Predictika · Build-to-print fabricated component quotes
An AI sales agent prepares a build-to-print quote for a fabricated metal component: the primary process, material, tooling, welding, pretreatment and coating, and the lead time. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the process route and returns a verdict, every reason and the figures it computed.
This validator models build-to-print component quotes built from the process capabilities Mayville Engineering Company (MEC) lists in its annual report, not just the scenarios shown below.
Any build-to-print quote that touches these processes and rules is in scope — not only the scenarios pictured here. Not covered: prices (this validator produces no price build-up or line-item quote), machining, design and prototyping services, aftermarket components, plastics and composites, and MEC's other facilities and customers. Items marked with an asterisk (*) are illustrative. MEC has not published, approved or used these rules; all customers and parts are fictional.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Finishing steps that depend on the material | Only with care Aluminum takes Alodine and steel takes zinc phosphate or acid pickle, but the material is chosen on one line and the pretreatment on another; each pairing is a rule to write and keep. | Material, pretreatment and coating are in one request and every pairing is checked together. |
| Dies and billets that go with only some processes | Only with workarounds Stamping and extrusion need tooling, lasers and bending must not carry it, and a billet size belongs only on extrusions; these are conditional dependencies across several lines that interact. | The process, tooling and billet are in one request, so the conflict is found whichever order the choices arrive in. |
| Limits that depend on the process chosen | Only with care Thickness, press tonnage, tube size and profile size each apply to one process; a rule per process and per limit, and an extrusion profile limit that depends on the billet. | Each limit is checked on every call against the chosen process, and the billet limit is computed. |
| Lead time that must match the route | Only with workarounds The standard lead time adds up the process, tooling, welding and coating; a stated lead time is a free-entry field, so the sum and the comparison need their own maintained logic. | The lead time is computed from the route on every call and compared with the figure the quote states and with the need date. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as a step is saved, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | Sheet laser cutting is limited to metal up to 1 inch thick; the quote has sheet 18 sixteenths of an inch thick (16 is 1 inch). |
| 2 | Stamping presses run from 50 to 1,200 tons; the quote has a 40-ton press. |
| 3 | Stamping presses run from 50 to 1,200 tons; the quote has a 1,300-ton press. |
| 4 | Tube bending covers tube from 1/4 inch up to 6 inches across; the quote has a tube 25 quarter-inches across (24 is 6 inches). |
| 5 | Tube bending covers tube from 1/4 inch up to 6 inches across; the quote has a tube 0 quarter-inches across (24 is 6 inches). |
| 6 | Stamping and aluminum extrusion need a die; new tool design and build or existing tooling must be on the quote. |
| 7 | Laser cutting and tube bending run from programs and need no die; tooling belongs on stamping and aluminum extrusion only. |
| 8 | Aluminum extrusion is made from aluminum of the 6000 series; the quote has a different material. |
| 9 | An aluminum extrusion needs a billet size (4.5, 6.0 or 8.0 inch) on the quote. |
| 10 | The profile measures 9 half-inches across, more than the 8 half-inches the chosen billet allows. |
| 11 | A billet size belongs only on an aluminum extrusion. |
| 12 | A brake press forms flat blanks from laser cutting or stamping; it cannot form tube or extruded parts. |
| 13 | Flux-core wire welding is not used on aluminum; aluminum is welded with GTAW or aluminum GMAW. |
| 14 | Resistance welding is for sheet-based parts from laser cutting or stamping, not tube or extruded parts. |
| 15 | Aluminum parts take the Alodine conversion pretreatment; zinc phosphate and acid pickle are for steel. |
| 16 | The Alodine conversion pretreatment is for aluminum; steel takes zinc phosphate or acid pickle. |
| 17 | A coating needs a pretreatment step on the quote. |
| 18 | Chemical agent resistant coating (CARC) is for military programs; the quote is for a commercial program. |
| 19 | The quote states a standard lead time of 9 weeks, but the process route on it gives 4 weeks. |
| 20 | The quote states a standard lead time of 1 weeks, but the process route on it gives 4 weeks. |
| 21 | The customer needs the parts in 10 weeks but the standard lead time is 15 weeks; expedited production needs plant scheduling approval. |
| 22 | A tolerance of 1 thousandths of an inch is tighter than the .002 inch laser cutting is quoted at; engineering review needed. |
| 23 | New tooling is quoted for an order of only 600 pieces; sales management approves tooling that volume does not pay back. |
| 24 | The quote states a standard lead time of 5 weeks, but the process route on it gives 7 weeks. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote tube bending of a carbon steel part, 12,000 pieces, tube 6.5 inch across, with no tooling, robotic GMAW welding and E-coat for a commercial program. The customer needs the parts in 12 weeks and the quote states a standard lead time of 6 weeks. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote tube bending of a carbon steel part, 12,000 pieces, tube 5.5 inch across, with no tooling, robotic GMAW welding, zinc phosphate pretreatment and E-coat for a commercial program. The customer needs the parts in 12 weeks and the quote states a standard lead time of 6 weeks. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote stamping of a carbon steel part, 600 pieces on a 1,400-ton press, with no tooling, brake press forming, zinc phosphate pretreatment and E-coat for a commercial program. The customer needs the parts in 12 weeks and the quote states a standard lead time of 5 weeks. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote stamping of a carbon steel part, 600 pieces on an 800-ton press, with new tool design and build, brake press forming, zinc phosphate pretreatment and E-coat for a commercial program. The customer needs the parts in 12 weeks and the quote states a standard lead time of 15 weeks. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote stamping of a carbon steel part, 25,000 pieces on an 800-ton press, with new tool design and build, brake press forming, zinc phosphate pretreatment and E-coat for a commercial program. The customer needs the parts in 16 weeks and the quote states a standard lead time of 15 weeks. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote aluminum extrusion of a carbon steel part, 8,000 pieces, profile 4.5 inch across with no billet size given, with new tool design and build, zinc phosphate pretreatment and powder coating for a commercial program. The customer needs the parts in 14 weeks and the quote states a standard lead time of 10 weeks. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote aluminum extrusion of a 6000-series aluminum part, 8,000 pieces, profile 4.5 inch across on a 6.0 inch billet, with new tool design and build, Alodine pretreatment and powder coating for a commercial program. The customer needs the parts in 14 weeks and the quote states a standard lead time of 11 weeks. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.