An AI sales agent prepares a configuration for a DC fast-charging site: a power unit of 50 kW power modules, the charging satellites hanging off it, the cable length, the connectors and the power the site needs at peak. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the published data sheet limits and returns a verdict, every reason and the figures it computed.

Scope: Power Unit C501, C502 and C503 with Satellite V2 charging outputs: power modules, number of outputs, site demand, cable length, CHAdeMO and CCS2 current. See everything this validator covers

This validator models site configurations built from one product line, the Kempower Power Unit (C501, C502, C503) with Satellite V2 charging outputs, not just the scenarios shown below.

  • Power modules — each module is 50 kW; a single-cabinet C501 takes up to 4 modules (200 kW), a double-cabinet C502 up to 8 (400 kW) and a triple-cabinet C503 up to 12 (600 kW). The power stated on the quote is compared with the installed power, and the site demand at peak must fit within it.
  • Charging outputs — one power unit supports up to 8 charging outputs (a single satellite has one, a dual satellite two), or 6 with adaptive voltage systems.
  • Cables and connectors — satellite cables of 5 m or 7 m; CHAdeMO outputs limited to 125 A and available only on a dual satellite with CCS2 and CHAdeMO; CCS2 above 300 A goes to a person to confirm the cable and terminals.

Any configuration of these power units with Satellite V2 outputs is in scope — not only the scenarios pictured here. Not covered: prices (no public price list was found, so this validator produces no price build-up or line-item quote), grid connection and fuse sizing, output voltage and power sharing between outputs, the C800 power unit and other satellite versions, liquid-cooled cables, software tiers, installation and service terms.

The AI sales agentBuilds the charging site configuration from the conversation and says it is ready.
Predictika validatorChecks every rule at once and returns the verdict, each finding, and the computed figures.

7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch

What the agent proposes

The AI sales agent says

Illustrative agent statement. The validator receives the structured request below.

Proposing agent: AI sales agent (scripted)

Before sending, the agent must call Recorded run

Predictika validator


      
Waiting for the call.

Where rules-based CPQ gets it wrong

Click to expand

Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.

What the validator caughtTypical rules-based CPQPredictika
Module count that depends on the cabinetOnly with care
Each power unit holds a different number of 50 kW modules, so the limit depends on the cabinet chosen and needs a rule per cabinet.
The cabinet and the module count arrive together and are checked on every call.
Output count that depends on the voltage systemOnly with workarounds
A dual satellite counts as two outputs and the limit is 8 or 6 depending on the voltage system, so the count and the limit depend on several choices at once.
Satellites and voltage system are in one request; outputs are counted and compared with the limit on every call.
Connector limits across linesOnly with care
CHAdeMO current and CHAdeMO availability on dual satellites relate separate lines of the quote, which needs cross-line rules.
Connector, current and satellite type are checked together on every call.
Stated power that must match the modulesOnly with care
A stated figure is a free-entry field; a rule can compare it with the installed power, but someone has to write and maintain that comparison.
The stated power travels with the configuration and is compared with the computed power on every call.
Every problem returned in one answerOnly with workarounds
Rules tend to fire as the order is saved or a step is completed, so a rep often fixes one error and meets the next.
All findings come back together, whatever order the choices arrived in.

What this validator catches: findings from its test cases

Click to expand

Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.

