Predictika · Smart electricity meter orders
An AI sales agent prepares an order for Itron OpenWay Riva CENTRON smart electricity meters with a form, a voltage, a meter class, options, a quantity and a discount. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the meter forms and returns a verdict, every reason and the order total it computed.
This validator models Itron OpenWay Riva CENTRON meter orders, not just the scenarios shown below.
Any Itron OpenWay Riva CENTRON meter order that touches these rules is in scope — not only the scenarios pictured here. Not covered: gas and water meters and head-end software. The form, voltage, class and disconnect combinations for forms 1S, 2S, 12S and 25S come from Itron's public datasheet; the polyphase forms, all other rules and all prices are modeled, not published by Itron.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| A voltage fixed by the form | Only with care Each form is built for its own voltage, and the polyphase forms for a short list of voltages, so each form needs its own rule. | The form and the voltage are fields of one request and compared on every call. |
| A meter class that depends on the form | Only with care Class 20 belongs to the polyphase forms, Class 200 to the single-phase forms and Class 320 to form 2S only, so the class and the form need a joint rule. | Form and class are fields of the request and checked together. |
| Options that only some forms offer | Only with care The remote disconnect switch and power line carrier are missing on some forms and classes, so each option needs rules per form. | The form, class and options are fields of one request and checked together on every call. |
| Approval steps for discounts and very large orders | Only with workarounds Discount bands and a volume threshold each need an approval rule, and the discount ceiling a blocking rule, evaluated together with the rest. | The discount and the quantity are fields of the request and every threshold is evaluated on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as a quote is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | Forms 1S, 12S and 25S are 120 V meters; the order has 240 V. |
| 2 | Form 2S is a 240 V meter; the order has 120 V. |
| 3 | The Class 320 form 2S is offered without the remote disconnect switch. |
| 4 | Class 320 (50 A test amps) is offered only on form 2S. |
| 5 | Meter class 100 is not offered; the classes are 20, 200 and 320. |
| 6 | Single-phase forms are Class 200 (or Class 320 on form 2S), not Class 20. |
| 7 | Polyphase forms are offered in Class 20 only. |
| 8 | Polyphase forms are offered at 120, 240, 277 or 480 V; the order has 600 V. |
| 9 | Form 35S is not offered at 240 V. |
| 10 | Power line carrier is not offered on form 35S; use RF only. |
| 11 | The remote disconnect switch is not offered on polyphase forms. |
| 12 | An order needs at least 1 carton of 10 meters; the order has 0 cartons. |
| 13 | An order of 100,000 meters needs a delivery schedule and capacity review. |
| 14 | A discount of 13 percent is above 12 percent and needs sales management approval. |
| 15 | A discount of 25 percent is above 12 percent and needs sales management approval. |
| 16 | A discount of 26 percent is above the 25 percent maximum. |
| 17 | A discount of 15 percent is above 12 percent and needs sales management approval. |
| 18 | An order of 120,000 meters needs a delivery schedule and capacity review. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote 500 meters of form 35S at 240 V, Class 200, with RF and power line carrier communications, the remote disconnect switch. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 500 meters of form 35S at 480 V, Class 20, with RF communications. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 2,000 meters of form 2S at 120 V, Class 320, with RF communications, the remote disconnect switch and a 26 percent discount. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 2,000 meters of form 2S at 240 V, Class 320, with RF communications and a 10 percent discount. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 120,000 meters of form 2S at 240 V, Class 320, with RF communications and a 15 percent discount. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote 90,000 meters of form 2S at 240 V, Class 320, with RF communications and a 10 percent discount. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.