Predictika · Commercial flooring installation quotes
An AI sales agent prepares a quote for the adhesive and site conditions of a commercial luxury vinyl tile installation. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the installation guidelines and returns a verdict, every reason and the adhesive quantity it computed.
This validator models adhesive installations of Mannington Commercial LVT under the installation guidelines, not just the scenarios shown below.
Any adhesive installation of this product that touches these rules is in scope — not only the scenarios pictured here. Not covered: prices (the guide carries none, so this validator produces no price build-up or line-item quote), other Mannington product lines, other manufacturers' products, and installation steps not stated as limits.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Moisture limits that differ by adhesive | Only with care A relative humidity and an emission rate limit for each adhesive, each tied to the test chosen. It works, but every adhesive added is another set of rules to maintain. | The adhesive and the test results are in one request and each reading is checked against the limit for that adhesive. |
| Site conditions that depend on the subfloor | Only with workarounds Wood subfloor thickness, underlayment type and radiant heat limits apply only for some subfloors, so they need cross-line rules. | Every choice is in one request, so the conflict is found whichever order the choices arrive in. |
| A stated adhesive quantity that must cover the area | Only with care A stated quantity is a free-entry field; a rule can compare it with the area divided by the spread rate, but someone has to write and maintain that arithmetic. | The stated quantity travels with the quote and is compared with the computed minimum on every call. |
| Limits on temperature, acclimation, humidity and heat | Only with workarounds Each limit is a separate threshold rule on a free-entry field, and some limits only matter with radiant heat, so the rules multiply. | Each limit is checked on every call and each finding names the value and the limit. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The in-situ relative humidity of the slab is 96 percent; the limit for this adhesive is 95 percent, so the slab needs a moisture suppressant system or a different adhesive. |
| 2 | The slab moisture vapor emission rate is 11 lbs per 1,000 sq ft per 24 hours; the limit for this adhesive is 10, so the slab needs a moisture suppressant system or a different adhesive. |
| 3 | No moisture test is recorded, and the guide gives no exemption from testing for this adhesive and these slab conditions; test with ASTM F2170 (in-situ relative humidity) or ASTM F1869 (calcium chloride). |
| 4 | Concrete on or below grade must have a suitable vapor retarder directly beneath the slab, and none is recorded. |
| 5 | The slab surface pH is 12.5; the limit for this adhesive is 12.0. |
| 6 | The in-situ relative humidity of the slab is 90 percent; the limit for this adhesive is 85 percent, so the slab needs a moisture suppressant system or a different adhesive. |
| 7 | The slab surface pH is 9.5; the limit for this adhesive is 9.0. |
| 8 | The slab moisture vapor emission rate is 6 lbs per 1,000 sq ft per 24 hours; the limit for this adhesive is 5, so the slab needs a moisture suppressant system or a different adhesive. |
| 9 | The in-situ relative humidity of the slab is 99 percent; the limit for this adhesive is 98 percent, so the slab needs a moisture suppressant system or a different adhesive. |
| 10 | XpressStep is not approved for abusive conditions such as dragging force, direct sunlight or topical moisture. |
| 11 | XpressStep is approved under stationary heavy point loads only with double coverage application and within the flooring recommended psi loading; a person should confirm both. |
| 12 | The guide points to MoistureLoc or V-95 for areas with high point loads or heavy rolling loads; a person should confirm V-88 for this area. |
| 13 | The guide says areas with heavy direct sunlight for long periods should use window treatments or MoistureLoc or V-95; a person should confirm the plan for V-88. |
| 14 | The guide says MoistureLoc must be used in wet areas such as locker rooms, and V-95 is for areas with standing water; this adhesive is neither. |
| 15 | Perimeter glue installation with MT-711 is for raised access flooring only. |
| 16 | The guide lists MT-711 perimeter installation only for Natural Optimist, No Reservations Xpress and Uninterrupted LVT. |
| 17 | The perimeter glue method must not be used in areas with heavy traffic or rolling loads or where high performance is needed. |
| 18 | The guide says never to install LVT over residual asphalt-type (cutback) adhesive, because bleed-through may occur. |
| 19 | The guide says never to install Mannington flooring over third-party padding or crumb rubber. |
| 20 | Concrete subfloors must not consist of lightweight concrete or gypsum. |
| 21 | The concrete subfloor is 2,500 psi; the guide requires a minimum compressive strength of 3,000 psi. |
| 22 | The concrete is 30 days old; the guide says new concrete should cure a minimum of 6 weeks (45 days). |
| 23 | The subfloor gap is 7/32 in under a 10 ft straightedge and 1/32 in under a 1 ft straightedge; the guide allows 3/16 in (6/32) in 10 ft and 1/32 in in 1 ft. |
| 24 | The subfloor gap is 4/32 in under a 10 ft straightedge and 2/32 in under a 1 ft straightedge; the guide allows 3/16 in (6/32) in 10 ft and 1/32 in in 1 ft. |
| 25 | The wood subfloor and underlayment total 12/16 in; the guide requires double-layer construction at least 1 in (16/16) thick. |
| 26 | The underlayment panel is 3/16 in thick; the guide requires at least 1/4 in (4/16). |
| 27 | Particleboard, chipboard, construction-grade plywood, hardboard and flakeboard are not recommended as underlayment, and Mannington does not accept responsibility for adhered installation over them. |
