Predictika · Coolant heater installation orders
An AI sales agent prepares an order for a Hydronic S3 Economy coolant heater with its fuel, supply voltage, coolant circuit and fuel line installation. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the technical limits and returns a verdict, every reason and the figures it computed.
This validator models Hydronic S3 Economy 12 V heater installation orders, not just the scenarios shown below.
Any Hydronic S3 Economy 12 V installation order that touches these rules is in scope — not only the scenarios pictured here. Not covered: prices (Eberspaecher does not publish a price list for these heaters, so this validator produces no price build-up or line-item quote), the 24 V and commercial variants, the Hydronic S3 D5L and D6L, other heater families, temperature limits, metering pump suction and pressure head limits, and installation positions.
8 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Fuel that depends on the heater model | Only with care A product rule per model and fuel. It works, but every new model or fuel approval is another set of rules to maintain. | The model, fuel and blend are in one request and every pairing is checked together. |
| Output limits that differ by model | Only with care Each model has its own control range, so each needs its own comparison with the requested output. | The model sets the range and the requested output is compared on every call. |
| Stated maximum output that must match the model | Only with care A stated figure is a free-entry field; a rule can compare it with the model, but someone has to write and maintain that comparison. | The stated figure travels with the order and is compared with the model on every call. |
| Installation limits in the coolant circuit and fuel lines | Only with workarounds These are numeric limits on lines the configurator rarely models, so they are often left to a technical review after the quote is saved. | Every limit is checked on every call, whatever order the choices arrive in. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the order is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The fuel on the quote does not match the heater; the B models run on petrol and the D models on diesel. |
| 2 | The B 4 E and B 5 E petrol heaters are not approved for operation with ethanol fuel E85. |
| 3 | Diesel blended with at most 30 percent FAME to EN 14,214 is permitted; the quote has 40 percent. |
| 4 | The 12 volt heater operates between 10.5 and 16 volts; the quote has a supply of 24.0 volts. |
| 5 | The 12 volt heater operates between 10.5 and 16 volts; the quote has a supply of 9.0 volts. |
| 6 | The quote asks for a heat output of 5,000 watts; this heater controls between 1,800 and 4,300 watts. |
| 7 | The quote asks for a heat output of 1,500 watts; this heater controls between 1,800 and 4,300 watts. |
| 8 | The quote states a maximum heat output of 5,000 watts; this heater model gives 4,300 watts. |
| 9 | The heater needs a minimum water flow rate of 300 litres per hour; the quote has 250. |
| 10 | The allowable operating pressure is up to 2.5 bar overpressure; the quote has 3.0 bar. |
| 11 | The coolant mixture needs at least 10 percent and at most 50 percent antifreeze; the quote has 5 percent. |
| 12 | The coolant mixture needs at least 10 percent and at most 50 percent antifreeze; the quote has 60 percent. |
| 13 | The metering pump fuel line on the intake side may be at most 2 metres; the quote has 2.5 metres. |
| 14 | The metering pump fuel line on the pressure side may be at most 6 metres; the quote has 7.0 metres. |
| 15 | The metering pump must be installed with its delivery side rising at an angle of at least 15 degrees; the quote has 10 degrees. |
| 16 | Installing the water pump with the pump head facing downwards is not allowed. |
| 17 | Above 1,500 m the heater can be run only for short periods; a person should confirm the installation altitude of 2,500 m. |
| 18 | The heater needs a minimum water flow rate of 300 litres per hour; the quote has 200. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote a Hydronic S3 Economy B 5 E heater installation on a 24 volt supply, running on ethanol fuel E85, for a heat output of 5,000 watts. The coolant circuit has a flow of 250 litres per hour at 1.5 bar with 60 percent antifreeze, the fuel lines are 1 m on the intake side and 3 m on the pressure side, the metering pump delivery side rises at 20 degrees, the water pump head faces upwards or sideways, and the heater is installed at 500 m altitude. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a Hydronic S3 Economy B 5 E heater installation on a 12 volt supply, running on petrol, for a heat output of 5,000 watts. The coolant circuit has a flow of 250 litres per hour at 1.5 bar with 30 percent antifreeze, the fuel lines are 1 m on the intake side and 3 m on the pressure side, the metering pump delivery side rises at 20 degrees, the water pump head faces upwards or sideways, and the heater is installed at 500 m altitude. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a Hydronic S3 Economy B 5 E heater installation on a 12 volt supply, running on petrol, for a heat output of 5,000 watts. The coolant circuit has a flow of 500 litres per hour at 1.5 bar with 30 percent antifreeze, the fuel lines are 1 m on the intake side and 3 m on the pressure side, the metering pump delivery side rises at 20 degrees, the water pump head faces upwards or sideways, and the heater is installed at 500 m altitude. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote a Hydronic S3 Economy D 5 E heater installation on a 12 volt supply, running on diesel with 40 percent FAME, for a heat output of 4,000 watts and a stated maximum output of 5,000 watts. The coolant circuit has a flow of 500 litres per hour at 1.5 bar with 30 percent antifreeze, the fuel lines are 2.5 m on the intake side and 7 m on the pressure side, the metering pump delivery side rises at 10 degrees, the water pump head faces downwards, and the heater is installed at 500 m altitude. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a Hydronic S3 Economy D 5 E heater installation on a 12 volt supply, running on diesel with 30 percent FAME, for a heat output of 4,000 watts and a stated maximum output of 5,000 watts. The coolant circuit has a flow of 500 litres per hour at 1.5 bar with 30 percent antifreeze, the fuel lines are 2 m on the intake side and 6 m on the pressure side, the metering pump delivery side rises at 20 degrees, the water pump head faces upwards or sideways, and the heater is installed at 500 m altitude. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote a Hydronic S3 Economy B 5 E heater installation on a 12 volt supply, running on petrol, for a heat output of 4,500 watts and a stated maximum output of 5,000 watts. The coolant circuit has a flow of 500 litres per hour at 3 bar with 30 percent antifreeze, the fuel lines are 1 m on the intake side and 3 m on the pressure side, the metering pump delivery side rises at 20 degrees, the water pump head faces upwards or sideways, and the heater is installed at 2,500 m altitude. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a Hydronic S3 Economy B 5 E heater installation on a 12 volt supply, running on petrol, for a heat output of 4,500 watts and a stated maximum output of 5,000 watts. The coolant circuit has a flow of 500 litres per hour at 2.5 bar with 30 percent antifreeze, the fuel lines are 1 m on the intake side and 3 m on the pressure side, the metering pump delivery side rises at 20 degrees, the water pump head faces upwards or sideways, and the heater is installed at 2,500 m altitude. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote a Hydronic S3 Economy B 5 E heater installation on a 12 volt supply, running on petrol, for a heat output of 4,500 watts and a stated maximum output of 5,000 watts. The coolant circuit has a flow of 500 litres per hour at 2.5 bar with 30 percent antifreeze, the fuel lines are 1 m on the intake side and 3 m on the pressure side, the metering pump delivery side rises at 20 degrees, the water pump head faces upwards or sideways, and the heater is installed at 1,200 m altitude. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.