Predictika · Industrial supply program quotes
An AI sales agent prepares a monthly supply program quote: a program (Total Supply Management, Vendor Managed Inventory or catalog supply), a product family, sites, SKUs, engineering and value analysis services, aerospace documentation, a term, annual spend, a discount and a stated monthly total. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the programs and returns a verdict and every reason.
This validator models Supply Technologies program quotes, not just the scenarios shown below.
Any Supply Technologies program quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: cold-forming manufacturing and kitting. Service, product family and brand names follow public Supply Technologies pages; every rule, limit and price is modeled and is not published by Park-Ohio or Supply Technologies, whose programs are negotiated (see the note at the foot of the page).
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Programs that cover only some families and services | Only with care Catalog supply covers two families and no engineering services, and aerospace hardware belongs to one program with a documentation option, so each rule is keyed to the program and family together. | The program, family and options are fields of one quote and are checked together on every call. |
| Size, term and spend minimums | Only with care Site and SKU counts, the term, the annual spend minimum for each program and the reviews for large programs interact, so one rule reads several fields at once. | Sites, SKUs, term, spend and program are checked together on every call. |
| A stated monthly total | Only with workarounds The agent states a monthly total, and a rules engine has to rebuild it from the program, sites, SKUs, services and term credit to catch a mismatch. | The total is computed from the quote and compared with the stated figure on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | This model covers 1 to 70 supplied sites; the quote has 0. |
| 2 | This model covers 1 to 70 supplied sites; the quote has 71. |
| 3 | 71 supplied sites on a managed program need a rollout and logistics review. |
| 4 | The program covers 100 to 120,000 SKUs (1 to 1,200 hundreds); the quote has 0 hundreds. |
| 5 | The program covers 100 to 120,000 SKUs (1 to 1,200 hundreds); the quote has 1,201 hundreds. |
| 6 | The program term is 12, 24 or 36 months in this model; the quote has 18 months. |
| 7 | Catalog supply (Southern Fasteners & Supply stock) covers standard fasteners and MRO & Safety only; the quote has engineered fasteners. |
| 8 | Catalog supply (Southern Fasteners & Supply stock) covers standard fasteners and MRO & Safety only; the quote has Industrial Graphics. |
| 9 | Product Development & Engineering and Value Analysis & Engineering belong to managed programs, not catalog supply; the quote has the catalog supply program. |
| 10 | Aerospace hardware (Apollo Aerospace Components) is modeled only inside Total Supply Management for its quality assurance; the quote has Vendor Managed Inventory. |
| 11 | Aerospace hardware needs the aerospace documentation option; the quote has 20 hundreds of SKUs without it. |
| 12 | Aerospace documentation applies to aerospace hardware only; the quote has the engineered fasteners family. |
| 13 | Product Development & Engineering supports designed parts, not MRO & Safety items; the quote has 3 sites. |
| 14 | Annual spend of USD 249 thousand is below the program minimum (modeled as 250 thousand for Total Supply Management and 100 thousand for VMI). |
| 15 | Annual spend of USD 99 thousand is below the program minimum (modeled as 250 thousand for Total Supply Management and 100 thousand for VMI). |
| 16 | Annual spend of USD 0 thousand is below the program minimum (modeled as 250 thousand for Total Supply Management and 100 thousand for VMI). |
| 17 | A discount of 10 percent is above 6 percent and needs sales-management approval. |
| 18 | A discount of 12 percent is above 6 percent and needs sales-management approval. |
| 19 | A discount of 13 percent is above the 12 percent maximum in this model. |
| 20 | An annual spend of USD 20,001 thousand needs an executive supply-risk review. |
| 21 | 41 supplied sites on a managed program need a rollout and logistics review. |
| 22 | A 12-month Total Supply Management term across 11 sites is shorter than the usual implementation payback and needs approval. |
| 23 | The quote states USD 1,000 per month; the program, sites, SKUs and options add up to USD 7,500. |
| 24 | This model covers 1 to 70 supplied sites; the quote has 80. |
| 25 | A discount of 15 percent is above the 12 percent maximum in this model. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote catalog supply for aerospace hardware, supplying 3 sites and 2,000 SKUs for 18 months, with Product Development & Engineering and Value Analysis & Engineering, on USD 600 thousand of annual spend, a 15 percent discount, and a monthly total of USD 7,000. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote Total Supply Management for aerospace hardware, supplying 3 sites and 2,000 SKUs for 24 months, with Product Development & Engineering, Value Analysis & Engineering and aerospace documentation, on USD 600 thousand of annual spend, a 5 percent discount, and a monthly total of USD 13,850. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote Vendor Managed Inventory for MRO & Safety, supplying 85 sites and 2,000 SKUs for 12 months, with Product Development & Engineering, on USD 80 thousand of annual spend, no discount, and a monthly total of USD 9,000. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote Vendor Managed Inventory for MRO & Safety, supplying 12 sites and 2,000 SKUs for 12 months, on USD 400 thousand of annual spend, no discount, and a monthly total of USD 11,100. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote Total Supply Management for engineered fasteners, supplying 45 sites and 150,000 SKUs for 12 months, with aerospace documentation, on USD 25,000 thousand of annual spend, a 9 percent discount, and a monthly total of USD 105,700. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote Total Supply Management for engineered fasteners, supplying 8 sites and 30,000 SKUs for 24 months, on USD 6,000 thousand of annual spend, a 5 percent discount, and a monthly total of USD 23,050. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.