Predictika · Enterprise ICT and connectivity quotes

An AI sales agent's HGC enterprise ICT quote, checked before it goes out

An AI sales agent prepares a quote for a business customer of HGC Global Communications, the Hong Kong enterprise ICT and telecom operator: Dedicated Internet Access, Business Broadband or MetroNET at every site, with HGC SDWAN, cloud connections to AWS, Azure and other clouds, Anti-DDoS Service, SIP Trunk and GC Telehousing colocation, on a term of 12, 24, 36 or 60 months, priced in Hong Kong dollars. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of how those services fit together and returns a verdict, every reason, a line-item quote and the figures it computed.

Scope: HGC enterprise ICT quotes: Dedicated Internet Access, Business Broadband, MetroNET, HGC SDWAN, HGC AWS Direct Connect, HGC Azure ExpressRoute, HGC Multi-Cloud Connect, Anti-DDoS Service, SIP Trunk and GC Telehousing colocation, for any number of sites, on a 12-, 24-, 36- or 60-month term. See everything this validator covers

This validator models multi-site HGC enterprise ICT quotes as described on the public HGC business and international pages, not just the scenarios shown below.

  • Access services — Dedicated Internet Access (symmetrical, up to 1000 Mbps), Business Broadband (up to 2,500 Mbps, dynamic or fixed IP) and MetroNET (Layer 2 Metro Ethernet on Fast Ethernet, Gigabit Ethernet or 10 Gigabit Ethernet ports, with Standard, Dual Home or Dual Port packages), at any number of sites, each site with exactly one access service.
  • Overlay, cloud and security — HGC SDWAN licenses and UTM, HGC AWS Direct Connect, HGC Azure ExpressRoute and HGC Multi-Cloud Connect, and Anti-DDoS Service on Internet sites.
  • Voice and colocation — SIP Trunk channels and interfaces for a SIP-capable PBX, and GC Telehousing colocation racks with their power, cooling, space and cross-connects.
  • What the validator checks — that every site has exactly one access service in a building on the HGC fiber network or a new build with a long enough term; that speeds stay within each service's published maximum and that bandwidth fits the port; that the Resilient service level has a Dual Home or Dual Port package at every MetroNET site; that Anti-DDoS Service sits on Internet sites; that SD-WAN sites have a license and a second path; that cloud connections respect their speed limits and hand-off port; that the equipment fits the colocation racks in power, cooling and space and has a cross-connect for every cloud hand-off; that SIP Trunk channels fit their interfaces and a SIP-capable PBX; that the term is 12, 24, 36 or 60 months; that the discount is within limits; and that the stated contract total matches the computed one.
  • Approvals — a 60-month term, a contract total above HKD 30 million, three or more new fiber builds, a discount above 10 percent, more SD-WAN licenses than sites, and little power headroom in the racks go to a person.

Any HGC quote that touches these services is in scope — not only the scenarios pictured here. Not covered: IP Transit, MetroLambda, DWDM / CWDM, IPLC and other carrier and wholesale services, voice tariffs and IDD, Centrex, unified communications and call centre, Cloud Backup and hosted email, other cybersecurity services, Wi-Fi, taxes and negotiated discounts beyond the percentage modeled. HGC publishes almost no prices, so every price on this page is illustrative.

The AI sales agentBuilds the HGC quote from the conversation with the customer and says it is ready.
Predictika validatorChecks every rule at once and returns the verdict, each finding, and the computed figures.

7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch

What the agent proposes

The AI sales agent says

Illustrative agent statement. The validator receives the structured request below.

Proposing agent: AI sales agent (scripted)

Before sending, the agent must call Recorded run

Predictika validator


      
Waiting for the call.

Where rules-based CPQ gets it wrong

Click to expand

Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.

