An AI design agent drafts a data hall for GPU racks, with the capex it expects. Before the design goes to the build, the agent sends it to Predictika's validator, which checks the rack systems, row plan, coolant temperature, power architecture, floor rating, site power and the leaf and spine network against each other, and returns a verdict with every reason in one pass. All costs are Predictika estimates in US dollars, and the hall designs are fictional; this is not NVIDIA reference design data.
This validator checks any hall design built from these rack systems, cooling and network parts, not just the scenarios shown below.
Any hall design built from these parts is in scope, not only the scenarios pictured here. Not checked: real NVIDIA reference architectures or pricing, building structure beyond the floor rating, utility interconnect, permits, and the accuracy of the figures the caller states.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI design agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based design checker (one rule per limit, each checked on its own) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | A rules-based design checker | Predictika |
|---|---|---|
| A rack system that needs a different hall | Only with workarounds Kyber racks take 800 VDC power only and need sidecars, while other racks take 415 VAC, so the rules are written once per rack system and per hall. | The rack systems are data: each one's power input, sidecar need, weight and coolant limit are checked against the hall in the same request. |
| Limits that depend on each other | Only with care The floor, the racks, the coolant and the power architecture interact, and fixing one often changes another check. | Every limit is re-evaluated together on each call. |
| Site power that depends on the power mode | Only with care The draw of the whole hall at Max-P and at Dynamic Max-Q is a sum over rows and network, which a one-rule-per-limit checker has to recompute by hand. | The hall draw is computed from the rows and the network and compared with the site on every call. |
| Capex against the budget | Only with workarounds The cost of racks, coolant units and switches has to be added up before it can be compared with a budget. | The capex is computed from the parts and compared with the stated budget in the same call. |
| Every problem returned in one answer | Only with workarounds Checks tend to stop at the first failing limit, so a designer fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the design; approval findings need a person to sign off; everything else is computed.
| 1 | Each rack system has a maximum coolant temperature, and the facility water plus the approach of the coolant unit must stay within it. |
| 2 | Kyber racks take 800 VDC power only and need power sidecars that cover the row; other rack systems take 415 VAC, 800 VDC or either as listed. |
| 3 | The floor rating must carry the weight per square meter of every rack system in the hall. |
| 4 | A row holds the racks and coolant units within its positions, and the coolant units must carry the row with one spare unit. |
| 5 | The racks of one NVLink domain must sit together in one row. |
| 6 | The row busway must carry the row, and the hall must fit in the rows the hall provides. |
| 7 | The design draw (racks plus network, at Max-P or Dynamic Max-Q) must not exceed the site power, and the air plant must carry the air load. |
| 8 | The leaf and spine switches must provide a port for every GPU network port, within one fabric type. |
| 9 | Every rack system must be available by the delivery year. |
| 10 | The design must reach any stated GPU target and stay within any stated budget. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please check this hall design for Tallgrass Cloud: four Rubin Ultra NVL144 Kyber rows of 4 racks and a storage row, in a 415 VAC hall with a 5,000 kg per square meter floor, delivered in 2027. The estimated capex is USD 330,240,000. The design is ready for the build.
Verdict: Blocked.
The agent's request. Please check this hall design for Tallgrass Cloud: four Rubin Ultra NVL144 Kyber rows of 4 racks with two power sidecars each, in an 800 VDC hall with a 2,500 kg per square meter raised floor, delivered in 2027. The estimated capex is USD 324,840,000. The design is ready for the build.
Verdict: Blocked.
The agent's request. Please check this hall design for Tallgrass Cloud: four Rubin Ultra NVL144 Kyber rows of 4 racks with two power sidecars each, in an 800 VDC hall with a 5,000 kg per square meter slab floor, delivered in 2027. The estimated capex is USD 324,840,000. The design is ready for the build.
Verdict: Allowed.
The agent's request. Please check this hall design for Birchwood AI Labs: nine Vera Rubin NVL72 rows of 9 racks and a storage row on a 19,000 kW site, with the racks provisioned at Max-P. The estimated capex is USD 613,700,000. The design is ready for the build.
Verdict: Blocked.
The agent's request. Please check this hall design for Birchwood AI Labs: nine Vera Rubin NVL72 rows of 9 racks and a storage row on a 19,000 kW site, with the racks provisioned at Dynamic Max-Q. The estimated capex is USD 613,700,000. The design is ready for the build.
Verdict: Allowed.
The agent's request. Please check this hall design for Harborview Compute: eight Vera Rubin NVL72 rows of 9 racks and a storage row on a 20,000 kW site, with a budget of USD 500,000,000. The estimated capex is USD 546,150,000. The design is ready for the build.
Verdict: Blocked.
The agent's request. Please check this hall design for Harborview Compute: eight Vera Rubin NVL72 rows of 9 racks and a storage row on a 20,000 kW site, with a budget of USD 600,000,000 and a target of 5,000 GPUs. The estimated capex is USD 546,150,000. The design is ready for the build.
Verdict: Allowed.