Predictika · Medium-voltage ring main units

An AI sales agent's ring main unit quote, checked before it goes out

An AI sales agent configures a Lucy Electric Aegis Plus ring main unit: the voltage and frequency, the switching functions in the tank, extensibility, indoor or outdoor installation, protection, motors and automation, and the overall dimensions it quotes. Before the quote goes out, the agent sends it to Predictika, which checks it against a declarative model of the public product catalogue and returns a verdict, every reason and the dimensions it computed.

Scope: Lucy Electric Aegis Plus (12, 17.5 and 24 kV) as described in its public catalogue: switching functions, extensibility, installation, protection, motors and automation, ratings and overall dimensions. No prices. See everything this validator covers

This validator models the Aegis Plus configuration rules of the public catalogue, not just the scenarios shown below.

  • Ratings and site — 12 and 24 kV at 50 Hz and 17.5 kV at 50 or 60 Hz; fault level up to 21 kA for 3 seconds (1 second at 17.5 kV 60 Hz); operating temperature -25 to +55 degrees C; altitude above 1,000 m goes to a person for approval.
  • Tank and extensibility — one to five switching functions in a tank (four if extensible); side, top or both-sides extension; outdoor IP54 only for non-extensible and top-extensible units; the fuse switch is not offered at 17.5 kV; busbar sectionalizers, earthing and the direct cable connection need an extensible unit.
  • Protection, motors and automation — time limit fuse up to 2,000 kVA, protection relays against the published feature matrix (thermal overload, remote tripping), protection CT ratios, shunt trip and undervoltage coils, earth fault indicators, motor counts, the automatic transfer scheme with its RTU, motors and voltage detection.
  • Dimensions — the overall width and height stated in the quote must equal the dimension table for the configuration.

Any Aegis Plus configuration that touches these rules is in scope — not only the scenarios pictured here. Not covered: prices, delivery, other Lucy Electric products, and every catalogue item not listed above. Where the catalogue is silent the validator sends the quote to a person rather than guessing.

The AI sales agentConfigures the ring main unit from the conversation and says the quote is ready.
Predictika validatorChecks every rule at once and returns the verdict, each finding, and the computed figures.

7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch

What the agent proposes

The AI sales agent says

Illustrative agent statement. The validator receives the structured request below.

Proposing agent: AI sales agent (scripted)

Before sending, the agent must call Recorded run

Predictika validator


      
Waiting for the call.

Where rules-based CPQ gets it wrong

Click to expand

Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.

What the validator caughtTypical rules-based CPQPredictika
Options that exclude each otherOnly with workarounds
Outdoor installation rules out side extension, and the fuse switch drops out at 17.5 kV; each is a rule across two separate choices that has to be written and kept in step.
All the choices arrive in one request and every exclusion is checked on every call.
Counts that limit other countsOnly with care
Motors, undervoltage coils and secondary injection are each capped by how many circuit breaker or motorizable functions the tank holds, so a count has to be compared with a count derived from others.
The counts travel with the request and every cap is computed from the functions in the tank.
A dimension that depends on several choicesOnly with care
Width follows the number of functions and height follows the termination height, RTU, extension and installation; a lookup table per combination works but is easy to get wrong.
Width and height are computed from the choices and compared with the figures the quote states.
A relay chosen against a feature matrixOnly with workarounds
Thermal overload and remote tripping are supported by some relays and not others, so a need on one line is satisfied or not by another line.
The need and the chosen relay travel together and the matrix is checked on every call.
A dependent set of automation partsOnly with workarounds
The automatic transfer scheme needs an RTU, two load break switches, motors and voltage detection; leaving one out is easy to miss until the order is reviewed.
Every missing part is reported together, whatever order the parts were added in.
Every problem returned in one answerOnly with workarounds
Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next.
All findings come back together, whatever order the choices were made in.

What this validator catches: findings from its test cases

Click to expand

Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.