What the validator caughtTypical rules-based CPQPredictika
Bandwidth against the port, and cloud-connect speed limitsOnly with care
A product rule can cap bandwidth by port type for one service, but it has to be repeated for MetroNET and again for each cloud connection type with its own limit, and the hand-off port is a separate field.
Bandwidth, port type, cloud provider limits and hand-off port are checked against each other in one pass.
Colocation power, cooling, space and cross-connects against the equipmentOnly with workarounds
The equipment is not a product on the quote; its power draw and size have to be loaded as fields and compared with racks times power tier, the cooling add-on and 42U per rack, and cross-connects counted against cloud hand-offs.
Equipment power, cooling, space and cross-connects are facts in the request and are checked against the racks together.
A Resilient service level at every MetroNET siteOnly with care
The Dual Home and Dual Port packages have to be counted across sites and compared with the MetroNET site count, which a rep can leave out.
Packages, sites and the service level are compared on every call.
SD-WAN licenses, sites and second pathsOnly with workarounds
Licenses, SD-WAN sites, UTM sites and sites with a second path are four counts that have to be kept consistent with the sites quoted for access.
The four counts are checked against each other and against the sites in one pass.
Fiber coverage, new builds and the minimum termOnly with workarounds
Whether a building is on the HGC fiber network comes from an address check outside the quote; it has to be loaded as a field, compared with the sites quoted, and tied to a 36-month minimum when a new build is added.
Sites, fiber coverage, new builds and the 36-month minimum are checked together on every call.
Discount, install charges and the stated totalOnly with workarounds
The discount applies to the monthly charges only, installation is waived by term for one service and not for others, and nothing compares the stated total with the priced one.
The discount, the install rules, the term and the stated total are computed together and the stated total is compared with the priced one.
Every problem returned in one answerOnly with workarounds
Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next.
All findings come back together, whatever order the choices arrived in.

What this validator catches: findings from its test cases

Click to expand

Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.

1The quote has a 60 month term, a long price commitment, so a person should confirm.
2The quote has a term of 18 months; the services are quoted for 12, 24, 36 or 60 months.
3The quote includes no HGC service, so there is nothing to price.
4The quote gives 6 sites an access service (Dedicated Internet Access, Business Broadband or MetroNET) but the customer has 7 sites; each site needs exactly one.
5A count in the quote is larger than the total it belongs to: 3 Dual Home or Dual Port sites out of 2 MetroNET sites, 0 SD-WAN sites out of 6 sites, 0 UTM sites out of 0 SD-WAN sites, 0 high-density racks out of 0 racks, 0 cloud hand-offs in colocation out of 0 cloud connections.
6The quote has 2 cross-connects and 3 cloud connections handed off in colocation; each hand-off needs a cross-connect.
7The quote puts 6 sites on HGC access, but only 5 are in buildings on the HGC fiber network and 0 are quoted as new builds.
8The quote has 1 new fiber builds on a term of 24 months; a new build needs a term of at least 36 months.
9The quote includes 3 new fiber builds, a construction commitment, so a person should confirm.
102 Dedicated Internet Access sites are quoted at 10 Gbps; the service is published at a maximum of 1,000 Mbps.
112 Business Broadband sites are quoted at 10 Gbps; the service is published at up to 2,500 Mbps.
122 MetroNET sites are quoted at a bandwidth that the port cannot carry; a Fast Ethernet port carries 100 Mbps and a Gigabit Ethernet port carries 1 Gbps.
13The quote asks for the Resilient service level with a Dual Home or Dual Port package at 1 of 2 MetroNET sites; that level needs one at every MetroNET site.
14The quote protects 5 sites with Anti-DDoS Service, but only 4 have Dedicated Internet Access or Business Broadband.
15The quote puts HGC SDWAN on 6 sites with 5 licenses; every SD-WAN site needs a license.
16The quote has 7 HGC SDWAN licenses for 6 SD-WAN sites, more licenses than sites, so a person should confirm.
17The quote puts HGC SDWAN on 6 sites and only 4 have a second path (MPLS, Internet, 4G or 5G) for multi-path routing.
18The quote has 1 HGC Azure ExpressRoute connections at 10 Gbps; this validator limits them to 5 Gbps.
19The quote has 1 HGC Multi-Cloud Connect connections above 1 Gbps; this validator limits them to 1 Gbps.
20The 1 cloud connections are quoted above 1 Gbps on a Gigabit Ethernet hand-off port; speeds above 1 Gbps need a 10 Gigabit Ethernet port.
21The equipment draws 25 kW and the 4 racks supply 24 kW.
22The equipment draws 25 kW and the cooling for 4 racks, 0 of them high-density, covers 24 kW.
23The equipment takes 180 rack units and the 4 racks hold 168 rack units at 42U each.
24The equipment draws 23 kW of the 24 kW the racks supply; there is little power headroom, so a person should confirm.
25The quote includes 400 SIP Trunk channels and the customer PBX is not SIP-capable; SIP Trunk connects a SIP-capable IP PABX.
26The quote has 851 SIP Trunk channels on 1 interfaces, which carry up to 850 channels at 850 per interface.
27The quote gives a discount of 15 percent, above 10 percent, so a person should confirm.
28The quote gives a discount of 30 percent; discounts above 25 percent are not allowed.
29The quote states a contract total of HK$2,371,199; the prices give HK$2,371,200.

