Predictika · Field NDT and acoustic emission inspection jobs
An AI sales agent prepares a field inspection job for an industrial plant: the inspection method, the asset, how the crew reaches it, the crew and schedule and the job total. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the applicability and planning rules and returns a verdict, every reason and the figures it computed.
This validator models field inspection jobs built from these methods, not just the scenarios shown below. Items marked * are illustrative additions.
Any field inspection job that touches these methods and rules is in scope — not only the scenarios pictured here. Not covered: pipeline in-line inspection, engineering and consulting services, monitoring software and sensor systems, other methods on Mistras's service pages, and regional labor rules. Applicability rules and rates are typical for this industry and were not published by Mistras Group.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Methods that apply only to certain assets and conditions | Only with care A rule per method on the asset type and whether the equipment is in service; each new method adds more rules. | The method, asset and operating condition are in one request and every pairing is checked together. |
| Insulation that must come off for some methods but not others | Only with workarounds Depends on a method on one line and a fact about the asset on another, with exceptions for methods that work through insulation. | The method and the asset facts travel together, so each method is checked against the insulation fact. |
| Access methods with height ranges and crew minimums | Only with care A range and a crew rule per access method, each also depending on the method chosen. | Height, access, crew and method are checked together on every call. |
| A Level III or an attendant that the crew must include | Only with care Crew composition rules depend on the method and the space; they can be written but have to be maintained for each. | Crew facts are part of the request and checked against the method and the space. |
| A stated job total that must equal the computed total | Only with care A free-entry total can be compared with the computed one, but someone has to write and maintain the comparison after every rate change. | The stated total travels with the job and is compared with the computed total on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the job is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the order; approval findings need a person to sign off; everything else is computed.
| 1 | MONPAC acoustic emission testing is for pressure vessels, spheres, columns and tanks; it is not used on piping or valves. |
| 2 | MONPAC is applied while the vessel is pressurized, in a first hydrotest, a requalification hydrotest or on-line pressurization; the job plans none. |
| 3 | TankPAC assesses the floors of aboveground storage tanks; the asset on the job is not a storage tank. |
| 4 | TankPAC monitors the tank floor while the tank stays in service and at rest; the job has the tank shut down. |
| 5 | VPAC II detects and quantifies through-valve leaks; the asset on the job is not a set of valves. |
| 6 | VPAC II listens to a valve under process conditions; the job has the line shut down. |
| 7 | This job covers valve inspection with VPAC II only; the selected method is for other assets. |
| 8 | Acoustic emission tests are overseen by certified acoustic emission specialists; the crew has no Level III. |
| 9 | Magnetic particle testing works only on ferromagnetic material; the asset is stainless steel. |
| 10 | Pulsed eddy current screens carbon steel through insulation; the asset is not insulated carbon steel. |
| 11 | This method needs the bare surface; the asset is insulated and the job does not remove the insulation. |
| 12 | Digital radiography needs a cleared exclusion zone around the source; the job has none. |
| 13 | Digital radiography cannot be carried out from rope access or a drone. |
| 14 | Radiography on equipment in service needs a person to confirm the safety plan. |
| 15 | The wall is 8 mm; TOFD is planned only for walls of 12 mm or more. |
| 16 | The wall is 5 mm; phased array is planned only for walls of 6 mm or more. |
| 17 | Unmanned systems are planned here for ultrasonic thickness readings only. |
| 18 | The work is 8 m above ground; ground access reaches 3 m. |
| 19 | A V-Deck suspended platform is planned from 10 m; the work is at 6 m. |
| 20 | Rope access is worked by at least two people; the crew is 1. |
| 21 | Confined space entry needs a standby attendant outside; the crew is 1. |
| 22 | The shift is 14 hours; a field shift is planned at no more than 12 hours. |
| 23 | A shift of 11 hours is overtime for the crew; a person should confirm it. |
| 24 | A job of 12 days needs a crew rotation plan; a person should confirm it. |
| 25 | The job states a total of 20,000 dollars; the crew, equipment, access and mobilization add up to 20,100 dollars. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote TankPAC tank floor testing on a carbon steel storage tank (wall 14 mm, shut down), ground access at 2 m, a crew of 3 for 5 day(s) of 14 hours. The job total is $29,250. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote TankPAC tank floor testing on a carbon steel storage tank (wall 14 mm, in service), ground access at 2 m, a crew of 3 including a Level III for 5 day(s) of 10 hours. The job total is $30,500. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote phased array ultrasonic testing on a carbon steel pressure vessel (wall 14 mm, shut down), rope access at 25 m, a crew of 1 for 6 day(s) of 8 hours. The asset is insulated. The job total is $18,900. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote phased array ultrasonic testing on a carbon steel pressure vessel (wall 14 mm, shut down), rope access at 25 m, a crew of 3 for 6 day(s) of 8 hours. The asset is insulated and the insulation will be removed. The job total is $35,100. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote MONPAC acoustic emission testing on a carbon steel storage tank (wall 14 mm, shut down), ground access at 12 m, a crew of 3 for 3 day(s) of 8 hours. The job total is $19,050. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote MONPAC acoustic emission testing on a carbon steel storage tank (wall 14 mm, shut down), scaffold at 12 m, a crew of 3 including a Level III for 3 day(s) of 8 hours. A hydrotest is planned. The job total is $21,150. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.