Predictika · Supermicro servers and racks
An AI sales agent prepares a quote for Supermicro servers and racks: platform, processors, memory, GPUs, adapters, drives, power supplies, racks, power and cooling, support. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the configuration rules and returns a verdict, every reason, the figures it computed and, for a quote that can proceed, the line-item quote itself.
This validator checks AI-drafted quotes for Supermicro servers and racks: the Hyper SYS-122H-TN and SYS-222H-TN, the H14 Hyper AS-2126HS-TN, the GPU systems SYS-821GE-TNHR, SYS-822GS-NB3RT, SYS-422GS-NBRT-LCC and AS-8126GS-TNMR, and the GB300 NVL72 SuperCluster rack, together with the racks, power distribution, top-of-rack switches, cooling, support and deployment quoted around them. It does not price or configure any other Supermicro product line.
The validator handles any case involving these Supermicro servers and racks — any combination of platform, processor, memory, GPU, adapter, drive, power supply and rack that touches the checks above — not only the scenarios shown on this page.
8 scenarios in 4 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Processor socket and power limit that differ by platform (a LGA7529, 500 W processor in a LGA4710 chassis that cools 350 W) | Only with care A lookup rule per platform for socket and per-processor limit. Works, but every new platform or processor adds rules that someone must keep in step. | One catalog table; the check follows from the platform chosen, in any order. |
| A server that draws more than its power supplies can carry once redundant ones are held back | Only with workarounds Needs the draw of the processors, memory, GPUs, adapters and drives added up per server, then compared with supplies minus the redundant ones. Doable with chained formulas and summary variables, and fragile when any input changes. | Computed from the model and checked on every line of every call. |
| A GPU rated above what the chassis can cool (HGX B300 at 1,100 W in a 1,000 W chassis) | Easy A straightforward product rule once the per-GPU limit is a field on the platform and the GPU. | Same, from the catalog. |
| Racks needed from space and power, with PDU capacity and the site limit per rack | Only with workarounds Needs rack units, power per server, PDU capacity, switch space and the site limit combined, then rounded up. Rules-based CPQ tools rarely compute this; reps often guess. | Computed from the model; the racks chosen are checked against it. |
| Facility water, power per rack and the deployment service for liquid-cooled and rack-scale systems | Only with care Separate validation rules against site fields. Fine if the site fields are always filled in; silent if they are left blank. | Each is a check in the same model; all findings come back together. |
| A quote that states a total or power different from what the build gives | Only with care A validation rule can compare a stated figure with a calculated field, but only if the stated figure is a field on the quote, which it rarely is. | The stated figures travel with the quote and are compared with the computed ones on every call. |
| Every problem returned in one answer | Only with workarounds Rules tend to fire as the quote is saved or a step is completed, so a rep often fixes one error and meets the next. | All findings come back together, whatever order the choices arrived in. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; warnings and notes are computed alongside. These are the findings returned in the live runs behind this page: the eight scenarios plus four extra checks.
| 1 | Processor does not fit this server. Supermicro Hyper SYS-122H-TN: Intel Xeon 6 6980P uses socket LGA7529 but this platform takes LGA4710. |
| 2 | Processor runs too hot for this server. Supermicro Hyper SYS-122H-TN: Intel Xeon 6 6980P is rated 500 W; this chassis cools up to 350 W per processor. |
| 3 | Power supplies too small for the server. Supermicro Hyper SYS-122H-TN: the server draws up to 1300 W but its power supplies give 1200 W with 1 kept as a redundant spare. |
| 4 | GPU runs too hot for this server. Supermicro SYS-422GS-NBRT-LCC: NVIDIA HGX B300 288GB is rated 1100 W; this chassis cools up to 1000 W per GPU. |
| 5 | Rack-scale system needs more power per rack. A rack-scale system draws 135 kW per rack; the site delivers 120 kW per rack. |
| 6 | Rack-scale system needs the deployment service. Rack-scale systems ship as factory-integrated racks and must be ordered with the deployment service. |
| 7 | Quoted power does not match. The quote states 7 kW total power; the validator computes 8.4 kW. |