Scenarios and results

Click to expand

The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.

1. Securities group, 34 sites: A quote for a securities group: 34 sites with Internet, MetroNET, SD-WAN, cloud connections, colocation and voice

The agent's request. Please quote HGC service for 34 sites on a 36 month term: Dedicated Internet Access at 10 Gbps for 6 sites, Business Broadband at 1 Gbps with a single fixed IP for 14 sites, MetroNET at 5 Gbps on Gigabit Ethernet ports for 14 sites, with Dual Home at 8 sites and Dual Port at 2 sites, the Resilient service level on MetroNET, Anti-DDoS Service at 24 sites, HGC SDWAN for 20 sites with 16 licenses and UTM at 20 sites, 2 HGC AWS Direct Connect connections, 2 HGC Azure ExpressRoute connections and 1 HGC Multi-Cloud Connect connection, cloud connections at 10 Gbps on Gigabit Ethernet hand-off ports, 5 handed off in colocation, GC Telehousing colocation at Chai Wan with 6 racks at 6 kW and 3 cross-connects, SIP Trunk with 480 channels on 1 interface, and a 5 percent discount on the monthly charges. The quote states HK$65,185,200 over the contract. It is ready to send.

Verdict: Blocked.

  • Not enough buildings on the HGC fiber network. The quote puts 34 sites on HGC access, but only 32 are in buildings on the HGC fiber network and 0 are quoted as new builds.
  • Dedicated Internet Access is above its maximum speed. 6 Dedicated Internet Access sites are quoted at 10 Gbps; the service is published at a maximum of 1,000 Mbps.
  • MetroNET bandwidth is more than the port can carry. 14 MetroNET sites are quoted at a bandwidth that the port cannot carry; a Fast Ethernet port carries 100 Mbps and a Gigabit Ethernet port carries 1 Gbps.
  • Resilient service level needs Dual Home or Dual Port at every site. The quote asks for the Resilient service level with a Dual Home or Dual Port package at 10 of 14 MetroNET sites; that level needs one at every MetroNET site.
  • Anti-DDoS Service on sites without Internet access. The quote protects 24 sites with Anti-DDoS Service, but only 20 have Dedicated Internet Access or Business Broadband.
  • SD-WAN sites without a license. The quote puts HGC SDWAN on 20 sites with 16 licenses; every SD-WAN site needs a license.
  • Azure ExpressRoute above its speed limit. The quote has 2 HGC Azure ExpressRoute connections at 10 Gbps; this validator limits them to 5 Gbps.
  • Multi-Cloud Connect above its speed limit. The quote has 1 HGC Multi-Cloud Connect connections above 1 Gbps; this validator limits them to 1 Gbps.
  • Cloud-connect bandwidth is more than the port can carry. The 5 cloud connections are quoted above 1 Gbps on a Gigabit Ethernet hand-off port; speeds above 1 Gbps need a 10 Gigabit Ethernet port.
  • Equipment draws more power than the racks supply. The equipment draws 58 kW and the 6 racks supply 36 kW.
  • Equipment needs more cooling than the racks provide. The equipment draws 58 kW and the cooling for 6 racks, 0 of them high-density, covers 36 kW.
  • Too few cross-connects for the cloud hand-offs. The quote has 3 cross-connects and 5 cloud connections handed off in colocation; each hand-off needs a cross-connect.
  • Stated total does not match. The quote states a contract total of HK$65,185,200; the prices give HK$65,404,200.
  • Contract total over HKD 30 million. The contract total is HK$65,404,200, above 30 million, so a person should confirm.

