Predictika · Jackup rig quotes
An AI sales agent prepares a quote for newbuild jackup drilling rigs: a rig design, a water depth, a drilling depth, accommodation, a cantilever load, an operating environment, dual-fuel and hybrid power options, a delivery time, a number of rigs and a discount. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of jackup newbuild quotes and returns a verdict, every reason and the total it computed.
This validator models jackup rig quotes, not just the scenarios shown below.
Any jackup rig quote that touches these rules is in scope — not only the scenarios pictured here. Not covered: semisubmersibles, floating production conversions, wind installation vessels and repairs. Public versus modeled: the design names are on Seatrium's public pages, and the Super B Class ratings (400 ft of water, 35,000 ft of drilling depth, 150 persons, 3,700 kips of cantilever load) come from a public delivery report; the ratings of the other designs, every price, the option rules and every approval threshold are modeled by Predictika from comparable jackup newbuilds, are illustrative and are not published by Seatrium, whose rigs are built to contract-specific designs.
6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Limits that differ for each design | Only with care Each design has its own water depth, drilling depth, accommodation and cantilever rating, so the rules form a table that has to be kept in step with the designs. | The design and the four ratings are checked together on every call, and each limit that is exceeded is reported. |
| Options that depend on each other | Only with care Hybrid power needs dual fuel and harsh environment needs two of the four designs, so each rule has to look at another field. | The design, the environment and the power options are fields of one quote and are checked together. |
| Approvals that stack on a discount | Only with care A fleet of three rigs, a contract above 500 million dollars and a discount band each need their own rule, and a discount above the hard limit must block instead. | Blocks and approvals come back together; an approval-only quote is not blocked. |
| A stated total that must match the computed total | Only with workarounds The total is built from the design, the options, the extra persons and cantilever load, the number of rigs and the discount, so a separate rule is needed to recompute it and compare it with the stated figure. | The stated total is a field of the request and is compared with the computed total on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | A water depth of 401 ft is above the 400 ft rating of the chosen design. |
| 2 | A drilling depth of 35,001 ft is above the 35,000 ft rating of the chosen design. |
| 3 | Accommodation for 151 persons is above the 150 persons of the chosen design. |
| 4 | A cantilever load of 3,701 kips is above the 3,700 kips of the chosen design. |
| 5 | The quote has 0 rigs; at least 1 is needed. |
| 6 | A water depth of 493 ft is above the 492 ft rating of the chosen design. |
| 7 | A water depth of 301 ft is above the 300 ft rating of the chosen design. |
| 8 | A cantilever load of 2,501 kips is above the 2,500 kips of the chosen design. |
| 9 | Accommodation for 121 persons is above the 120 persons of the chosen design. |
| 10 | A drilling depth of 40,001 ft is above the 40,000 ft rating of the chosen design. |
| 11 | Harsh-environment operation needs the KFELS N Class or the Gorilla Class design. |
| 12 | Hybrid battery power is only offered together with dual-fuel engines. |
| 13 | A delivery in 35 months needs a yard slot confirmed by the planning office. |
| 14 | A delivery in 30 months needs a yard slot confirmed by the planning office. |
| 15 | A delivery in 29 months is shorter than the 30 month minimum build time. |
| 16 | An order of 3 rigs needs a multi-rig contract review by management. |
| 17 | A contract value of 630,000 thousand dollars is above 500 million and needs the deal desk. |
| 18 | A contract value of 540,000 thousand dollars is above 500 million and needs the deal desk. |
| 19 | A discount of 5 percent is above 4 percent; a senior sales executive should approve it. |
| 20 | A discount of 8 percent is above 4 percent; a senior sales executive should approve it. |
| 21 | A discount of 9 percent is above the 8 percent limit. |
| 22 | A water depth of 500 ft is above the 400 ft rating of the chosen design. |
| 23 | A delivery in 24 months is shorter than the 30 month minimum build time. |
| 24 | The quote states a total of 209,999 thousand dollars; the modeled prices give 210,000 thousand dollars. |
| 25 | The quote states a total of 210,001 thousand dollars; the modeled prices give 210,000 thousand dollars. |
| 26 | The quote states a total of 1,000 thousand dollars; the modeled prices give 210,000 thousand dollars. |
| 27 | A delivery in 32 months needs a yard slot confirmed by the planning office. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote one KFELS Super B Class jackup rig for harsh-environment operation, for 450 ft of water and 30,000 ft of drilling depth, with accommodation for 160 persons and a cantilever load of 3,000 kips, with hybrid battery power, delivered in 24 months, for a total of 222,000 thousand dollars. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one KFELS N Class jackup rig for harsh-environment operation, for 450 ft of water and 35,000 ft of drilling depth, with accommodation for 160 persons and a cantilever load of 3,000 kips, with dual-fuel engines and hybrid battery power, delivered in 36 months, for a total of 270,000 thousand dollars. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote three Gorilla Class jackup rigs for standard-environment operation, for 500 ft of water and 40,000 ft of drilling depth, with accommodation for 120 persons and a cantilever load of 3,000 kips, delivered in 36 months, with a discount of 9 percent, for a total of 737,100 thousand dollars. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote three Gorilla Class jackup rigs for standard-environment operation, for 500 ft of water and 40,000 ft of drilling depth, with accommodation for 120 persons and a cantilever load of 3,000 kips, delivered in 36 months, with a discount of 4 percent, for a total of 777,600 thousand dollars. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote one KFELS Super B Class jackup rig for standard-environment operation, for 400 ft of water and 35,001 ft of drilling depth, with accommodation for 151 persons and a cantilever load of 3,701 kips, delivered in 36 months, for a total of 216,052 thousand dollars. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote one KFELS Super B Class jackup rig for standard-environment operation, for 400 ft of water and 35,000 ft of drilling depth, with accommodation for 150 persons and a cantilever load of 3,700 kips, delivered in 36 months, for a total of 215,900 thousand dollars. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.