Predictika · UPS system build sheets
An AI sales agent prepares a build sheet for a Riello UPS Multi Sentry MST 160 or MST 200 system with the number of units in parallel or N+1 redundant, the load it must carry, the site temperature and the power stated to the buyer. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the datasheet limits and returns a verdict, every reason and the figures it computed.
This validator models Multi Sentry MST 160 and MST 200 system build sheets, not just the scenarios shown below.
Any MST 160 or MST 200 system build sheet that touches these rules is in scope — not only the scenarios pictured here. Not covered: prices (Riello UPS publishes no price list, so this validator produces no price build-up or line-item quote), battery cabinets and battery runtime, communication cards and accessories, other Riello UPS ranges (Sentinel, other Multi Sentry sizes, modular UPS), and anything Riello UPS does not state publicly.
7 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| A limit of 8 units per system | Only with care A maximum-quantity rule that has to be written for this product and kept in step with every other rule on the same quote line. | The unit count is part of the same request and is checked on every call. |
| N+1 capacity that is one unit short of the total | Only with workarounds Usable capacity depends on the mode and the unit rating; a rule or formula has to be built and maintained so the load is compared with the right figure. | Usable capacity is computed from the model, mode and units, and the load is compared with it on every call. |
| Power stated on the sheet that must match the units | Only with care A stated figure is a free-entry field; a rule can compare it with the units, but someone has to write and maintain that comparison. | The stated figure travels with the build sheet and is compared with the computed power on every call. |
| Site temperature limits | Only with care A range check on a free-entry field, easy on its own but one more rule to maintain. | Checked on every call alongside all other limits. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the build sheet is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | The build sheet has 9 units in one system, but the Multi Sentry datasheet allows up to 8 units per redundant (N+1) or parallel system. |
| 2 | The build sheet has 10 units in one system, but the Multi Sentry datasheet allows up to 8 units per redundant (N+1) or parallel system. |
| 3 | N+1 redundancy needs at least two units in parallel; this build sheet has one unit. |
| 4 | The load of 161 kW is more than the 160 kW this configuration can supply. |
| 5 | The load of 321 kW is more than the 320 kW this configuration can supply. |
| 6 | The site ambient temperature of 41 degrees C is outside the 0 to 40 degrees C range given for the UPS. |
| 7 | The build sheet states 160 kW, but the selected units deliver 320 kW. |
| 8 | The build sheet states 160 kW, but the selected units deliver 200 kW. |
| 9 | The build sheet states 200 kW, but the selected units deliver 160 kW. |
| 10 | The load of 1,700 kW is more than the 1,600 kW this configuration can supply. |
| 11 | The site ambient temperature of 45 degrees C is outside the 0 to 40 degrees C range given for the UPS. |
| 12 | The build sheet states 1,000 kW, but the selected units deliver 1,800 kW. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please prepare a build sheet for 1 x Multi Sentry MST 200 (200 kW) as an N+1 redundant system, for a load of 150 kW at a site running 25 degrees C. The build sheet states 160 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a build sheet for 1 x Multi Sentry MST 200 (200 kW) as a parallel system, for a load of 150 kW at a site running 25 degrees C. The build sheet states 200 kW. It is ready to send.
Verdict: Allowed.
The agent's request. Please prepare a build sheet for 10 x Multi Sentry MST 200 (200 kW) as an N+1 redundant system, for a load of 1,400 kW at a site running 25 degrees C. The build sheet states 2,000 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a build sheet for 8 x Multi Sentry MST 200 (200 kW) as an N+1 redundant system, for a load of 1,400 kW at a site running 25 degrees C. The build sheet states 1,600 kW. It is ready to send.
Verdict: Allowed.
The agent's request. Please prepare a build sheet for 2 x Multi Sentry MST 160 (160 kW) as an N+1 redundant system, for a load of 250 kW at a site running 45 degrees C. The build sheet states 320 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a build sheet for 3 x Multi Sentry MST 160 (160 kW) as an N+1 redundant system, for a load of 250 kW at a site running 45 degrees C. The build sheet states 480 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please prepare a build sheet for 3 x Multi Sentry MST 160 (160 kW) as an N+1 redundant system, for a load of 250 kW at a site running 35 degrees C. The build sheet states 480 kW. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.