Predictika · Distributed generation interconnection applications
An AI sales agent prepares an interconnection application for a customer-owned solar array on the ComEd system: the review level, the number of panels and the kilowatts per panel, the line voltage, the circuit type, whether the system exports power, any battery storage and any net metering request. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the review-level rules and returns a verdict, every reason and the nameplate total it computed.
This validator models ComEd interconnection applications, not just the scenarios shown below.
Any ComEd interconnection application that touches these rules is in scope — not only the scenarios pictured here. Not covered: ComEd rate and tariff selection, fees and the other Exelon utilities (PECO, BGE and Pepco). The review levels and limits follow the Illinois Administrative Code Part 466, Section 466.80, as summarized in public sources; the net metering size cap, the supplemental-review threshold and the storage approval are modeled assumptions, not published by ComEd. No prices are modeled.
8 scenarios in 4 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Limits that depend on the review level, the line voltage and the equipment type | Only with care Each level has its own limit, and Level 2 changes it again by voltage and generator type, so every combination needs its own comparison rule. | The review level, voltage and equipment type are fields of the application and the limit is looked up and compared on every call. |
| Conditions that only apply to one circuit type | Only with care Radial, spot network and area network circuits each carry different conditions, so each rule must first test the circuit type. | The circuit type is a field and each condition is checked together with it. |
| A request that depends on another field, such as net metering needing export | Only with workarounds A rule has to compare the request with the export field and with the size cap, and keep both in step as the application changes. | Net metering, export and size are checked in the same pass. |
| A large application that needs a person to confirm a review | Only with workarounds An approval threshold sits below a block threshold on the same field, so the approval rule must exclude what the block rule catches. | The nameplate total is compared with the block limit and the approval threshold in one pass. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the application is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the submission; approval findings need a person to sign off; everything else is computed.
| 1 | The application is for review Level 1 and the total nameplate is 26 kW; Level 1 is limited to 25 kW. |
| 2 | Level 1 covers lab-certified inverter-based equipment only; this application lists equipment that is not. |
| 3 | The application is for review Level 2 and the total nameplate is 502 kW; the Level 2 limit for this line voltage and generator type is 500 kW (0 means not eligible at this voltage). |
| 4 | Level 2 request of 3,000 kW is above 2,000 kW, so a person should confirm whether a supplemental review is needed. |
| 5 | The application is for review Level 2 and the total nameplate is 3,002 kW; the Level 2 limit for this line voltage and generator type is 3,000 kW (0 means not eligible at this voltage). |
| 6 | Level 2 request of 4,000 kW is above 2,000 kW, so a person should confirm whether a supplemental review is needed. |
| 7 | The application is for review Level 2 and the total nameplate is 4,002 kW; the Level 2 limit for this line voltage and generator type is 4,000 kW (0 means not eligible at this voltage). |
| 8 | Level 2 request of 5,000 kW is above 2,000 kW, so a person should confirm whether a supplemental review is needed. |
| 9 | The application is for review Level 2 and the total nameplate is 5,002 kW; the Level 2 limit for this line voltage and generator type is 5,000 kW (0 means not eligible at this voltage). |
| 10 | The application is for review Level 2 and the total nameplate is 200 kW; the Level 2 limit for this line voltage and generator type is 0 kW (0 means not eligible at this voltage). |
| 11 | The application is for review Level 2 and the total nameplate is 2,002 kW; the Level 2 limit for this line voltage and generator type is 2,000 kW (0 means not eligible at this voltage). |
| 12 | Level 2 requires lab-certified interconnection equipment; this application lists equipment that is not certified. |
| 13 | Level 2 applies to a radial distribution circuit or a spot network serving only one customer, not an area network. |
| 14 | Level 3 applies to facilities that do not export power onto the distribution system; this application exports. |
| 15 | A Level 3 facility on a radial circuit cannot be served by a shared transformer. |
| 16 | The total generation on the radial circuit including this facility is 11 MVA; Level 3 allows 10 MVA or less. |
| 17 | On the load side of an area network Level 3 is limited to 50 kW; the total nameplate is 52 kW. |
| 18 | On an area network Level 3 requires a lab-certified inverter-based equipment package. |
| 19 | Level 4 is limited to 10 MVA of nameplate; the total nameplate is 10,010 kW. |
| 20 | Net metering was requested but the system does not export power to the grid. |
| 21 | Net metering was requested for 2,002 kW; the modeled size cap is 2,000 kW. |
| 22 | Level 2 request of 2,002 kW is above 2,000 kW, so a person should confirm whether a supplemental review is needed. |
| 23 | The application states a total of 24 kW but units x kW per unit comes to 20 kW, so a person should confirm the nameplate. |
| 24 | A Level 1 application with 10 kWh of battery storage that can export needs a person to confirm the storage is covered by the certified package. |
| 25 | The application is for review Level 1 and the total nameplate is 40 kW; Level 1 is limited to 25 kW. |
| 26 | The application states a total of 15 kW but units x kW per unit comes to 20 kW, so a person should confirm the nameplate. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please prepare a Level 1 interconnection application for a commercial solar array of 200 panels of 2 kilowatts each on a radial circuit at a line voltage of under 5 kV, total 400 kilowatts, with equipment that is not lab-certified, exporting power to the grid. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a Level 2 interconnection application for a commercial solar array of 200 panels of 2 kilowatts each on a radial circuit at a line voltage of under 5 kV, total 400 kilowatts, with certified equipment, exporting power to the grid. It is ready to send.
Verdict: Allowed.
The agent's request. Please prepare a Level 2 interconnection application for a commercial solar array of 1,500 panels of 2 kilowatts each on a radial circuit at a line voltage of 5 to 15 kV, total 3,000 kilowatts, with certified equipment, exporting power to the grid, and net metering requested. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a Level 2 interconnection application for a commercial solar array of 1,500 panels of 2 kilowatts each on a radial circuit at a line voltage of 5 to 15 kV, total 3,000 kilowatts, with certified equipment, exporting power to the grid. It is ready to send.
Verdict: Needs approval.
The agent's request. Please prepare a Level 1 interconnection application for a residential solar array of 15 panels of 2 kilowatts each on a radial circuit at a line voltage of under 5 kV, total 30 kilowatts, with certified equipment, exporting power to the grid, with 13 kilowatt-hours of battery storage, and net metering requested. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a Level 1 interconnection application for a residential solar array of 10 panels of 2 kilowatts each on a radial circuit at a line voltage of under 5 kV, total 20 kilowatts, with certified equipment, exporting power to the grid, and net metering requested. It is ready to send.
Verdict: Allowed.
The agent's request. Please prepare a Level 3 interconnection application for a commercial solar array of 30 panels of 2 kilowatts each on an area network at a line voltage of under 5 kV, total 60 kilowatts, with certified equipment, not exporting power. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a Level 3 interconnection application for a commercial solar array of 25 panels of 2 kilowatts each on an area network at a line voltage of under 5 kV, total 50 kilowatts, with certified equipment, not exporting power. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.