| 8 | Quoted total does not match. The quote states a total of $250,000.00; the validator computes $262,200.00. |
| 9 | Too many network adapters. Supermicro Hyper SYS-122H-TN: 4 network adapters chosen; the platform has 3 slots. |
| 10 | Drives do not fit the bays. Supermicro Hyper SYS-122H-TN: Supermicro 7.68TB NVMe E1.S is an E1.S drive; the bays take U.2 drives. |
| 11 | Liquid-cooled servers need facility water. 4 liquid-cooled servers are on the quote but the site has no facility water for liquid cooling. |
| 12 | Too few racks chosen. 1 rack chosen; these servers need at least 2 (up to 57.5 kW and 47 RU for servers per rack). |
| 13 | Memory channels filled unevenly. Supermicro Hyper SYS-122H-TN: 20 DIMMs across 16 memory channels leaves them unevenly filled; use a multiple of 16 for full bandwidth. |
| 14 | Memory runs slower with two modules per channel. Supermicro Hyper SYS-122H-TN: two DIMMs per channel; memory runs at 6000 MT/s instead of 6400 MT/s. |
| 15 | Air-cooled racks above the comfort zone. Air-cooled racks average 51.33 kW; above 30 kW air cooling usually needs rear-door heat exchangers or hot-aisle containment. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote ten Supermicro Hyper SYS-122H-TN servers, each with two Intel Xeon 6 6980P processors, sixteen 32 GB DDR5 memory modules, one Supermicro AIOM 25 Gb dual-port adapter and two 3.84 TB U.2 NVMe drives, with onsite next-business-day support for 3 years. The quote shows a total price of $516,120.00 and a total power of 13 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote ten Supermicro Hyper SYS-122H-TN servers, each with two Intel Xeon 6 6737P processors, sixteen 32 GB DDR5 memory modules, one Supermicro AIOM 25 Gb dual-port adapter and two 3.84 TB U.2 NVMe drives, with onsite next-business-day support for 3 years. The quote shows a total price of $262,200.00 and a total power of 8.4 kW. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote six Supermicro Hyper SYS-222H-TN GPU servers, each with two Intel Xeon 6 6737P processors, sixteen 64 GB DDR5 memory modules, four NVIDIA L40S GPUs, one Supermicro AIOM 25 Gb dual-port adapter and four 3.84 TB U.2 NVMe drives, with onsite next-business-day support for 5 years. The quote shows a total price of $459,110.08 and a total power of 14.17 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote six Supermicro Hyper SYS-222H-TN GPU servers, each with two Intel Xeon 6 6737P processors, sixteen 64 GB DDR5 memory modules, four NVIDIA L40S GPUs, one Supermicro AIOM 25 Gb dual-port adapter, four 3.84 TB U.2 NVMe drives and two 2600 W power supplies, with onsite next-business-day support for 5 years. The quote shows a total price of $462,679.36 and a total power of 14.17 kW. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote eight Supermicro SYS-422GS-NBRT-LCC liquid-cooled GPU servers, each with two Intel Xeon 6 6787P processors, sixteen 64 GB DDR5 memory modules, eight NVIDIA HGX B300 GPUs, eight NVIDIA ConnectX-7 400 Gb adapters and four 7.68 TB E1.S drives. Place them in Supermicro 48U racks with four 57.5 kVA PDUs per rack and NVIDIA Spectrum-X SN5600 switches, at a site with facility water and 80 kW per rack, with factory rack integration and deployment and onsite 4-hour mission-critical support for 3 years. The quote shows a total price of $4,253,390.08 and a total power of 89.12 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote eight Supermicro SYS-422GS-NBRT-LCC liquid-cooled GPU servers, each with two Intel Xeon 6 6787P processors, sixteen 64 GB DDR5 memory modules, eight NVIDIA HGX B200 GPUs, eight NVIDIA ConnectX-7 400 Gb adapters and four 7.68 TB E1.S drives. Place them in Supermicro 48U racks with four 57.5 kVA PDUs per rack and NVIDIA Spectrum-X SN5600 switches, at a site with facility water and 80 kW per rack, with factory rack integration and deployment and onsite 4-hour mission-critical support for 3 years. The quote shows a total price of $3,733,198.08 and a total power of 82.72 kW. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote two Supermicro GB300 NVL72 SuperCluster racks, at a site with facility water that delivers 120 kW per rack, with onsite 4-hour mission-critical support for 3 years. The quote shows a total price of $7,059,168.00 and a total power of 270 kW. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote two Supermicro GB300 NVL72 SuperCluster racks, at a site with facility water that delivers 150 kW per rack, with factory rack integration and deployment and onsite 4-hour mission-critical support for 3 years. The quote shows a total price of $7,089,168.00 and a total power of 270 kW. It is ready to send.
Verdict: Allowed.
The text of the narrated walkthrough, step by step.