Predictika · Gas turbine power island and service agreement quotes

An AI sales agent's gas turbine quote, checked before it goes out

An AI sales agent prepares a gas turbine power island and long-term service agreement quote for a fictional customer. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the output, fuel, emissions, start, service, payment, lead time and discount rules, compares the quote total the agent states with the one it computes, and returns a verdict with every reason.

Scope: Siemens Energy-style gas turbine power islands (SGT-400, SGT-750, SGT-A35 and SGT-800) with a long-term service agreement: site output, fuel and emissions, black start, service agreement coverage, payment terms, lead time, discount authority and the stated total. See everything this validator covers

This validator models a gas turbine power island and service agreement quote, not just the scenarios shown below.

  • Output and plant design — site output after ambient temperature and altitude derate, units in service with N or N+1 redundancy, simple or combined cycle, and start time to full load.
  • Fuel, emissions and black start — dual fuel on the turbines that offer it, hydrogen blend limits per combustion system, the NOx permit limit against the turbine's guarantee (selective catalytic reduction needed below it), and the black-start diesel package.
  • Service agreement, payment and pricing — a service term of 6 to 20 years whose equivalent operating hours must reach the first major inspection, cyclic-duty approval, down payment minimum and milestone, buyer credit, delivery lead time against the date needed, discount authority by equipment value, and the quote total the agent states against the one computed.

Any gas turbine quote that touches these rules is in scope — not only the scenarios pictured here. All ratings, derates, emissions figures, inspection intervals, prices, service rates, lead times and discount tiers are estimates for demonstration, not Siemens Energy data. Not covered: other turbine models, steam turbines and generators beyond the combined-cycle add-on, taxes, financing and real delivery slots. The validator shows computed figures but no line-item table.

The AI sales agentBuilds the gas turbine quote from the conversation and says it is ready.
Predictika validatorChecks every rule at once and returns the verdict, each finding, and the computed figures.

6 scenarios in 3 groups · each group runs from the agent’s first attempt to the outcome · click one to switch

What the agent proposes

The AI sales agent says

Illustrative agent statement. The validator receives the structured request below.

Proposing agent: AI sales agent (scripted)

Before sending, the agent must call Recorded run

Predictika validator


      
Waiting for the call.

Where rules-based CPQ gets it wrong

Click to expand

Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.

What the validator caughtTypical rules-based CPQPredictika
Output at site conditionsOnly with workarounds
Heat and altitude derate, units in service and redundancy combine into one computed output, which usually becomes a formula plus a validation rule per turbine.
The output is computed from the turbine data and compared with the requirement on every call.
Fuel, emissions and black-start optionsOnly with care
Each option rule is simple, but the turbine-specific limits (hydrogen share, dual fuel, NOx guarantee) multiply as models are added.
Limits are read from the turbine data, so a new turbine needs data, not new rules.
Service agreement term and hoursOnly with workarounds
Hours depend on running hours, starts and term together, and must be compared with a turbine-specific inspection interval.
The equivalent operating hours are computed and compared with the inspection interval.
Payment terms and buyer creditOnly with care
A down-payment floor, an approval band and a credit condition need separate rules.
All thresholds are evaluated together and returned with the reason.
Discount authority by project sizeOnly with care
Tiers that change with the equipment value mean a price rule or approval rule per band.
The approvable maximum is computed from the equipment value.
The total the agent statesOnly with workarounds
Comparing a stated total with a computed one means a separate rule per quote layout, and price rules rarely run on stated figures.
The stated total is a field in the request and is checked against the computed total.
Every problem returned in one answerOnly with workarounds
Rules tend to fire as the quote is saved, so a rep often fixes one error and meets the next.
All findings come back together, whatever order the choices arrived in.

What this validator catches: findings from its test cases

Click to expand

Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.

