Predictika · Conveyor module, rack and support structure, programs, design throughput in cartons per hour, options and support years
An AI sales agent prepares a conveyor system quote: conveyor module, rack and support structure, programs, design throughput in cartons per hour, options and support years. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the product catalog and returns a verdict, every reason and the price it computed.
This validator models conveyor system quotes for a product line of this style: four conveyor module types, three rack and support structures and three project programs, not just the scenarios shown below.
Any quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: other KION or Dematic products such as automated storage and retrieval systems, shuttles or robotics, real list prices, layout and flow simulation, regional building and safety codes, or tax and multi-currency quoting.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| A compatibility between two catalogs | Only with workarounds A pairwise compatibility between two catalogs usually becomes one rule per combination, kept in step by hand. | Compatibility is a property of the two products, checked on every call. |
| A figure that must fit two limits | Only with care A number that must fit both a product range and a limit of another product spans several validation rules. | Both limits and the review band are evaluated together. |
| Options that only some products offer | Only with care Option rules per product, extended for every new product or option. | The product lists which options it offers; the check follows from the choices. |
| Discount stacking and approval bands | Only with workarounds Program, volume and extra discounts add up across rules and approval levels, and the total is rarely checked in one place. | The discounts are added once and compared with both the rep authority and the limit. |
| The total the agent states | Only with workarounds Comparing a stated total with a computed one needs a separate rule per quote layout, and price rules rarely run on stated figures. | The stated net total is a field in the request and is checked against the computed total. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | A contract of 4 years is longer than 3 years; finance must approve the price lock. |
| 2 | A design throughput of 11,000 is above 10,000; a controls and throughput engineering review is required. |
| 3 | 65 modules are above 60; a project schedule review is required. |
| 4 | Total discount of 13 percent is above the 10 percent a rep can give; sales director must approve. |
| 5 | 62 modules are above 60; a project schedule review is required. |
| 6 | Order value of USD 5,505,228 is above USD 5,000,000 and needs a deal desk review. |
| 7 | 250 modules are outside the 1 to 200 allowed. |
| 8 | Order value of USD 7,733,000 is above USD 5,000,000 and needs a deal desk review. |
| 9 | The accumulation control package is not available on the Gravity roller transfer module. |
| 10 | The predictive maintenance service is not available on the Gravity roller transfer module. |
| 11 | The Floor supported frame cannot carry the sorter loading. |
| 12 | A design throughput of 3,500 is outside the 500 to 3,000 range of the Roller conveyor module. |
| 13 | A design throughput of 9,500 is above the 9,000 limit of the Mezzanine supported frame. |
| 14 | 6 modules are below the 10 modules minimum of the Multi-site program. |
| 15 | A contract of 6 years is outside the 1 to 5 years allowed. |
| 16 | Total discount of 16 percent is above the 10 percent a rep can give; sales director must approve. |
| 17 | The quoted net total of USD 234,432 does not match the USD 260,480 the validator computed. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote the tilt-tray sorter module on the floor supported frame for 56 modules under the multi-site program, with a design throughput of 11,000 cartons per hour and a 6 year support term, with an extra 10 percent discount. The net total is USD 3,564,288. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote the tilt-tray sorter module on the heavy duty seismic mezzanine frame for 56 modules under the multi-site program, with a design throughput of 11,000 cartons per hour and a 3 year support term, with an extra 3 percent discount. The net total is USD 4,460,803.20. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote the tilt-tray sorter module on the heavy duty seismic mezzanine frame for 56 modules under the multi-site program, with a design throughput of 9,500 cartons per hour and a 3 year support term. The net total is USD 4,614,624. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote the gravity roller transfer module on the floor supported frame for 8 modules under the equipment purchase, with a design throughput of 1,000 cartons per hour and a 2 year support term, with the accumulation control package. The net total is USD 113,920. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote the roller conveyor module on the floor supported frame for 8 modules under the equipment purchase, with a design throughput of 1,000 cartons per hour and a 2 year support term, with the accumulation control package. The net total is USD 189,920. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote the roller conveyor module on the floor supported frame for 12 modules under the multi-site program, with a design throughput of 2,500 cartons per hour and a 2 year support term, with an extra 6 percent discount. The net total is USD 211,305.60. It is ready to send.
Verdict: Needs approval.
The text of the narrated walkthrough, step by step.