Predictika · Campus network-as-a-service quotes
An AI sales agent scopes a campus network-as-a-service subscription for a customer site: service tier, site square footage, floors and wiring closets, users, wired load, access point and switch counts, term, add-ons and discount. Before it goes out, the agent sends the quote to Predictika, which checks it against a declarative model of the scoping rules and returns a verdict, every reason and the sizing figures it computed.
This validator models site-scoping for subscription campus network quotes where hardware is bundled into the service — not just the scenarios shown below.
Any subscription quote for these services that touches tier features, site sizing, term, add-ons or discounts is in scope — not only the scenarios pictured here. Not covered: prices (none are published, so this validator produces no price build-up or line-item quote), cabling, implementation and professional services fees, and any vendor CPQ platform. Assumptions: coverage per access point, ports per switch, users per access point, term range, same-day replacement availability and discount limits are invented illustrative values.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Wireless coverage that depends on square footage and device load | Only with workarounds Coverage per access point changes with load, so the product rules need a computed field and a comparison with the site size, usually written as custom logic. | Coverage is computed from the access point count and load on every call and compared with the site. |
| A switch for every closet and a closet for every floor | Only with care Each is a validation rule on a quote field that the rep must remember to fill in correctly; it works, but one rule per relationship. | Floors, closets and switches are inputs, and every relationship is checked together. |
| Add-ons and options that depend on the service tier | Only with care Each tier-and-option pair is its own product rule. It works, but every new option adds rules that someone must keep in step. | Availability comes from the tier record, so a new option or tier is a row, not a new rule. |
| A quote that states coverage or ports different from the hardware quoted | Only with workarounds Stated figures are rarely fields on the quote, so there is nothing for a rule to compare against. | The stated figures travel with the quote and are compared with the computed ones on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in, ordered by severity. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | 40 access points cover 100000 sq ft, below the 120000 sq ft site. |
| 2 | 961 users is above the 960 the 24 access points are scoped to serve on the Essentials tier. |
| 3 | 14 switches provide 672 wired ports, below the 700 ports the site needs. |
| 4 | 1 switches cannot serve 2 wiring closets; each closet needs at least one switch. |
| 5 | 2 closets cannot serve 3 floors; each floor needs a closet. |
| 6 | unlimited east-west segmentation is not available on the Essentials tier. |
| 7 | the financially-backed performance guarantee is not available on the Essentials tier. |
| 8 | same-day hardware replacement is not available on the Essentials tier. |
| 9 | a 24 month term is outside the 36 to 60 month range quoted on the Advanced tier. |
| 10 | a 30 percent discount is above the 25 percent limit that anyone can approve. |
| 11 | the quote states 100000 sq ft of coverage, but the 50 access points cover 90000 sq ft. |
| 12 | the quote states 300 wired ports, but the 7 switches provide 336. |
| 13 | a 18 percent discount is above the 10 percent a sales rep can give; it needs sales management approval. |
| 14 | 20 access points cover 50000 sq ft, within 10 percent of the 50000 sq ft site; confirm with a site survey. |
| 15 | 41 access points cover 102500 sq ft, more than twice the 50000 sq ft site; confirm the design with the customer. |
| 16 | a 1100000 sq ft site is above 1,000,000 sq ft; it needs a design review before quoting. |