Predictika · Board-mount power module orders
An AI sales agent prepares an order for isolated DC/DC power modules for a customer's board: which module, how many, the supply bus it will run from, the output voltage and load, any peak load, the height available and whether modules share a load. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the published selection guide and returns a verdict, every reason and the figures it computed.
This validator models an order for the digital isolated regulated DC/DC converters in the Flex Power Modules 2026 Selection Guide (31 listed product references), not just the scenarios shown below.
Any order for these converters that touches these rules is in scope — not only the scenarios pictured here. Not covered: prices (the selection guide gives none, so this page shows no price build-up), the analog, 48 V non-isolated, point-of-load, VRM, VPD, HVDC, PIM, RF power amplifier and industrial lines, efficiency, thermal derating, and ordering codes beyond the product references in the guide. Assumptions: the guide lists output current as a single figure, which the model uses as the continuous rating; peak power is used as listed, with no duration.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Input and output voltage windows | Easy A range comparison per module is straightforward once the table is loaded. | Both ends of the bus range and the output voltage are compared with the chosen module on every call. |
| Paralleling only where the module lists load sharing | Only with care Whether a module may be paralleled and by which scheme depends on a note against each product reference, so each reference needs its own flag kept in step with the guide. | The module, the number ordered and the sharing scheme asked for are checked together on every call. |
| Peak power with no duration given | Only with workarounds A rule has to separate continuous, peak and over-peak load, and the middle case needs a person, which a simple limit does not express. | Above the peak rating blocks; between continuous and peak goes to a person; the rest passes. |
| Totals that must match what the order states | Only with care The total comes from the module and the quantity, and has to agree with the figure written in the order. | The total is computed from the modules and compared with the stated figure. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the order is saved or a step is completed, so a person often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The bus can fall to 36 V; this module takes 40 V at the lowest. |
| 2 | The bus can rise to 65 V; this module takes 60 V at the highest. |
| 3 | The bus can rise to 75 V; this module takes 60 V at the highest. |
| 4 | The board needs 14 V; this module goes up to 13.2 V. |
| 5 | The board needs 7.5 V; this module goes down to 8 V. |
| 6 | The board needs 12.45 V; this module goes up to 12 V. |
| 7 | The load draws 140 A; the modules on the order supply 108.4 A. |
| 8 | The load draws 108.5 A; the modules on the order supply 108.4 A. |
| 9 | The load peaks at 2,400 W, above the continuous 1,400 W; the selection guide gives peak power without its duration, so a person should confirm the load profile. |
| 10 | The load peaks at 2,500 W; the modules on the order give 2,400 W at most. |
| 11 | More than one module is ordered for one load, and the selection guide lists no current or load sharing for this module. |
| 12 | The modules are to share the load by a different scheme than the one listed for this module (active current sharing or droop load sharing). |
| 13 | The module is 13.8 mm high; the board has room for 13 mm. |
| 14 | A baseplated version is wanted; the selection guide states baseplated versions only for the eighth-brick modules, so a person should confirm one exists for this module. |
| 15 | The order states 1,000 W in total; the modules on the order give 1,300 W. |
| 16 | The order needs at least 1 module; it has 0. |
| 17 | The load draws 100 A; the modules on the order supply 0 A. |
| 18 | The board needs 27 V; this module goes up to 26.4 V. |
| 19 | The load peaks at 2,000 W, above the continuous 1,400 W; the selection guide gives peak power without its duration, so a person should confirm the load profile. |
| 20 | The load peaks at 700 W; the modules on the order give 600 W at most. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please place an order for two BMR4580011/017 digital DC/DC converters for Northfield Networks. The supply bus runs from 36 V to 60 V and the board needs 14 V at 120 A. The modules share the load by droop load sharing. The order states 1,300 W in total. It is ready to send.
Verdict: Blocked.
The agent's request. Please place an order for two BMR4580011/017 digital DC/DC converters for Northfield Networks. The supply bus runs from 40 V to 60 V and the board needs 12.45 V at 100 A. The modules share the load by droop load sharing. The order states 1,300 W in total. It is ready to send.
Verdict: Allowed.
The agent's request. Please place an order for two BMR4912307/856 digital DC/DC converters for Harbor Compute. The supply bus runs from 48 V to 56 V and the board needs 12 V at 300 A. The modules share the load by active current sharing. The order states 2,800 W in total. It is ready to send.
Verdict: Blocked.
The agent's request. Please place an order for two BMR4912314/880 digital DC/DC converters for Harbor Compute. The supply bus runs from 48 V to 56 V and the board needs 12 V at 300 A. The modules share the load by active current sharing. The order states 2,800 W in total. It is ready to send.
Verdict: Allowed.
The agent's request. Please place an order for one BMR4920300/864 digital DC/DC converter for Alder Instruments. The supply bus runs from 40 V to 60 V and the board needs 12 V at 60 A, with a peak load of 1,200 W. A baseplated version is wanted. The order states 800 W in total. It is ready to send.
Verdict: Blocked.
The agent's request. Please place an order for one BMR4920300/864 digital DC/DC converter for Alder Instruments. The supply bus runs from 40 V to 60 V and the board needs 12 V at 60 A, with a peak load of 1,000 W. A baseplated version is wanted. The order states 800 W in total. It is ready to send.
Verdict: Needs approval.
The agent's request. Please place an order for one BMR4920300/864 digital DC/DC converter for Alder Instruments. The supply bus runs from 40 V to 60 V and the board needs 12 V at 60 A, with a peak load of 800 W. A baseplated version is wanted. The order states 800 W in total. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.