1The quote has 5 power modules of 50 kW; the selected power unit takes between 1 and 4.
2The quote has 9 power modules of 50 kW; the selected power unit takes between 1 and 8.
3The quote has 13 power modules of 50 kW; the selected power unit takes between 1 and 12.
4The quote has 0 power modules of 50 kW; the selected power unit takes between 1 and 8.
5The quote has 9 charging outputs (a dual satellite has two); one power unit supports at most 8 (8, or 6 with adaptive voltage).
6The quote has 7 charging outputs (a dual satellite has two); one power unit supports at most 6 (8, or 6 with adaptive voltage).
7The quote has 8 charging outputs (a dual satellite has two); one power unit supports at most 6 (8, or 6 with adaptive voltage).
8The site needs 401 kW of charging power at peak; the installed power modules give 400 kW.
9The site needs 350 kW of charging power at peak; the installed power modules give 300 kW.
10The quote asks for a 6 m charging cable; satellites come with 5 m or 7 m cables.
11The quote asks for a 10 m charging cable; satellites come with 5 m or 7 m cables.
12A CHAdeMO output is quoted at 126 A; CHAdeMO outputs are limited to 125 A.
13The quote has 3 CHAdeMO outputs; a CHAdeMO output comes on a dual satellite with CCS2 and CHAdeMO, and the quote has 2 dual satellites.
14The quote has 1 CHAdeMO outputs; a CHAdeMO output comes on a dual satellite with CCS2 and CHAdeMO, and the quote has 0 dual satellites.
15The quote states 600 kW of installed power; the power modules give 400 kW.
16The quote states 350 kW of installed power; the power modules give 400 kW.
17A CCS2 output is quoted at 301 A, above the 300 A continuous rating the data sheets agree on; the higher-current options need a person to confirm the cable and terminals.
18A CCS2 output is quoted at 500 A, above the 300 A continuous rating the data sheets agree on; the higher-current options need a person to confirm the cable and terminals.
19The site needs 450 kW of charging power at peak; the installed power modules give 400 kW.
20A CCS2 output is quoted at 375 A, above the 300 A continuous rating the data sheets agree on; the higher-current options need a person to confirm the cable and terminals.
21The quote has 6 power modules of 50 kW; the selected power unit takes between 1 and 4.
22The quote has 10 charging outputs (a dual satellite has two); one power unit supports at most 6 (8, or 6 with adaptive voltage).
23The site needs 500 kW of charging power at peak; the installed power modules give 300 kW.
24A CHAdeMO output is quoted at 200 A; CHAdeMO outputs are limited to 125 A.
25The quote has 4 CHAdeMO outputs; a CHAdeMO output comes on a dual satellite with CCS2 and CHAdeMO, and the quote has 3 dual satellites.
26The quote states 200 kW of installed power; the power modules give 300 kW.

Scenarios and results

Click to expand

The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.

1. Cabinet, modules and outputs: A single-cabinet power unit with six modules, ten outputs and a quoted power that does not match

The agent's request. Please quote a Kempower power unit: a single-cabinet C501 with 6 power modules, 4 single and 3 dual charging satellites with 6 m cables, CCS2 outputs at 250 A and 350 kW needed at peak. The quote states 400 kW of installed power. It is ready to send.

Verdict: Blocked.

  • Power modules outside the power unit range. The quote has 6 power modules of 50 kW; the selected power unit takes between 1 and 4.
  • Too many charging outputs. The quote has 10 charging outputs (a dual satellite has two); one power unit supports at most 8 (8, or 6 with adaptive voltage).
  • Site demand above installed power. The site needs 350 kW of charging power at peak; the installed power modules give 300 kW.
  • Cable length not offered. The quote asks for a 6 m charging cable; satellites come with 5 m or 7 m cables.
  • Stated installed power does not match. The quote states 400 kW of installed power; the power modules give 300 kW.

2. Cabinet, modules and outputs: The agent resubmits after fixing the errors

The agent's request. Please quote a Kempower power unit: a double-cabinet C502 with 8 power modules, 4 single and 2 dual charging satellites with 7 m cables, CCS2 outputs at 250 A and 380 kW needed at peak. The quote states 400 kW of installed power. It is ready to send.

Verdict: Allowed.

  • Configuration summary. Installed power 400 kW; 8 charging outputs; at most 8 outputs for this voltage system.

3. Adaptive voltage and CHAdeMO: A triple cabinet with adaptive voltage, eight outputs and four CHAdeMO outputs at 200 A

The agent's request. Please quote a Kempower power unit: a triple-cabinet C503 with 12 power modules on an adaptive voltage system, 2 single and 3 dual charging satellites with 7 m cables, 4 CHAdeMO outputs at 200 A, CCS2 outputs at 250 A and 500 kW needed at peak. The quote states 600 kW of installed power. It is ready to send.

Verdict: Blocked.

  • Too many charging outputs. The quote has 8 charging outputs (a dual satellite has two); one power unit supports at most 6 (8, or 6 with adaptive voltage).
  • CHAdeMO current too high. A CHAdeMO output is quoted at 200 A; CHAdeMO outputs are limited to 125 A.
  • More CHAdeMO outputs than dual satellites. The quote has 4 CHAdeMO outputs; a CHAdeMO output comes on a dual satellite with CCS2 and CHAdeMO, and the quote has 3 dual satellites.