162.0 MW available is less than 5 percent above the 60.0 MW required; performance guarantees need engineering sign-off.
210 percent down payment is below the 15 percent standard milestone; finance must approve.
310 percent discount is above the 3 percent a sales manager can give; approvable up to 12 percent.
4350 starts per year is cyclic duty; LTSA pricing needs service-risk approval.
55 percent discount is above the 3 percent a sales manager can give; approvable up to 7 percent.
6106.4 MW available (53.2 MW per unit at 35 C and 100 m, N redundancy) is below the 110.0 MW required.
731.85 MW available (31.85 MW per unit at 25 C and 0 m, N_Plus_1 redundancy) is below the 40.0 MW required.
830 percent hydrogen exceeds the 15 percent the SGT-A35 aeroderivative gas turbine combustion system is rated for.
9Permit limit 15 ppm NOx is below the 25 ppm DLE guarantee; add SCR.
10Black start on the SGT-800 industrial gas turbine needs the black-start diesel package.
11Start to full load takes about 45 min; the customer requires 30 min.
12LTSA term 4 years is outside 6 to 20 years.
1330,000 EOH over the LTSA term does not reach the first major inspection at 40,000 EOH.
145 percent down payment is below the 10 percent minimum.
15A sub-investment-grade buyer needs at least 20 percent down or a letter of credit.
16Delivery takes about 24 months; the customer needs commercial operation in 20.
1715 percent discount exceeds the 12 percent that can be approved on EUR 106,000,000.0 of equipment.
18Dual fuel is not offered on the DLE SGT-A35 aeroderivative gas turbine.
19The total price the agent states (EUR 109,649,000.0) differs from the total the validator computes (EUR 115,420,000.0).

Scenarios and results

Click to expand

The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.

1. Combined cycle with twelve problems: A combined-cycle SGT-800 quote with twelve problems at once, from output to the stated total

The agent's request. Please quote 1 Siemens Energy SGT-800 gas turbine in combined cycle on a hydrogen blend (80 percent hydrogen), 70 MW required at 35 C and 100 m, NOx permit 9 ppm, black start, full load within 30 minutes, a 4-year service agreement at 4,000 hours and 50 starts a year, 5 percent down payment from a sub-investment-grade buyer, needed in 20 months, with a 10 percent discount. Quote total €48,189,600.00. Ready to send.

Verdict: Blocked.

  • Output below the required MW. 53.2 MW available (53.2 MW per unit at 35 C and 100 m, N redundancy) is below the 70.0 MW required.
  • Hydrogen share above the combustion rating. 80 percent hydrogen exceeds the 75 percent the SGT-800 industrial gas turbine combustion system is rated for.
  • NOx limit needs SCR. Permit limit 9 ppm NOx is below the 15 ppm DLE guarantee; add SCR.
  • Black start needs the diesel package. Black start on the SGT-800 industrial gas turbine needs the black-start diesel package.
  • Start time above the requirement. Start to full load takes about 45 min; the customer requires 30 min.
  • Service agreement term out of range. LTSA term 4 years is outside 6 to 20 years.
  • Service agreement never reaches the major inspection. 18,000 EOH over the LTSA term does not reach the first major inspection at 40,000 EOH.
  • Down payment below the minimum. 5 percent down payment is below the 10 percent minimum.
  • Sub-investment-grade buyer needs more security. A sub-investment-grade buyer needs at least 20 percent down or a letter of credit.
  • Delivery later than needed. Delivery takes about 24 months; the customer needs commercial operation in 20.
  • Discount above the approvable maximum. 10 percent discount exceeds the 7 percent that can be approved on EUR 53,800,000.0 of equipment.
  • Stated total differs from the validator total. The total price the agent states (EUR 48,189,600.0) differs from the total the validator computes (EUR 49,680,000.0).

2. Combined cycle with twelve problems: The agent resubmits after fixing the errors

The agent's request. Please quote 2 Siemens Energy SGT-800 gas turbines in combined cycle on a hydrogen blend (50 percent hydrogen), 70 MW required at 35 C and 100 m, NOx permit 9 ppm, with SCR, black start with the diesel package, full load within 45 minutes, a 12-year service agreement at 7,000 hours and 50 starts a year, 20 percent down payment from a sub-investment-grade buyer, needed in 30 months, with a 3 percent discount. Quote total €123,568,000.00. Ready to send.

Verdict: Allowed.

3. Aeroderivative peakers: Two SGT-A35 peakers on dual fuel with a short start time and a short lead time

The agent's request. Please quote 2 Siemens Energy SGT-A35 gas turbines in simple cycle with N+1 redundancy on dual fuel, 40 MW required at 25 C and 0 m, NOx permit 25 ppm, full load within 5 minutes, a 25-year service agreement at 3,000 hours and 200 starts a year, 8 percent down payment from an investment-grade buyer, needed in 10 months, with no discount. Quote total €49,400,000.00. Ready to send.

Verdict: Blocked.