1The 12 kV and 24 kV ratings are 50 Hz only; 60 Hz is offered at 17.5 kV.
2The unit has no switching functions; a tank needs at least 1.
3The quote has 6 switching functions; a single tank holds at most 5.
4The quote has 5 functions in an extensible unit; an extensible tank holds up to 4.
5The 200 A fuse switch (F function) is not available at 17.5 kV.
6Busbar sectionalizers and busbar earthing are not available in the 17.5 kV 60 Hz range.
7Busbar sectionalizers, busbar earthing and the direct cable connection have extensible busbar bushings and need an extensible unit; this unit is non-extensible.
8IP54 outdoor installation is available for non-extensible and top-extensible units only; side extensibility is IP41 indoor only.
9An extensible unit must be extensible on the left, the right or both sides; none was chosen.
10A non-extensible unit cannot take extension on any side.
11An internal-arc-rated cable compartment is not available with the 450 mm cable termination height.
12The metering unit does not match the switchgear: Mt is the non-extensible metering unit; M1, M2 and M3 are the extensible ones.
13IP54 outdoor installation is available only for the non-extensible (Mt) metering unit.
14A metering unit needs a current transformer ratio and a voltage transformer ratio; one is missing.
15A 22,000 V voltage transformer needs the 24 kV rating.
16A metering CT primary of 250 A is outside the standard range (50, 100, 200, 300 and 400 A); a wider range is available on request.
17The quote has 4 motors but only 3 functions can be motorized; the direct cable connection has no operating mechanism.
18The standard motors run on 24 V DC; other voltages are available on request, and a person should confirm the voltage with the manufacturer.
19The automatic transfer scheme needs the integrated Gemini 3 RTU, and the quote has none.
20The automatic transfer scheme operates the two incoming load break switches by motor; the quote has 0 motors.
21The automatic transfer scheme detects loss of voltage with a voltage detection system (VDS), and the quote has none.
22The automatic transfer scheme changes over between two load break switches; the quote has 1.
23A time limit fuse or protection relay protects a circuit breaker, and the quote has no circuit breaker function (V, T or C).
24The time limit fuse or relay needs a protection current transformer ratio, and none was chosen.
25A protection current transformer ratio was chosen but there is no time limit fuse or relay to use it.
26Time limit fuse protection covers transformers up to 2,000 kVA; the transformer is 2,500 kVA.
27The customer needs thermal overload protection and the chosen device does not provide it; a time limit fuse gives fault protection only, and the WIP1 and SIA-C relays do not list thermal overload.
28The customer needs remote tripping and the Fanox SIA-B relay does not list it.
29The chosen relay is not in the published relay feature matrix, so thermal overload or remote tripping support must be confirmed.
30A shunt trip coil trips a circuit breaker, and the quote has no circuit breaker function (V, T or C).
312 undervoltage release coils were quoted but there is only 1 circuit breaker function.
32Secondary injection was quoted on 2 functions but there is only 1 circuit breaker function.
33Earth fault indicators are fitted to load break switch (L) or direct cable connection (R) functions, and the quote has neither.
34Earth fault indicators are listed for the direct cable connection (R) in the product pages, but the order form offers them on load break switches only; a person should confirm.
354 earth and test facilities were quoted but only 3 functions can take one.
36A 400 square mm cable is larger than the cable compartment supports (300 square mm for single-core cables, 500 square mm for a three-core cable).
37Insulating bushing boots and heat-shrink boots are for up to 17.5 kV; at 24 kV a bolted separable connector is needed.
38A surge arrester on the direct cable connection (R) is available only with a single cable termination.
39The site temperature runs from -30 to 60 degrees C; the unit operates from -25 to +55 degrees C.
40The site is at 1,400 m; the ratings apply up to 1,000 m without derating, so the manufacturer should be consulted.
41The site fault level is 25 kA; the unit is rated for 21 kA.
42The fault duration of 4 seconds is above the rated short-circuit duration (3 seconds, or 1 second at 17.5 kV 60 Hz).
43The fault duration of 2 seconds is above the rated short-circuit duration (3 seconds, or 1 second at 17.5 kV 60 Hz).
44The quote states an overall height of 1,500 mm; the dimension table gives 1,430 mm for this configuration.
45The quote states an overall width of 1,000 mm; the dimension table gives 1,050 mm for this configuration.
46The technical data publishes no 17.5 kV rating for the auto-reclose circuit breaker (C) or the direct cable connection (R); a person should confirm availability with the manufacturer.

