Predictika · Industrial refrigeration package quotes
An AI sales agent prepares a quote for an Enerflex Fastrak refrigeration package for a gas processing or refining customer: a refrigerant, a compressor type, a driver, a unit design, the duty in tons of refrigeration, the evaporating temperature and the shaft power, with commissioning, onsite construction and aftermarket service. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the refrigerants, compressors, drivers and unit designs Enerflex publishes and returns a verdict, every reason, a line-item quote and the figures it computed.
This validator models Fastrak refrigeration package quotes as described on public Enerflex pages, not just the scenarios shown below.
Any Fastrak refrigeration package quote that touches these refrigerants, compressors, drivers and unit designs is in scope — not only the scenarios pictured here. Not covered: Enerflex compression packages, processing plants, contract compression and energy-transition products. Enerflex does not publish prices or selection rules, so every price and limit on this page is illustrative.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| A compressor that must fit the duty and the temperature | Only with care Each compressor type has a range of duty and a lowest evaporating temperature, and the refrigerant has its own lowest temperature. Product rules can express each, but every pair is a rule someone writes and keeps in step. | Duty, temperature, compressor and refrigerant are checked together on every call. |
| Shaft power that has to match the duty | Only with workarounds The power needed per ton of refrigeration climbs steeply as the temperature falls. A quote form accepts any horsepower, so an undersized driver goes through. | The minimum power is computed from the duty and the temperature and compared with the quoted power. |
| A driver that needs something from the site | Only with workarounds A steam turbine needs a steam supply, a gas engine or turbine needs fuel gas, and a zero-emissions requirement allows only an electric motor. These are facts about the site, not products on the quote. | The site facts are inputs, checked against the driver and its power range in one pass. |
| Unit design against size | Only with care Skid-mounted, modular and stick-built units each cover a band of duty, and onsite construction does not apply to a skid. | The duty is checked against the band of the chosen design and the options against the design. |
| A discount whose authority depends on the quote | Only with care Up to 3 percent is fine, more needs a sales director, more than 8 percent is never allowed. Approval tiers are standard. | The discount is compared with the computed list charges and checked with every other rule. |
| A stated total that has to agree with the quote | Only with workarounds Units, services, options and a discount make a total that can drift from what is typed on the quote without anyone noticing. | The total is computed from the choices and compared with the total the quote states. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a person often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The quote has 0 units; at least one is needed. |
| 2 | The duty of 5 tons of refrigeration per unit is outside the 10 to 20,000 TR range of the Fastrak refrigeration packages. |
| 3 | The duty of 5 TR is outside the 10 to 1,500 TR range of this compressor type. |
| 4 | An evaporating temperature of -35 degrees C is below the -30 degrees C this compressor type can reach. |
| 5 | The shaft power of 40,000 HP per unit cannot deliver 25,000 TR at -95 degrees C. |
| 6 | The quote total is $81,540,000, above $20 million, so a person should confirm. |
| 7 | An evaporating temperature of -110 degrees C is outside the range the packages cover, plus 10 down to minus 100 degrees C. |
| 8 | An evaporating temperature of -110 degrees C is below the -100 degrees C this refrigerant can reach. |
| 9 | The shaft power of 90 HP per unit is outside the 100 to 40,000 HP range of the packages. |
| 10 | A gas engine driver is quoted for 6,500 HP per unit; gas engines are used up to 6,000 HP. |
| 11 | A steam turbine driver is quoted for 800 HP per unit; steam turbines start at 1,000 HP. |
| 12 | A steam turbine driver is quoted, and the site has no steam supply. |
| 13 | A gas turbine driver is quoted for 2,500 HP per unit; gas turbines start at 3,000 HP. |
| 14 | A gas engine or gas turbine driver is quoted, and the site has no fuel gas supply. |
| 15 | The customer requires zero on-site emissions, and only an electric motor driver meets it. |
| 16 | A skid-mounted unit is quoted for 1,600 TR; skid-mounted units cover duties up to 1,500 TR. |
| 17 | A modular unit is quoted for 900 TR; modular units cover duties from 1,000 to 8,000 TR. |
| 18 | A stick-built plant is quoted for 3,000 TR; stick-built plants are for duties of 4,000 TR and above. |
| 19 | Onsite construction is quoted for a skid-mounted unit, which is built and shipped complete. |
| 20 | The aftermarket service term is 11 years; the term runs from 0 to 10 years. |
| 21 | The quote takes a discount of $95,180 against $3,156,000 of list charges, above the 3 percent that needs a sales director. |
| 22 | The quote takes a discount of $253,480 against $3,156,000 of list charges, above the 8 percent an agent may offer. |
| 23 | The quote states a total of $3,106,000; the prices give $3,156,000. |
| 24 | The quote has 5 units, above 4, so a person should confirm delivery slots. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote 1 skid-mounted ethylene Fastrak refrigeration package with a single-stage oil-flooded screw compressor and a steam turbine driver of 8,000 HP. The duty is 3,000 TR per unit at an evaporating temperature of -95 degrees C. At the site, fuel gas is available. It includes commissioning and start-up and onsite construction. The discount is $1,845,000. The quote states $8,250,000 in total. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 1 modular ethylene Fastrak refrigeration package with a between-bearing centrifugal compressor and a gas turbine driver of 12,000 HP. The duty is 3,000 TR per unit at an evaporating temperature of -95 degrees C. At the site, fuel gas is available. It includes commissioning and start-up and onsite construction. The discount is $922,500. The quote states $17,527,500 in total. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote 1 modular ethylene Fastrak refrigeration package with a between-bearing centrifugal compressor and a gas turbine driver of 12,000 HP. The duty is 3,000 TR per unit at an evaporating temperature of -95 degrees C. At the site, fuel gas is available. It includes commissioning and start-up and onsite construction. The discount is $369,000. The quote states $18,081,000 in total. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 2 units of skid-mounted ammonia Fastrak refrigeration package with a compound two-stage oil-flooded screw compressor and a gas engine driver of 7,000 HP. The duty is 1,500 TR per unit at an evaporating temperature of -45 degrees C. At the site, fuel gas is available. The customer requires zero on-site emissions. The quote states $4,676,000 in total. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 2 units of skid-mounted propylene Fastrak refrigeration package with a compound two-stage oil-flooded screw compressor and a electric motor driver of 2,800 HP. The duty is 1,500 TR per unit at an evaporating temperature of -45 degrees C. At the site, fuel gas is available. The customer requires zero on-site emissions. The quote states $4,646,000 in total. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 1 skid-mounted propane Fastrak refrigeration package with a two-stage piggyback oil-flooded screw compressor and a electric motor driver of 200 HP. The duty is 50 TR per unit at an evaporating temperature of -20 degrees C. It includes 12 years of aftermarket service. The quote states $176,000 in total. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 1 skid-mounted propane Fastrak refrigeration package with a single-stage oil-flooded screw compressor and a electric motor driver of 200 HP. The duty is 50 TR per unit at an evaporating temperature of -20 degrees C. It includes 5 years of aftermarket service. The quote states $164,000 in total. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.