2. Securities group, 34 sites: The agent resubmits after fixing the errors

The agent's request. Please quote HGC service for 34 sites on a 36 month term: Dedicated Internet Access at 1 Gbps for 6 sites, Business Broadband at 1 Gbps with a single fixed IP for 14 sites, MetroNET at 1 Gbps on Gigabit Ethernet ports for 14 sites, with Dual Home at 8 sites and Dual Port at 6 sites, the Resilient service level on MetroNET, 2 new fiber builds, Anti-DDoS Service at 20 sites, HGC SDWAN for 20 sites with 16 licenses and UTM at 20 sites, 2 HGC AWS Direct Connect connections, 2 HGC Azure ExpressRoute connections and 1 HGC Multi-Cloud Connect connection, cloud connections at 5 Gbps on 10 Gigabit Ethernet hand-off ports, 5 handed off in colocation, GC Telehousing colocation at Chai Wan with 7 racks at 10 kW, high-density cooling on 1 rack and 3 cross-connects, SIP Trunk with 480 channels on 1 interface, and a 5 percent discount on the monthly charges. The quote states HK$32,920,920 over the contract. It is ready to send.

Verdict: Blocked.

  • SD-WAN sites without a license. The quote puts HGC SDWAN on 20 sites with 16 licenses; every SD-WAN site needs a license.
  • Multi-Cloud Connect above its speed limit. The quote has 1 HGC Multi-Cloud Connect connections above 1 Gbps; this validator limits them to 1 Gbps.
  • Equipment needs more cooling than the racks provide. The equipment draws 58 kW and the cooling for 7 racks, 1 of them high-density, covers 48 kW.
  • Too few cross-connects for the cloud hand-offs. The quote has 3 cross-connects and 5 cloud connections handed off in colocation; each hand-off needs a cross-connect.
  • Stated total does not match. The quote states a contract total of HK$32,920,920; the prices give HK$33,265,920.
  • Contract total over HKD 30 million. The contract total is HK$33,265,920, above 30 million, so a person should confirm.

3. Securities group, 34 sites: The agent resubmits after fixing the errors

The agent's request. Please quote HGC service for 34 sites on a 36 month term: Dedicated Internet Access at 1 Gbps for 6 sites, Business Broadband at 1 Gbps with a single fixed IP for 14 sites, MetroNET at 1 Gbps on Gigabit Ethernet ports for 14 sites, with Dual Home at 8 sites and Dual Port at 6 sites, the Resilient service level on MetroNET, 2 new fiber builds, Anti-DDoS Service at 20 sites, HGC SDWAN for 20 sites with 20 licenses and UTM at 20 sites, 2 HGC AWS Direct Connect connections, 2 HGC Azure ExpressRoute connections and 1 HGC Multi-Cloud Connect connection, cloud connections at 1 Gbps on 10 Gigabit Ethernet hand-off ports, 5 handed off in colocation, GC Telehousing colocation at Chai Wan with 7 racks at 10 kW, high-density cooling on 3 racks and 5 cross-connects, SIP Trunk with 480 channels on 1 interface, and a 5 percent discount on the monthly charges. The quote states HK$28,347,960 over the contract. It is ready to send.

Verdict: Allowed.

  • Quote summary. One-time install charges of HK$345,000, a monthly charge of HK$777,860 and a contract total of HK$28,347,960.

4. Payments company, 6 sites: A quote for a payments company with cloud connections and colocation at Quarry Bay

The agent's request. Please quote HGC service for 6 sites on a 24 month term: Dedicated Internet Access at 1 Gbps for 2 sites, MetroNET at 1 Gbps on Gigabit Ethernet ports for 4 sites, with Dual Home at 2 sites, Anti-DDoS Service at 2 sites, 3 HGC AWS Direct Connect connections and 1 HGC Azure ExpressRoute connection, cloud connections at 5 Gbps on Gigabit Ethernet hand-off ports, 4 handed off in colocation, and GC Telehousing colocation at Quarry Bay with 4 racks at 3 kW and 1 cross-connect. The quote states HK$7,488,000 over the contract. It is ready to send.

