Predictika · Drywall partition system quotes in euros
A sales agent prepares a quote for a drywall partition wall and says it is ready to send. Before it goes out, the agent sends it to Predictika's validator, which checks the board, the studs, the layers, the fire and sound requirements, the height, the destination, the delivery time and the discount together, prices the wall, compares the total the agent states with its own, and reports every problem it finds in one pass.
This validator checks any quote of this kind against the rules below, not just the scenarios shown.
Any partition quote that touches these rules is in scope, not only the scenarios pictured here. Not checked: other Knauf products and systems, real list prices and contracts, structural engineering or code approval, installation labor, and taxes.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, one rule per field) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | A rules-based CPQ | Predictika |
|---|---|---|
| A result built from several parts | Only with workarounds The fire resistance and sound reduction come from the board, the number of layers, the stud width and the insulation together, so each combination needs its own rule or a lookup table that someone has to keep. | The performance of the whole build-up is computed from the request, and the finding states what it reaches against what is required. |
| Limits that depend on each other | Only with care The wall height a stud allows depends on the spacing and the number of layers, and the board length adds another limit, so the rule list multiplies. | Board, studs, layers, spacing, height and destination are fields of one request and are re-evaluated together on every call. |
| A total the agent states | Only with workarounds A form validator rarely sees the agent's own total, so an agent can state a number that differs from the price list and nothing notices. | The stated total travels in the request and is compared with the validator's own calculation. |
| A block that is also an approval | Only with care A wall taller than the board needs technical service while a wall taller than the stud allows is blocked, and a small order needs approval, so each limit needs guarded rules. | Blocks and approvals come back together, each with its reason, and the verdict follows from both. |
| Every problem returned in one answer | Only with workarounds Form checks usually stop at the first failing field, so the sales agent fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The build-up must reach the fire resistance and sound reduction the project requires; fire board, extra layers and insulation each add to the result. |
| 2 | A wet room needs a moisture resistant board, and high impact use needs a high density board. |
| 3 | The wall height may not exceed what the stud and layer count allow at the chosen spacing; a wall taller than the board length needs technical service to confirm the rating. |
| 4 | Stud spacing must be a system spacing of 300, 400 or 625 mm, and the insulation must fit the stud cavity. |
| 5 | A board or stud must be offered in the destination country, and a Q4 finish needs the full skim coat. |
| 6 | The expected delivery time must not exceed the days the customer needs. |
| 7 | A discount above 5 percent needs approval, and a discount above the limit for the order channel is blocked. |
| 8 | A wall under 15 square meters needs sales approval for a small order surcharge, and a net order value above EUR 40,000 needs a sales director review. |
| 9 | The net total the agent states must match the total the validator computes. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please check this quote for Haldane Interiors: a drywall partition wall in Germany, Standard board GKB 12.5 mm, two layers of board per side on CW 75 studs at 625 mm, 3000 mm high and 12 meters long, with 60 mm of insulation, Q2 finish, 60 minutes of fire resistance and 50 dB of sound reduction required, needed within 20 days, ordered through a contractor. Net total EUR 1,194.75. It is ready to send.
Verdict: Blocked.
The agent's request. Please check this quote for Haldane Interiors: a drywall partition wall in Germany, Fire board GKF 12.5 mm, two layers of board per side on CW 75 studs at 625 mm, 3000 mm high and 12 meters long, with 60 mm of insulation, Q2 finish, 60 minutes of fire resistance and 50 dB of sound reduction required, needed within 20 days, ordered through a contractor. Net total EUR 1,324.35. It is ready to send.
Verdict: Allowed.
The agent's request. Please check this quote for Brightwater Builders: a drywall partition wall in Germany, Fire board GKF 12.5 mm, two layers of board per side on CW 75 studs at 625 mm, 2600 mm high and 12 meters long, with 60 mm of insulation, Q2 finish, 60 minutes of fire resistance and 50 dB of sound reduction required, for a wet room, needed within 20 days, ordered through a contractor. Net total EUR 1,147.77. It is ready to send.
Verdict: Blocked.
The agent's request. Please check this quote for Brightwater Builders: a drywall partition wall in Germany, Fire and moisture board GKFI 12.5 mm, two layers of board per side on CW 75 studs at 625 mm, 2600 mm high and 12 meters long, with 60 mm of insulation, Q2 finish, 60 minutes of fire resistance and 50 dB of sound reduction required, for a wet room, needed within 20 days, ordered through a contractor. Net total EUR 1,359.93. It is ready to send.
Verdict: Allowed.
The agent's request. Please check this quote for Oakhurst Fit-out: a drywall partition wall in Germany, Fire board GKF 12.5 mm, two layers of board per side on CW 75 studs at 625 mm, 3000 mm high and 20 meters long, with 60 mm of insulation, Q2 finish, 60 minutes of fire resistance and 50 dB of sound reduction required, needed within 22 days, ordered through a contractor. Net total EUR 1,977.62. It is ready to send.
Verdict: Blocked.
The agent's request. Please check this quote for Oakhurst Fit-out: a drywall partition wall in Germany, Fire board GKF 12.5 mm, two layers of board per side on CW 75 studs at 625 mm, 3000 mm high and 20 meters long, with 60 mm of insulation, Q2 finish, 60 minutes of fire resistance and 50 dB of sound reduction required, needed within 22 days, ordered through a contractor. Net total EUR 2,197.35. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.