| 28 | Wood moisture content is 15 percent in the subfloor and 14 percent in the underlayment; the guide allows at most 14 percent. |
| 29 | Wood moisture content is 12 percent in the subfloor and 8 percent in the underlayment; the guide requires readings within 3 percent of each other. |
| 30 | The installation area is at 64 F; it must be kept between 65 and 85 F for 48 hours before, during and after installation. |
| 31 | The installation area is at 86 F; it must be kept between 65 and 85 F for 48 hours before, during and after installation. |
| 32 | The materials have been conditioned for 24 hours; the guide requires at least 48 hours. |
| 33 | Job-site testing must wait until the building envelope is sealed (walls, roof, windows and doorways installed). |
| 34 | The radiant-heated subfloor surface reaches 90 F; the guide says it must not exceed 85 F. |
| 35 | The radiant system will be switched off for 24 hours around installation; the guide requires at least 48 hours before, during and after. |
| 36 | The room relative humidity is 70 percent; the guide recommends keeping it between 30 and 60 percent. |
| 37 | The room relative humidity is 25 percent; the guide recommends keeping it between 30 and 60 percent. |
| 38 | Removing the existing floor covering is always best; installing over it means the contractor assumes responsibility for the result, so a person should confirm the owner accepts that. |
| 39 | The guide does not recommend mixing dye lots; it needs the owner approval and sign-off before work starts. |
| 40 | The quote has 19 units of adhesive; at the highest spread rate the guide gives for this adhesive (250 sq ft per unit) the area needs at least 20. |
| 41 | The quote has 20 units of adhesive; at the highest spread rate the guide gives for this adhesive (250 sq ft per unit) the area needs at least 21. |
| 42 | The in-situ relative humidity of the slab is 92 percent; the limit for this adhesive is 85 percent, so the slab needs a moisture suppressant system or a different adhesive. |
| 43 | The slab surface pH is 10.0; the limit for this adhesive is 9.0. |
| 44 | The subfloor gap is 9/32 in under a 10 ft straightedge and 1/32 in under a 1 ft straightedge; the guide allows 3/16 in (6/32) in 10 ft and 1/32 in in 1 ft. |
| 45 | The installation area is at 60 F; it must be kept between 65 and 85 F for 48 hours before, during and after installation. |
| 46 | The quote has 10 units of adhesive; at the highest spread rate the guide gives for this adhesive (220 sq ft per unit) the area needs at least 23. |
| 47 | The concrete subfloor is 2,800 psi; the guide requires a minimum compressive strength of 3,000 psi. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote 12,000 sq ft of Mannington Commercial LVT with V-95 adhesive over a porous concrete slab. The in-situ relative humidity is 90 percent and the surface pH is 9.5. The job has heavy rolling loads. The installation area is at 72 F, the room humidity is 45 percent and the material has acclimated for 48 hours. The quote states 50 unit(s) of adhesive. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 12,000 sq ft of Mannington Commercial LVT with MoistureLoc adhesive over a porous concrete slab. The in-situ relative humidity is 90 percent and the surface pH is 9.5. The job has heavy rolling loads. The installation area is at 72 F, the room humidity is 45 percent and the material has acclimated for 48 hours. The quote states 49 unit(s) of adhesive. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 8,000 sq ft of Mannington Commercial LVT with V-88 adhesive over a wood subfloor with particleboard underlayment. The subfloor and underlayment total 12/16 in, the underlayment alone is 4/16 in, and moisture content is 11 percent in the subfloor and 10 percent in the underlayment. The installation area is at 72 F, the room humidity is 45 percent and the material has acclimated for 48 hours. The quote states 32 unit(s) of adhesive. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 8,000 sq ft of Mannington Commercial LVT with V-88 adhesive over a wood subfloor with APA plywood underlayment. The subfloor and underlayment total 16/16 in, the underlayment alone is 8/16 in, and moisture content is 11 percent in the subfloor and 10 percent in the underlayment. The installation area is at 72 F, the room humidity is 45 percent and the material has acclimated for 48 hours. The quote states 32 unit(s) of adhesive. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 15,000 sq ft of Mannington Commercial LVT with V-88 adhesive over a porous concrete slab. The in-situ relative humidity is 80 percent and the surface pH is 9.0. The job has radiant heat (surface 92 F, system off 24 hours), mixed dye lots. The installation area is at 61 F, the room humidity is 70 percent and the material has acclimated for 24 hours. The quote states 60 unit(s) of adhesive. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 15,000 sq ft of Mannington Commercial LVT with V-88 adhesive over a porous concrete slab. The in-situ relative humidity is 80 percent and the surface pH is 9.0. The job has radiant heat (surface 85 F, system off 48 hours), mixed dye lots. The installation area is at 70 F, the room humidity is 70 percent and the material has acclimated for 48 hours. The quote states 60 unit(s) of adhesive. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote 15,000 sq ft of Mannington Commercial LVT with V-88 adhesive over a porous concrete slab. The in-situ relative humidity is 80 percent and the surface pH is 9.0. The job has radiant heat (surface 85 F, system off 48 hours). The installation area is at 70 F, the room humidity is 50 percent and the material has acclimated for 48 hours. The quote states 60 unit(s) of adhesive. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.