Verdict: Blocked.

  • Not enough buildings on the HGC fiber network. The quote puts 6 sites on HGC access, but only 5 are in buildings on the HGC fiber network and 0 are quoted as new builds.
  • Cloud-connect bandwidth is more than the port can carry. The 4 cloud connections are quoted above 1 Gbps on a Gigabit Ethernet hand-off port; speeds above 1 Gbps need a 10 Gigabit Ethernet port.
  • Equipment draws more power than the racks supply. The equipment draws 22 kW and the 4 racks supply 12 kW.
  • Too few cross-connects for the cloud hand-offs. The quote has 1 cross-connects and 4 cloud connections handed off in colocation; each hand-off needs a cross-connect.
  • Stated total does not match. The quote states a contract total of HK$7,488,000; the prices give HK$7,572,000.

5. Payments company, 6 sites: The agent resubmits after fixing the errors

The agent's request. Please quote HGC service for 6 sites on a 36 month term: Dedicated Internet Access at 1 Gbps for 2 sites, MetroNET at 1 Gbps on Gigabit Ethernet ports for 4 sites, with Dual Home at 2 sites, 1 new fiber build, Anti-DDoS Service at 2 sites, 3 HGC AWS Direct Connect connections and 1 HGC Azure ExpressRoute connection, cloud connections at 5 Gbps on 10 Gigabit Ethernet hand-off ports, 4 handed off in colocation, and GC Telehousing colocation at Quarry Bay with 5 racks at 6 kW and 4 cross-connects. The quote states HK$12,998,400 over the contract. It is ready to send.

Verdict: Allowed.

  • Quote summary. One-time install charges of HK$150,000, a monthly charge of HK$356,900 and a contract total of HK$12,998,400.

6. Healthcare network, 26 sites: A quote for a healthcare network with broadband, SD-WAN and SIP voice across 26 clinics and hospitals

The agent's request. Please quote HGC service for 26 sites on a 60 month term: Dedicated Internet Access at 1 Gbps for 2 sites, Business Broadband at 10 Gbps with multiple fixed IP for 18 sites, MetroNET at 500 Mbps on Fast Ethernet ports for 6 sites, Anti-DDoS Service at 20 sites, HGC SDWAN for 24 sites with 24 licenses and UTM at 24 sites, SIP Trunk with 1,200 channels on 1 interface, and a 30 percent discount on the monthly charges. The quote states HK$21,806,400 over the contract. It is ready to send.

Verdict: Blocked.

  • Business Broadband is above its maximum speed. 18 Business Broadband sites are quoted at 10 Gbps; the service is published at up to 2,500 Mbps.
  • MetroNET bandwidth is more than the port can carry. 6 MetroNET sites are quoted at a bandwidth that the port cannot carry; a Fast Ethernet port carries 100 Mbps and a Gigabit Ethernet port carries 1 Gbps.
  • SD-WAN sites without a second path. The quote puts HGC SDWAN on 24 sites and only 20 have a second path (MPLS, Internet, 4G or 5G) for multi-path routing.
  • SIP Trunk channels exceed the interfaces. The quote has 1,200 SIP Trunk channels on 1 interfaces, which carry up to 850 channels at 850 per interface.
  • Discount is above the limit. The quote gives a discount of 30 percent; discounts above 25 percent are not allowed.
  • Stated total does not match. The quote states a contract total of HK$21,806,400; the prices give HK$21,878,400.
  • 60 month term. The quote has a 60 month term, a long price commitment, so a person should confirm.