Scenarios and results

Click to expand

The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.

1. Outdoor 17.5 kV unit: An outdoor, side-extensible 17.5 kV unit with a fuse switch

The agent's request. Please quote an Aegis Plus ring main unit: 17.5 kV, 50 Hz, side-extensible on the right, installed outdoor, with 2 load break switches, 1 vacuum circuit breaker, 1 fuse switch. The quote states 1,395 mm wide and 1,540 mm high. It is ready to send.

Verdict: Blocked.

  • Fuse switch not available at 17.5 kV. The 200 A fuse switch (F function) is not available at 17.5 kV.
  • Outdoor unit cannot be side-extensible. IP54 outdoor installation is available for non-extensible and top-extensible units only; side extensibility is IP41 indoor only.

2. Outdoor 17.5 kV unit: The agent resubmits after fixing the errors

The agent's request. Please quote an Aegis Plus ring main unit: 12 kV, 50 Hz, side-extensible on the right, installed indoor, with 2 load break switches, 1 vacuum circuit breaker, 1 fuse switch. The quote states 1,395 mm wide and 1,530 mm high. It is ready to send.

Verdict: Allowed.

  • Configuration summary. 4 function(s) in the tank, 1,395 mm wide and 1,530 mm high, 0 motor(s).

3. Automatic transfer scheme: An automatic transfer scheme on a plain three-function unit

The agent's request. Please quote an Aegis Plus ring main unit: 12 kV, 50 Hz, non-extensible, installed indoor, with 2 load break switches, 1 vacuum circuit breaker; an automatic transfer scheme. The quote states 1,050 mm wide and 1,430 mm high. It is ready to send.

Verdict: Blocked.

  • Automatic transfer scheme needs the RTU. The automatic transfer scheme needs the integrated Gemini 3 RTU, and the quote has none.
  • Automatic transfer scheme needs motors. The automatic transfer scheme operates the two incoming load break switches by motor; the quote has 0 motors.
  • Automatic transfer scheme needs voltage detection. The automatic transfer scheme detects loss of voltage with a voltage detection system (VDS), and the quote has none.

4. Automatic transfer scheme: The agent resubmits after fixing the errors

The agent's request. Please quote an Aegis Plus ring main unit: 12 kV, 50 Hz, non-extensible, installed indoor, with 2 load break switches, 1 vacuum circuit breaker; the Gemini 3 RTU, an automatic transfer scheme, 2 motors on a supply other than 24 V DC, voltage detection (Wega22C). The quote states 1,050 mm wide and 1,580 mm high. It is ready to send.

Verdict: Needs approval.

  • Motors on a non-standard supply. The standard motors run on 24 V DC; other voltages are available on request, and a person should confirm the voltage with the manufacturer.
  • Configuration summary. 3 function(s) in the tank, 1,050 mm wide and 1,580 mm high, 2 motor(s).

5. Automatic transfer scheme: The agent resubmits after fixing the errors

The agent's request. Please quote an Aegis Plus ring main unit: 12 kV, 50 Hz, non-extensible, installed indoor, with 2 load break switches, 1 vacuum circuit breaker; the Gemini 3 RTU, an automatic transfer scheme, 2 motors on 24 V DC, voltage detection (Wega22C). The quote states 1,050 mm wide and 1,580 mm high. It is ready to send.

