Predictika · Industrial networking
An AI sales agent prepares an order for the EDS-4014 Series managed Ethernet switch: the model (low-voltage or high-voltage power input, standard or wide temperature), the SFP module in each of the six fiber slots, any DIN-rail power supplies and storage kit, and the approvals, temperatures and ring recovery time the customer needs. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the figures in the public EDS-4014 data sheet and returns a verdict, every reason and the figures it computed.
This validator models one EDS-4014 Series switch at a time, based on the public Moxa EDS-4014 Series data sheet (updated June 2025), not just the scenarios shown below.
Any EDS-4014 order that touches these rules is in scope — not only the scenarios pictured here. Not covered: prices (the data sheet lists none, so this page shows no price build-up), other Moxa switch series, routers and gateways, the wall-mount kit (the data sheet gives no part number), firmware and software licenses, and real-world link-budget or traffic behavior.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Every SFP module and the storage kit against the site temperature range | Only with workarounds Each of 33 modules has its own operating range and the switch has another, so a rules-based CPQ needs a rule per module or a lookup table, checked for each of six slots, and every data sheet revision means editing them. | Each slot's module is looked up and compared with the site range, together with the model, power supply and storage kit, on every call. |
| Speed class by port group (2.5 Gbps and 100 Mbps modules) | Only with care Four slots take 100 and 1000 Mbps and two ports take 1000 and 2500 Mbps, so the allowed modules depend on which slot they sit in. | The speed class of the module in each slot is compared with that slot's port group on every call. |
| Power input, site supply, DIN-rail supplies and redundancy | Only with care Which supply voltage fits which model, whether a supply is needed at all, and redundancy that exists only on one model family are separate dependencies that must be written in a fixed order. | Model, site supply, both feeds, rated watts and other load are compared together, in any order. |
| Approvals that exist on only some models | Only with care The data sheet lists hazardous-location and maritime approvals for the -LV models only, so a rule has to connect a requirement to the power input. | The requirement and the chosen model arrive in one request and are compared on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the order is saved or a step is completed, so a person often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The site range of -45 to 55 degrees Celsius is wider than the widest operating range of any EDS-4014 model (-40 to 75 degrees Celsius). |
| 2 | The selected model operates from -10 to 60 degrees Celsius; the site needs -20 to 55. |
| 3 | 2 installed SFP modules are not rated for the site range of -20 to 55 degrees Celsius. |
| 4 | 2 installed SFP modules are not rated for the site range of -30 to 70 degrees Celsius. |
| 5 | The selected model operates from -10 to 60 degrees Celsius; the site needs 0 to 65. |
| 6 | 2 installed SFP modules are not rated for the site range of 0 to 65 degrees Celsius. |
| 7 | The quote needs 9 RJ45 ports; the EDS-4014 has 8 10/100BaseT(X) ports. |
| 8 | The quote needs 4 fiber ports; 3 of the 6 SFP slots have a module. |
| 9 | 1 of the four 100/1000BaseSFP slots holds a 2.5 Gbps module; those slots support 100 and 1000 Mbps. |
| 10 | 1 of the two 1000/2500BaseSFP ports holds a 100 Mbps module; those ports support 1000 and 2500 Mbps. |
| 11 | 1 installed SFP modules reach less than the distance the link needs. |
| 12 | ATEX, IECEx and Class I Division 2 approvals are listed only for the -LV models. |
| 13 | DNV, ABS, NK and LR maritime approvals are listed only for the -LV models. |
| 14 | The -HV models run on 88 to 300 VDC or 85 to 264 VAC; a 12, 24 or 48 VDC supply is outside that range. |
| 15 | The -LV models run on 9.6 to 60 VDC; a site on AC mains needs a DIN-rail power supply on feed A. |
| 16 | Redundant power needs an -LV model (redundant dual inputs, with a supply on each feed on AC mains); the -HV models have a single input. |
| 17 | The 24 and 48 VDC DIN-rail supplies cannot power an -HV model, which takes mains or 110/220 VDC directly. |
| 18 | A selected power supply is not rated for the site range of -25 to 70 degrees Celsius (HDR-60-24: -30 to 70; NDR and MDR supplies: -20 to 70). |
| 19 | The switch draws up to 12.15 W (13 W rounded up) plus 30 W of other load, 43 W in total; the smallest selected power supply is rated 40 W. |
| 20 | The selected storage kit operates from 0 to 60 degrees Celsius; the site needs -30 to 70. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote one EDS-4014-4GS-2QGS-LV for a site that runs from -30 to 65 degrees Celsius on a 12, 24 or 48 VDC supply, with SFP-1GLXLC in slot 1, SFP-1GSXLC in slot 2 and SFP-2.5GSLC-T in the first 2.5 Gbps port. The customer needs 6 RJ45 ports and 3 fiber ports. The quote states 3 fiber ports. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one EDS-4014-4GS-2QGS-LV-T for a site that runs from -30 to 65 degrees Celsius on a 12, 24 or 48 VDC supply, with SFP-1GLXLC-T in slot 1, SFP-1GSXLC-T in slot 2 and SFP-2.5GSLC-T in the first 2.5 Gbps port. The customer needs 6 RJ45 ports and 3 fiber ports. The quote states 3 fiber ports. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote one EDS-4014-4GS-2QGS-HV for a site that runs from 0 to 50 degrees Celsius on AC mains, with SFP-1GLXLC in slot 1 and SFP-1GLXLC in slot 2. The customer needs 4 RJ45 ports and 2 fiber ports, and requires hazardous-location approvals and redundant power. The quote states 2 fiber ports. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one EDS-4014-4GS-2QGS-LV for a site that runs from 0 to 50 degrees Celsius on AC mains, with SFP-1GLXLC in slot 1 and SFP-1GLXLC in slot 2, an NDR-120-24 power supply on feed A and an NDR-120-24 power supply on feed B. The customer needs 4 RJ45 ports and 2 fiber ports, and requires hazardous-location approvals and redundant power. The quote states 2 fiber ports. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote one EDS-4014-4GS-2QGS-LV for a site that runs from 0 to 55 degrees Celsius on a 12, 24 or 48 VDC supply, with SFP-1GLXLC in slot 1, SFP-2.5GSLC-T in slot 3, SFP-1FESLC-T in the first 2.5 Gbps port and SFP-2.5GLSLC-T in the second 2.5 Gbps port. The customer needs 5 RJ45 ports and 4 fiber ports. The ring needs a recovery time of 30 ms and runs over gigabit links. The quote states 5 fiber ports. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one EDS-4014-4GS-2QGS-LV for a site that runs from 0 to 55 degrees Celsius on a 12, 24 or 48 VDC supply, with SFP-1GLXLC in slot 1, SFP-1GLXLC in slot 2, SFP-2.5GSLC-T in the first 2.5 Gbps port and SFP-2.5GLSLC-T in the second 2.5 Gbps port. The customer needs 5 RJ45 ports and 4 fiber ports. The ring needs a recovery time of 30 ms and runs over gigabit links. The quote states 4 fiber ports. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote one EDS-4014-4GS-2QGS-LV for a site that runs from 0 to 55 degrees Celsius on a 12, 24 or 48 VDC supply, with SFP-1FESLC-T in slot 1, SFP-1FESLC-T in slot 3, SFP-2.5GSLC-T in the first 2.5 Gbps port and SFP-2.5GLSLC-T in the second 2.5 Gbps port. The customer needs 5 RJ45 ports and 4 fiber ports. The ring needs a recovery time of 30 ms and runs over 100 Mbps links. The quote states 4 fiber ports. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.