7. Healthcare network, 26 sites: The agent resubmits after fixing the errors

The agent's request. Please quote HGC service for 26 sites on a 60 month term: Dedicated Internet Access at 1 Gbps for 2 sites, Business Broadband at 2.5 Gbps with multiple fixed IP for 18 sites, MetroNET at 500 Mbps on Gigabit Ethernet ports for 6 sites, Anti-DDoS Service at 20 sites, HGC SDWAN for 20 sites with 20 licenses and UTM at 20 sites, SIP Trunk with 1,200 channels on 2 interfaces, and a 15 percent discount on the monthly charges. The quote states HK$19,564,200 over the contract. It is ready to send.

Verdict: Needs approval.

  • 60 month term. The quote has a 60 month term, a long price commitment, so a person should confirm.
  • Discount above 10 percent. The quote gives a discount of 15 percent, above 10 percent, so a person should confirm.
  • Quote summary. One-time install charges of HK$72,000, a monthly charge of HK$324,870 and a contract total of HK$19,564,200.

Narration transcript

Click to expand

The text of the narrated walkthrough, step by step.

  1. Welcome to a demo of Predictika's Validator. An AI sales agent prepares a quote for a business customer of HGC Global Communications, the Hong Kong enterprise ICT and telecom operator: Dedicated Internet Access, Business Broadband or MetroNET at every site. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of how those services fit together and returns a verdict, every reason, a line-item quote and the figures it computed.
  2. I will start with the first request by the agent.
  3. The agent says. Please quote HGC service for 34 sites on a 36 month term: Dedicated Internet Access at 10 Gbps for 6 sites. The quote states HK$65,185,200 over the contract. The rest of the request is on screen.
  4. Before it goes out, the agent calls the validator.
  5. Blocked, with thirteen findings and one approval, all in one answer. The quote puts 34 sites on HGC access, but only 32 are in buildings on the HGC fiber network and 0 are quoted as new builds. 6 Dedicated Internet Access sites are quoted at 10 Gbps; the service is published at a maximum of 1,000 Mbps. 14 MetroNET sites are quoted at a bandwidth that the port cannot carry; a Fast Ethernet port carries 100 Mbps and a Gigabit Ethernet port carries 1 Gbps. The other ten are on screen.
  6. The validator returned 13 blocking findings and one approval in one answer. A check that reads one field at a time would pass most of this; it shows only when the choices in the quote are checked against each other and against the stated total.
  7. What this shows: for bandwidth against the port, and cloud-connect speed limits, a rules-based CPQ is error-prone for this.
  8. Now the agent resubmits.
  9. The corrected request. It changes the Dedicated Internet Access speed to 1 Gbps, the MetroNET bandwidth to 1 Gbps, the MetroNET sites on Dual Port to 6 and the stated contract total to HK$32,920,920. It sets the new fiber builds to 2. Six more changes are on screen.
  10. It calls the validator again.
  11. Still blocked, with five findings and one approval, all in one answer. The quote puts HGC SDWAN on 20 sites with 16 licenses; every SD-WAN site needs a license. The quote has 1 HGC Multi-Cloud Connect connections above 1 Gbps; this validator limits them to 1 Gbps. The equipment draws 58 kW and the cooling for 7 racks, 1 of them high-density, covers 48 kW. The other two are on screen.
  12. Eight findings cleared. Still blocking: SD-WAN sites without a license, multi-Cloud Connect above its speed limit, equipment needs more cooling than the racks provide, too few cross-connects for the cloud hand-offs and stated total does not match. One approval also remains for a person: contract total over HKD 30 million.
  13. The agent resubmits once more.
  14. The revised request. It changes the HGC SDWAN licenses to 20, the cloud connection bandwidth to 1 Gbps, the racks with high-density cooling to 3, the cross-connects to 5 and the stated contract total to HK$28,347,960.
  15. It calls the validator once more.
  16. This time the validator clears it.
  17. The validator also returns the line-item quote. It starts with Dedicated Internet Access and Business Broadband; the other 21 lines are on screen.
  18. All six earlier findings are cleared, and the validator's total, HK$28,347,960, matches the quote.
  19. Fourteen problems caught in one call, fixed in two passes, and a clean HK$28,347,960 quote. That is the value of Predictika's validator: catching mistakes before they reach the customer. Now you can try the other scenarios yourself.