Predictika · FuelCell Energy Block Systems
An AI sales agent prepares an order for FuelCell Energy Block Systems from public data sheets: how many systems, which fuel, the grid connection and the site. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of those data sheets and returns a verdict, every reason and the figures it computed.
This validator models orders for the two FuelCell Energy Block Systems in FuelCell Energy's April 2026 data sheets (1.25 MW and 2.5 MW), not just the scenarios shown below.
Any order for these two systems that touches these rules is in scope — not only the scenarios pictured here. Not covered: prices (FuelCell Energy publishes none for these products, so this validator produces no price build-up or line-item quote), the 12.5 MW block and other FuelCell Energy products, carbon capture, service and power purchase agreements, and any change FuelCell Energy has made to its products since these sheets were published.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Biogas ordered without the pre-conditioning the sheet requires | Only with care Fuel type and the pre-conditioning requirement sit in different places, so a rule has to link them for each plant model. | The fuel and the pre-conditioning are in one request and compared with the sheet on every call. |
| Hydrogen share above the listed 50 percent, and a methane share that differs from the 60 percent rating basis | Only with care The hydrogen limit applies only to blends and the methane rating basis only to biogas, so each needs its own fuel-specific rule and message. | Both are checked on every call: a block above 50 percent hydrogen, an approval when biogas methane differs from the rating basis. |
| Grid voltage that does not match the system (480 V against 13,800 V) | Only with care A per-model voltage table has to be maintained and compared with a free-entry voltage. | The interconnection voltage is compared with the system on every call: a block for low voltage, an approval for another medium voltage. |
| Total output stated by the agent that does not equal systems times output | Only with workarounds The stated figure is usually free text or a separate field, so it takes an extra rule that multiplies and compares. | The stated figure is part of the request and is compared with the computed figure on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The system outputs 480 V, 60 Hz as listed; the order specifies 13,800 V, a medium voltage the data sheet offers only on request. |
| 2 | The system outputs 13,800 V, 60 Hz as listed, and the data sheet offers only other medium voltages on request; the order specifies a 480 V interconnection. |
| 3 | The data sheets list 60 Hz; the order specifies 50 Hz. |
| 4 | The order has 0 units; at least one is needed. |
| 5 | The systems are listed for outdoor operation from -20 to 120 degrees F; the site ranges from -25 to 100 degrees F. |
| 6 | The systems are listed for outdoor operation from -20 to 120 degrees F; the site ranges from -10 to 125 degrees F. |
| 7 | The pad (50 x 60 ft) is smaller than the listed footprint of one system (58 x 42 ft). |
| 8 | The pad (75 x 50 ft) is smaller than the listed footprint of one system (72 x 60 ft). |
| 9 | The pad (58 x 42 ft) is smaller than the listed footprint of one system (72 x 60 ft). |
| 10 | The systems are listed for 0 to 50 percent hydrogen blending; the order has 55 percent. |
| 11 | A hydrogen share of 20 percent is only listed for natural gas and hydrogen blends. |
| 12 | A hydrogen share of 10 percent is only listed for natural gas and hydrogen blends. |
| 13 | Biogas must be pre-conditioned to meet the fuel composition requirements of the system; the order has no pre-conditioning. |
| 14 | The systems list biogas with 55 to 100 percent methane; the order has 50 percent. |
| 15 | The sheet ratings for biogas are based on 60 percent methane; the order has 55 percent, so delivered performance may differ. |
| 16 | The sheet ratings for biogas are based on 60 percent methane; the order has 100 percent, so delivered performance may differ. |
| 17 | The sheet ratings for biogas are based on 60 percent methane; the order has 70 percent, so delivered performance may differ. |
| 18 | The systems list a fuel inlet pressure of 15 to 20 psig; the order has 12 psig. |
| 19 | The systems list a fuel inlet pressure of 15 to 20 psig; the order has 25 psig. |
| 20 | The order states 4,000 kW in total, but 4 system(s) at 1,250 kW each give 5,000 kW. |
| 21 | The order states 7,000 kW in total, but 3 system(s) at 2,500 kW each give 7,500 kW. |
| 22 | A hydrogen share of 45 percent is only listed for natural gas and hydrogen blends. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote four 1.25 MW FuelCell Energy Block Systems running on biogas, connected at 480 V, for 5,000 kW in total. The pad is 62 x 46 ft. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote four 1.25 MW FuelCell Energy Block Systems running on biogas, connected at 480 V, for 5,000 kW in total. The pad is 62 x 46 ft. The biogas is pre-conditioned. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote two 2.5 MW FuelCell Energy Block Systems running on a natural gas and hydrogen blend with 55 percent hydrogen, connected at 480 V, for 5,000 kW in total. The pad is 75 x 65 ft. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote two 2.5 MW FuelCell Energy Block Systems running on a natural gas and hydrogen blend with 55 percent hydrogen, connected at 13,800 V, for 5,000 kW in total. The pad is 75 x 65 ft. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote two 2.5 MW FuelCell Energy Block Systems running on a natural gas and hydrogen blend with 45 percent hydrogen, connected at 13,800 V, for 5,000 kW in total. The pad is 75 x 65 ft. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote three 1.25 MW FuelCell Energy Block Systems running on natural gas, connected at 480 V, for 4,000 kW in total. The pad is 62 x 46 ft. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote three 1.25 MW FuelCell Energy Block Systems running on natural gas, connected at 480 V, for 3,750 kW in total. The pad is 62 x 46 ft. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.