4. Adaptive voltage and CHAdeMO: The agent resubmits after fixing the errors

The agent's request. Please quote a Kempower power unit: a triple-cabinet C503 with 12 power modules on an adaptive voltage system, 2 single and 2 dual charging satellites with 7 m cables, 2 CHAdeMO outputs at 125 A, CCS2 outputs at 250 A and 500 kW needed at peak. The quote states 600 kW of installed power. It is ready to send.

Verdict: Allowed.

  • Configuration summary. Installed power 600 kW; 6 charging outputs; at most 6 outputs for this voltage system.

5. Site demand and cable current: A double cabinet asked to deliver 450 kW with 400 A CCS2 cables

The agent's request. Please quote a Kempower power unit: a double-cabinet C502 with 8 power modules, 1 single and 3 dual charging satellites with 5 m cables, CCS2 outputs at 400 A and 450 kW needed at peak. The quote states 400 kW of installed power. It is ready to send.

Verdict: Blocked.

  • Site demand above installed power. The site needs 450 kW of charging power at peak; the installed power modules give 400 kW.
  • Higher-current CCS2 cable to confirm. A CCS2 output is quoted at 400 A, above the 300 A continuous rating the data sheets agree on; the higher-current options need a person to confirm the cable and terminals.

6. Site demand and cable current: The agent resubmits after fixing the errors

The agent's request. Please quote a Kempower power unit: a double-cabinet C502 with 8 power modules, 1 single and 3 dual charging satellites with 5 m cables, CCS2 outputs at 400 A and 400 kW needed at peak. The quote states 400 kW of installed power. It is ready to send.

Verdict: Needs approval.

  • Higher-current CCS2 cable to confirm. A CCS2 output is quoted at 400 A, above the 300 A continuous rating the data sheets agree on; the higher-current options need a person to confirm the cable and terminals.
  • Configuration summary. Installed power 400 kW; 7 charging outputs; at most 8 outputs for this voltage system.

7. Site demand and cable current: The agent resubmits after fixing the errors

The agent's request. Please quote a Kempower power unit: a double-cabinet C502 with 8 power modules, 1 single and 3 dual charging satellites with 5 m cables, CCS2 outputs at 300 A and 400 kW needed at peak. The quote states 400 kW of installed power. It is ready to send.

Verdict: Allowed.

  • Configuration summary. Installed power 400 kW; 7 charging outputs; at most 8 outputs for this voltage system.

Narration transcript

Click to expand

The text of the narrated walkthrough, step by step.

  1. Welcome to a demo of Predictika's Validator. An AI sales agent prepares a configuration for a DC fast-charging site: a power unit of 50 kW power modules, the charging satellites hanging off it, the cable length, and more. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the published data sheet limits and returns a verdict, every reason and the figures it computed.
  2. I will start with the first request by the agent.
  3. The agent says. Please quote a Kempower power unit: a single-cabinet C501 with 6 power modules, 4 single and 3 dual charging satellites with 6 m cables. The quote states 400 kW of installed power. The rest of the request is on screen.
  4. Before it goes out, the agent calls the validator.
  5. Blocked, with five findings, all in one answer. The quote has 6 power modules of 50 kW; the selected power unit takes between 1 and 4. The quote has 10 charging outputs (a dual satellite has two); one power unit supports at most 8 (8, or 6 with adaptive voltage). The site needs 350 kW of charging power at peak; the installed power modules give 300 kW. The other two are on screen.
  6. The validator returned five blocking findings in one answer. A check that reads one field at a time would pass most of this; it shows only when the choices in the quote are checked against each other.
  7. What this shows: for stated power that must match the modules, a rules-based CPQ is error-prone for this.
  8. Now the agent resubmits.
  9. The corrected request. It changes the power unit to C502, the power modules to 8, the dual satellites to 2, the cable length to 7 m and the site demand at peak to 380 kW.
  10. It calls the validator again.
  11. This time the validator clears it.
  12. All five earlier findings are cleared, and the validator's figure matches the quote.