Predictika · HPE Juniper QFX switch orders
An SE, a partner, an order desk or an AI agent proposes an order line for Juniper QFX5240 or QFX5241 800GbE data center switches sold through HPE: the switch family, OSFP or QSFP-DD ports, AC or DC power, airflow, a full unit or a spare chassis, the optics, the PSUs and fans, the site supply voltage, the quantity and the delivery week asked for. Before the order is booked, or a substitution is accepted, the proposal goes to the Predictika validator. It checks the configuration against Juniper's public hardware documentation, computes how many units ship against the allocation the customer has, compares the shipments the proposal states with that figure, and returns every reason in one answer. Hard rules block; a partial shipment, a later ship week or a reduced power supply output routes to a person. Nothing is priced. The allocation, the estimated ship week and the delivery week asked for are supplied by the customer's own order and supply systems; the customers on this page are fictional. This is an illustrative model. HPE and Juniper Networks are not involved with it and have not endorsed it.
This validator checks one kind of request: an order line for a QFX5240 or QFX5241 switch, with its optics, power supplies and fans, and its delivery against an allocation. It handles any order line built from these options, not only the scenarios on this page. It checks whether the order is valid and can ship before it is booked or a substitution is accepted. It does not size a network or price anything.
8 scenarios in 5 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI design agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Options that are valid for one switch and not another | Only with workarounds DC power is a QFX5241 option and not a QFX5240 one, and the same ordering form offers both. A rules table per model has to be kept in step as models are added, and a DC order for the wrong model passes until someone notices. | Each option is checked against the family on every call, so a DC QFX5240 is caught without a rule for that pair. |
| Optics that must match the port type, including after a substitution | Only with care When the ordered switch is substituted because of allocation, the optics already on the order stay as they were. A configurator checks the switch or the optic, rarely the pair after the swap. | The port type and the optic are compared on every call, so an OSFP optic kept on a QSFP-DD switch is caught the moment the substitution is proposed. |
| Shipments that depend on an allocation held in another system | Only with workarounds An order tool books the quantity ordered. Whether all of it can ship depends on an allocation in a supply system, and a stated shipment that ignores it passes. | The units that ship are computed from the quantity and the allocation and compared with the shipments the proposal states; a partial shipment goes to a person. |
| Hard rules versus supply questions a person must accept | Only with care Approval chains handle one threshold well, but here some findings block (a wrong option), and others (a partial shipment, a later ship week, a reduced PSU output) only need a person. | Each finding is labeled block or approval, so a person is asked only about the things only a person can accept. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the design; approval findings need a person to sign off; everything else is computed. The wording shown is an example from the test runs; the numbers change with the proposal.
| 1 | Airflow-in is not offered (blocks): Only airflow-out (AFO, front-to-back) is offered for the QFX5240; airflow-in is not available. |
| 2 | Optic does not match the port type (blocks): The QD port type needs QSFP-DD optics, but the order has OSFP optics; the optic must match the port type. |
| 3 | QFX5240 is offered with AC power only (blocks): The QFX5240 is offered with AC power supplies only; DC power is a QFX5241 option. |
| 4 | Site supply outside 200 to 240 VAC (blocks): The AC power supplies take 200 to 240 VAC; the site supply is 190 VAC. |
| 5 | Spare chassis ordered without PSUs and fans (blocks): A spare chassis (CHAS) ships without PSUs or fans; the order has 1 PSUs and 0 fans, and the switch needs 2 PSUs and 4 fan modules. |
| 6 | Stated shipments do not match the allocation (blocks): Stated shipments do not match the allocation: the agent stated 24 units shipping; with 24 ordered and 16 allocated the validator computes 16. |
| 7 | More ordered than allocated (needs approval): 24 units are ordered but 16 are allocated; the rest cannot ship on this allocation, so a person must approve a partial shipment or a later one. |
| 8 | Ship week later than asked (needs approval): The estimated ship is week 14 but the customer asked for week 12; a person must approve the later delivery. |
| 9 | Supply voltage reduces PSU output (needs approval): At 208 VAC the AC power supplies are limited to 2,800 W output (3,000 W at 215 to 240 VAC); confirm the load with the customer. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please book this order for Cobalt Cloud: 24 QFX5240 64QD switches (full units), DC power, 800G OSFP optics, 2 PSUs and 4 fan modules. The units allocated to the customer are 16, the delivery asked for is week 12, the estimated ship is week 10, and 24 units ship. It is ready to book.
Verdict: Blocked.
The agent's request. Please book this order for Cobalt Cloud: 24 QFX5241 64QD switches (full units), DC power, 800G OSFP optics, 2 PSUs and 4 fan modules. The units allocated to the customer are 16, the delivery asked for is week 12, the estimated ship is week 10, and 16 units ship. It is ready to book.
Verdict: Blocked.
The agent's request. Please book this order for Cobalt Cloud: 24 QFX5241 64QD switches (full units), DC power, 800G QSFP-DD optics, 2 PSUs and 4 fan modules. The units allocated to the customer are 24, the delivery asked for is week 12, the estimated ship is week 10, and 24 units ship. It is ready to book.
Verdict: Allowed.
The agent's request. Please book this order for Altair Networks: 16 QFX5240 64QD switches (full units), AC power, 800G OSFP optics, 2 PSUs and 4 fan modules. The units allocated to the customer are 16, the delivery asked for is week 12, the estimated ship is week 10, and 16 units ship. It is ready to book.
Verdict: Blocked.
The agent's request. Please book this order for Altair Networks: 16 QFX5240 64QD switches (full units), AC power, 800G QSFP-DD optics, 2 PSUs and 4 fan modules. The units allocated to the customer are 16, the delivery asked for is week 12, the estimated ship is week 10, and 16 units ship. It is ready to book.
Verdict: Allowed.
The agent's request. Please book this order for Orchid Telecom: 8 QFX5240 64OD switches (full units), AC power, 800G OSFP optics, 2 PSUs and 4 fan modules. The units allocated to the customer are 8, the delivery asked for is week 12, the estimated ship is week 14, and 8 units ship. It is ready to book.
Verdict: Needs approval.
The agent's request. Please book this order for Skerry Hosting: 2 QFX5241 64QD switches (spare chassis), DC power, 800G QSFP-DD optics, 1 PSUs and 0 fan modules. The units allocated to the customer are 2, the delivery asked for is week 12, the estimated ship is week 10, and 2 units ship. It is ready to book.
Verdict: Blocked.
The agent's request. Please book this order for Skerry Hosting: 2 QFX5241 64QD switches (spare chassis), DC power, 800G QSFP-DD optics, 2 PSUs and 4 fan modules. The units allocated to the customer are 2, the delivery asked for is week 12, the estimated ship is week 10, and 2 units ship. It is ready to book.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.