  • Output below the required MW. 31.85 MW available (31.85 MW per unit at 25 C and 0 m, N_Plus_1 redundancy) is below the 40.0 MW required.
  • Dual fuel not offered on this turbine. Dual fuel is not offered on the DLE SGT-A35 aeroderivative gas turbine.
  • Start time above the requirement. Start to full load takes about 8 min; the customer requires 5 min.
  • Service agreement term out of range. LTSA term 25 years is outside 6 to 20 years.
  • Down payment below the minimum. 8 percent down payment is below the 10 percent minimum.
  • Delivery later than needed. Delivery takes about 12 months; the customer needs commercial operation in 10.

4. Aeroderivative peakers: The agent resubmits after fixing the errors

The agent's request. Please quote 3 Siemens Energy SGT-A35 gas turbines in simple cycle with N+1 redundancy on natural gas, 40 MW required at 25 C and 0 m, NOx permit 25 ppm, full load within 10 minutes, a 10-year service agreement at 3,000 hours and 200 starts a year, 20 percent down payment from an investment-grade buyer, needed in 14 months, with no discount. Quote total €62,400,000.00. Ready to send.

Verdict: Allowed.

5. Approvals: One SGT-750 with a thin output margin, cyclic duty and a small down payment

The agent's request. Please quote 1 Siemens Energy SGT-750 gas turbine in simple cycle on natural gas, 40 MW required at 15 C and 0 m, NOx permit 25 ppm, an 8-year service agreement at 3,000 hours and 350 starts a year, 12 percent down payment from an investment-grade buyer, needed in 20 months, with a 5 percent discount. Quote total €22,810,000.00. Ready to send.

Verdict: Needs approval.

  • Thin output margin. 41.0 MW available is less than 5 percent above the 40.0 MW required; performance guarantees need engineering sign-off.
  • Cyclic duty. 350 starts per year is cyclic duty; LTSA pricing needs service-risk approval.
  • Down payment below the standard milestone. 12 percent down payment is below the 15 percent standard milestone; finance must approve.
  • Discount needs approval. 5 percent discount is above the 3 percent a sales manager can give; approvable up to 7 percent.

6. Approvals: The agent resubmits after fixing the errors

The agent's request. Please quote 2 Siemens Energy SGT-750 gas turbines in simple cycle on natural gas, 60 MW required at 15 C and 0 m, NOx permit 25 ppm, an 8-year service agreement at 3,000 hours and 200 starts a year, 20 percent down payment from an investment-grade buyer, needed in 20 months, with a 3 percent discount. Quote total €45,140,000.00. Ready to send.

Verdict: Allowed.

Narration transcript

Click to expand

The text of the narrated walkthrough, step by step.

  1. Welcome to a demo of Predictika's Validator. An AI sales agent prepares a gas turbine power island and long-term service agreement quote for a fictional customer. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the output, fuel, emissions, start, service, payment, lead time and discount rules, compares the quote total the agent states with the one it computes, and returns a verdict with every reason.
  2. I will start with the first request by the agent.
  3. The agent says. Please quote 1 Siemens Energy SGT-800 gas turbine in combined cycle on a hydrogen blend (80 percent hydrogen), 70 MW required at 35 C and 100 m. Quote total €48,189,600.00. The rest of the request is on screen.
  4. Before it goes out, the agent calls the validator.
  5. Blocked, with twelve findings, all in one answer. 53.2 MW available (53.2 MW per unit at 35 C and 100 m, N redundancy) is below the 70.0 MW required. 80 percent hydrogen exceeds the 75 percent the SGT-800 industrial gas turbine combustion system is rated for. Permit limit 9 ppm NOx is below the 15 ppm DLE guarantee; add SCR. The other nine are on screen.
  6. The validator returned twelve blocking findings in one answer. A check that reads one field at a time would pass most of this; it shows only when the choices in the quote are checked against each other and against the stated total.
  7. What this shows: for service agreement term and hours, a rules-based CPQ can do this only with workarounds.
  8. Now the agent resubmits.
  9. The corrected request. It changes the turbines to 2, the hydrogen share to 50 percent and the stated quote total to €123,568,000. It sets the SCR to yes and the black-start diesel package to yes. Six more changes are on screen.
  10. It calls the validator again.
  11. This time the validator clears it.
  12. All twelve earlier findings are cleared.
  13. Twelve problems caught in one call, fixed in one pass, and a clean 123,568,000 euros quote. That is the value of Predictika's validator: catching mistakes before they reach the customer.