Predictika · Gas turbine power plant quotes
An AI sales agent prepares a gas turbine plant quote for a fictional customer: the turbine model, number of units, simple or combined cycle, grid frequency, emissions permit, service agreement and schedule. Before it goes out, the agent sends it to Predictika’s validator, which checks it against the plant and commercial rules, compares the total the agent states with its own, and returns a verdict with every reason.
This validator models the rules for a gas turbine plant quote to a utility or power producer. It handles any quote built from these turbine families, cycles and terms, not just the scenarios shown below.
It does not cover plant balance-of-plant design, multi-site or multi-phase projects, financing, or real product ratings and prices. Ratings, prices, lead times and thresholds are estimates from public information.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ or Revenue Cloud) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator catches | Typical rules-based CPQ | Predictika |
|---|---|---|
| Turbine, cycle and grid fit | Only with workarounds Frequency, cycle, altitude derate and output are chained conditions across product families, usually a rule set per turbine model. | Each turbine is data in a catalog; the same rules evaluate every model and combination. |
| Emissions permit and SCR | Only with care Comparing a permit with a model’s emissions and adding SCR needs a validation rule and a price rule that must be kept in step. | Permit, turbine emissions and SCR are evaluated together with every other rule, and the reason names the fix. |
| Schedule against lead time | Only with care Lead time depends on the model and the cycle, so a calculated field and a validation rule are needed for each case. | Lead time and start time are derived on each call and compared with the schedule. |
| Concession authority bands | Only with care An approval band, a hard maximum and a plant-size tier are separate price and validation rules that must be chained. | Concession, plant size and authority are derived on each call and compared with both thresholds. |
| The total the agent states | Only with workarounds Comparing a stated figure with a computed one means a separate rule per layout, and price rules rarely run on stated figures. | The stated total is a field in the request and is checked against the computed total. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is built, so a problem raised late can hide an earlier one. | Every rule is evaluated at the end of input and all findings come back together. |
Every rule is checked on every call, in whatever order the choices arrive, and one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| Rule | Effect | What it checks |
|---|---|---|
| 1 | block | The turbine frequency must match the grid (the aeroderivative units run on 50 or 60 Hz) |
| 2 | block, approval | Installed output, derated 3 percent per 1,000 feet of altitude, must meet the requirement; more than 150 percent of it needs approval |
| 3 | block | Turbine NOx (2 ppm with SCR) must be within the permit |
| 4 | block | Hydrogen blend must be within the combustor capability of the turbine |
| 5 | block | Start time to full load (longer in combined cycle) must fit the site requirement |
| 6 | block | HA-class units need a contractual service agreement; a combined-cycle block holds at most 3 turbines |
| 7 | block | Turbine lead time (longer in combined cycle) must fit the months to commercial operation |
| 8 | block, approval | A price concession above the 2 percent sales authority needs approval; above 5 percent (8 percent on large plants) blocks |
| 9 | computed | Plant price is units times the unit price, with adders for combined cycle, SCR and hydrogen capability; the service agreement is added |
| 10 | block | The total the agent states must match the validator total within $0.05 million |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Quote for Prairie Wind Power: one GE Vernova 9HA.01 gas turbine in simple cycle for the 400 MW requirement on the 60 Hz grid, 25 ppm NOx permit, commercial operation in 36 months. Total price $225.20 million. Ready to send.
Verdict: Blocked.
The agent's request. Quote for Prairie Wind Power: one GE Vernova 7HA.03 gas turbine in simple cycle for the 400 MW requirement on the 60 Hz grid, 25 ppm NOx permit, commercial operation in 36 months. Total price $214.48 million. Ready to send.
Verdict: Allowed.
The agent's request. Quote for Riverbend Energy: one GE Vernova 7HA.02 gas turbine in 1x1 combined cycle for the 550 MW requirement on the 60 Hz grid, 2 ppm NOx permit, commercial operation in 40 months. Total price $321.60 million. Ready to send.
Verdict: Blocked.
The agent's request. Quote for Riverbend Energy: one GE Vernova 7HA.02 gas turbine in 1x1 combined cycle with SCR for the 550 MW requirement on the 60 Hz grid, 2 ppm NOx permit, commercial operation in 40 months. Total price $329.60 million. Ready to send.
Verdict: Allowed.
The agent's request. Quote for Mesa Grid Partners: two GE Vernova 7F.05 gas turbines in 1x1 combined-cycle blocks for the 700 MW requirement on the 60 Hz grid, 9 ppm NOx permit, 20-year full service agreement, 2 percent price concession, commercial operation in 30 months. Total price $401.80 million. Ready to send.
Verdict: Blocked.
The agent's request. Quote for Mesa Grid Partners: two GE Vernova 7F.05 gas turbines in 1x1 combined-cycle blocks for the 700 MW requirement on the 60 Hz grid, 9 ppm NOx permit, 20-year full service agreement, 2 percent price concession, commercial operation in 30 months. Total price $481.80 million. Ready to send.
Verdict: Allowed.
The agent's request. Quote for Coastal Power Authority: two GE Vernova 7HA.03 gas turbines in 1x1 combined-cycle blocks for the 1,200 MW requirement on the 60 Hz grid, 2 ppm NOx permit with SCR, 6 percent price concession, commercial operation in 44 months. Total price $722.00 million. Ready to send.
Verdict: Needs approval.
The text of the narrated walkthrough, step by step.