Predictika · Gas turbine power block quotes
An AI sales agent prepares a quote for a gas turbine power block: a turbine model, simple cycle or combined cycle, a steam turbine, the number of blocks, and the output, efficiency, emissions and flexibility the customer needs. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the DGT6-300H series and returns a verdict, every reason and the totals it computed.
This validator models Doosan DGT6-300H power block quotes, not just the scenarios shown below.
Any DGT6-300H power block quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: services, other turbine sizes, steam and boiler products, and taxes. The validator shows computed totals but no line-item table.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Steam turbine that must fit the configuration | Only with care Each configuration allows only certain steam turbines, so every pairing needs its own rule, and the rule changes with the number of gas turbines per block. | The configuration and the steam turbine are fields of one request and are checked together on every call. |
| Customer needs against rated values | Only with care Output, efficiency, NOx, load, start time and ramp each need their own comparison with the rating, and the rating changes with the turbine model and configuration. | Every requirement is a field of the request and is compared with the rated value of the chosen configuration on every call. |
| A lower NOx that depends on SCR | Only with care The reachable NOx level depends on whether SCR is added, so the check and the price both depend on that choice. | The SCR choice and the NOx requirement are in one request and are compared on every call. |
| Stated figures that must match the computed ones | Only with workarounds The output and the list total are built from turbines, boilers, steam turbines and blocks, so separate rules are needed to recompute them and compare them with the stated figures. | The stated figures are fields of the request and are compared with the computed ones on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The steam turbine choice does not fit the configuration (simple cycle has none; 1-on-1 uses DST-S10 or DST-S20; 2-on-1 uses DST-S20 or DST-S30). |
| 2 | The customer needs 450 MW; the quoted configuration delivers 400 MW. |
| 3 | The customer asks for 610 tenths of a percent efficiency; the configuration is rated for 600. |
| 4 | The permit needs 10 ppm NOx; this configuration reaches 15 ppm. |
| 5 | The permit needs 8 ppm NOx; this configuration reaches 9 ppm. |
| 6 | The customer needs operation down to 30 percent load; turn-down is 40 percent. |
| 7 | The customer needs a start in 10 minutes; the fast start is 12 minutes. |
| 8 | The customer needs 45 MW per minute per gas turbine; this model ramps at 40. |
| 9 | The quote states 450 MW; the configuration delivers 400 MW. |
| 10 | The quote states a list total of 170 million; the equipment adds up to 178 million. |
| 11 | The discount of 9 million is more than 5 percent of the list total of 178 million; a sales director must approve it. |
| 12 | The discount of 25 million is more than 12 percent of the list total of 178 million. |
| 13 | The DGT6-300H.S2 is the upgraded 380 MW model; a person should confirm its reference status and guarantee terms. |
| 14 | The permit needs 25 ppm NOx; this configuration reaches 30 ppm. |
| 15 | 3 power blocks in one quote; a person should confirm the delivery schedule and manufacturing slots. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote 1 DGT6-300H.S1 1-on-1 combined cycle power block with a DST-S30 steam turbine. The customer needs 450 MW, 59.0 percent efficiency, NOx of 10 ppm, operation down to 30 percent load, a start in 20 minutes and a ramp of 45 MW per minute per gas turbine. The quote states 400 MW and a list total of 220 million dollars, with a discount of 4 million. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 2 DGT6-300H.S1 1-on-1 combined cycle power blocks with a DST-S20 steam turbine and SCR. The customer needs 450 MW, 59.0 percent efficiency, NOx of 10 ppm, operation down to 50 percent load, a start in 20 minutes and a ramp of 30 MW per minute per gas turbine. The quote states 800 MW and a list total of 418 million dollars, with a discount of 4 million. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 1 DGT6-300H.S1 2-on-1 combined cycle power block with a DST-S10 steam turbine. The customer needs 900 MW, 62.0 percent efficiency, NOx of 25 ppm, operation down to 50 percent load, a start in 20 minutes and a ramp of 30 MW per minute per gas turbine. The quote states 800 MW and a list total of 301 million dollars, with a discount of 50 million. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 1 DGT6-300H.S1 2-on-1 combined cycle power block with a DST-S30 steam turbine. The customer needs 780 MW, 60.0 percent efficiency, NOx of 25 ppm, operation down to 50 percent load, a start in 20 minutes and a ramp of 30 MW per minute per gas turbine. The quote states 800 MW and a list total of 361 million dollars, with a discount of 15 million. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 1 DGT6-300H.S1 simple cycle power block with a DST-S10 steam turbine. The customer needs 250 MW, 41.0 percent efficiency, NOx of 25 ppm, operation down to 50 percent load, a start in 8 minutes and a ramp of 30 MW per minute per gas turbine. The quote states 300 MW and a list total of 95 million dollars, with a discount of 0 million. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 1 DGT6-300H.S1 simple cycle power block with no steam turbine. The customer needs 250 MW, 39.0 percent efficiency, NOx of 25 ppm, operation down to 50 percent load, a start in 12 minutes and a ramp of 30 MW per minute per gas turbine. The quote states 270 MW and a list total of 95 million dollars, with a discount of 0 million. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.