Predictika · Forklift safety quotes
An AI sales agent prepares an order for a fleet of forklifts: the Forklift Gateway and Unity subscription, Speed Manager, Pedestrian Proximity Detection, a video recorder with cameras and an SD card, Forklift Scales and Safety Lights. Before the order goes out, the agent sends it to Predictika, which checks it against a declarative model of what each truck type and each option allows and returns a verdict and every reason.
This validator models On-Site IoT forklift orders, not just the scenarios shown below.
Any On-Site IoT forklift order that touches these rules is in scope — not only the scenarios pictured here. Not covered: Powerfleet On-Road products, asset and off-road IoT and prices. The product names, up to five proximity zones, two Speed Manager throttle levels, fly-by-wire throttles, up to four DVR cameras and the 128 GB SD card limit follow the public Powerfleet On-Site page. All other rules, including the truck-type limits, hours per card and approval thresholds, are modeled from comparable products, not published by Powerfleet. No prices are modeled.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Options that depend on each other | Only with care Speed Manager needs the gateway and the gateway needs Unity, so the dependencies must be chained and kept in step. | Every dependency is checked in the same pass, whatever order the options were chosen in. |
| Limits that depend on the truck type | Only with workarounds Scales, Speed Manager wiring and throttle type depend on the truck, so a table of truck types and options is needed and easy to leave incomplete. | The truck type is checked against every option together on each call. |
| Counts that must stay in range | Only with care Zones, cameras and throttle levels each have their own range, and a count typed too high is often caught only at installation. | Each count is checked against its range and the findings say which one is off. |
| Storage that must fit the video asked for | Only with workarounds Hours of video depend on the card size, so a calculation sits beside the rule and must be updated with every new card. | The hours the card holds are computed in the model and compared with the hours requested. |
| Soft limits that need a person | Only with care Four or five zones, an internal-combustion truck or a large fleet are not errors but need confirmation, which rules often block or ignore. | These come back as approvals, separate from the blocking findings. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the order is saved or a step is completed, so a person often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The order asks for 3 throttle speed levels, but Speed Manager offers two configurable levels. |
| 2 | Speed Manager is triggered by impacts and checklist failures reported through the Forklift Gateway, but the order has no Forklift Gateway. |
| 3 | Speed Manager requires an electronically controlled (fly-by-wire) throttle, but the truck has a mechanical throttle. |
| 4 | Speed Manager on an internal-combustion counterbalance truck needs the throttle wiring confirmed by a technician. |
| 5 | 5 proximity zones on one truck need a site survey of the cabin view; a person should confirm it. |
| 6 | The order asks for 6 proximity alert zones, but Pedestrian Proximity Detection supports 1 to 5 zones. |
| 7 | Without a Forklift Gateway the proximity breaches are not linked to an operator ID; a person should confirm the customer accepts this. |
| 8 | The order puts 5 cameras on one Digital Video Recorder, which supports 1 to 4 cameras. |
| 9 | The order lists 2 cameras but no Digital Video Recorder. |
| 10 | The order asks for 101 hours of stored video, but the chosen SD card holds about 100 hours. |
| 11 | Three or four cameras on a 32 GB card give very short recording history; a person should confirm the card size. |
| 12 | Forklift Scales weigh the load on the mast hydraulics and cannot be fitted to an order picker or pallet jack. |
| 13 | The Forklift Gateway reports its data to the Unity platform, but the order has no Unity subscription. |
| 14 | The order covers 0 trucks; at least 1 is needed. |
| 15 | A rollout of 251 trucks needs a deployment plan reviewed by a person. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote Powerfleet On-Site IoT for 120 reach trucks, with Speed Manager set to 3 throttle levels, Pedestrian Proximity Detection with 6 alert zones and a DVR with 5 cameras and 80 hours of stored video on a 128 GB SD card. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote Powerfleet On-Site IoT for 120 reach trucks, with the Forklift Gateway and a Unity subscription, Speed Manager set to 2 throttle levels, Pedestrian Proximity Detection with 5 alert zones and a DVR with 5 cameras and 80 hours of stored video on a 128 GB SD card. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote Powerfleet On-Site IoT for 120 reach trucks, with the Forklift Gateway and a Unity subscription, Speed Manager set to 2 throttle levels, Pedestrian Proximity Detection with 3 alert zones and a DVR with 4 cameras and 80 hours of stored video on a 128 GB SD card. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote Powerfleet On-Site IoT for 60 order pickers, with the Forklift Gateway and a Unity subscription, a DVR with 3 cameras and 40 hours of stored video on a 32 GB SD card, Forklift Scales and Forklift Safety Lights. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote Powerfleet On-Site IoT for 60 order pickers, with the Forklift Gateway and a Unity subscription, a DVR with 3 cameras and 40 hours of stored video on a 128 GB SD card and Forklift Safety Lights. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote Powerfleet On-Site IoT for 200 internal-combustion counterbalance trucks, with the Forklift Gateway and Speed Manager set to 1 throttle level. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote Powerfleet On-Site IoT for 200 internal-combustion counterbalance trucks, with the Forklift Gateway and a Unity subscription and Speed Manager set to 1 throttle level. It is ready to send.
Verdict: Needs approval.
The text of the narrated walkthrough, step by step.