Verdict: Allowed.

  • Configuration summary. 3 function(s) in the tank, 1,050 mm wide and 1,580 mm high, 2 motor(s).

6. Transformer protection: A time limit fuse on a 2,500 kVA transformer that needs thermal overload protection

The agent's request. Please quote an Aegis Plus ring main unit: 12 kV, 50 Hz, non-extensible, installed indoor, with 2 load break switches, 1 vacuum circuit breaker; protection by a time limit fuse, a 2,500 kVA transformer, thermal overload protection required. The quote states 1,050 mm wide and 1,430 mm high. It is ready to send.

Verdict: Blocked.

  • Protection needs a CT ratio. The time limit fuse or relay needs a protection current transformer ratio, and none was chosen.
  • Time limit fuse above 2000 kVA. Time limit fuse protection covers transformers up to 2,000 kVA; the transformer is 2,500 kVA.
  • Protection device without thermal overload. The customer needs thermal overload protection and the chosen device does not provide it; a time limit fuse gives fault protection only, and the WIP1 and SIA-C relays do not list thermal overload.

7. Transformer protection: The agent resubmits after fixing the errors

The agent's request. Please quote an Aegis Plus ring main unit: 12 kV, 50 Hz, non-extensible, installed indoor, with 2 load break switches, 1 vacuum circuit breaker; protection by an ADR241S relay, a protection CT (Dual200_100), a 2,500 kVA transformer, thermal overload protection required. The quote states 1,050 mm wide and 1,430 mm high. It is ready to send.

Verdict: Allowed.

  • Configuration summary. 3 function(s) in the tank, 1,050 mm wide and 1,430 mm high, 0 motor(s).

Narration transcript

Click to expand

The text of the narrated walkthrough, step by step.

  1. Welcome to a demo of Predictika's Validator. An AI sales agent configures a Lucy Electric Aegis Plus ring main unit: the voltage and frequency, the switching functions in the tank, extensibility, and more. Before the quote goes out, the agent sends it to Predictika, which checks it against a declarative model of the public product catalogue and returns a verdict, every reason and the dimensions it computed.
  2. I will start with the first request by the agent.
  3. The agent says. Please quote an Aegis Plus ring main unit: 12 kV, 50 Hz, non-extensible, installed indoor, with 2 load break switches, 1 vacuum circuit breaker; an automatic transfer scheme. The quote states 1,050 mm wide and 1,430 mm high. The rest of the request is on screen.
  4. Before it goes out, the agent calls the validator.
  5. Blocked, with three findings, all in one answer. The automatic transfer scheme needs the integrated Gemini 3 RTU, and the quote has none. The automatic transfer scheme operates the two incoming load break switches by motor; the quote has 0 motors. The automatic transfer scheme detects loss of voltage with a voltage detection system (VDS), and the quote has none.
  6. The validator returned three blocking findings in one answer. A check that reads one field at a time would pass most of this; it shows only when the choices in the quote are checked against each other.
  7. What this shows: for a dependent set of automation parts, a rules-based CPQ can do this only with workarounds.
  8. Now the agent resubmits.
  9. The corrected request. It changes the Integrated RTU to yes, the motors to 2, the motor supply to other, the voltage detection to Wega22C and the stated height to 1,580.
  10. It calls the validator again.
  11. Not blocked, but held for a person.
  12. The three blocking findings are cleared; one approval remains for a person: motors on a non-standard supply.
  13. The agent resubmits once more.
  14. The revised request. It changes the motor supply to 24 V DC.
  15. It calls the validator once more.
  16. This time the validator clears it.
  17. The earlier finding is cleared, and the validator's figure matches the quote.
  18. Three problems caught in one call, fixed in two passes, and a clean quote. That is the value of Predictika's validator: catching mistakes before they reach the customer. Now you can try the other scenarios yourself.