Predictika · Vertiv AI power and liquid cooling quotes
An AI sales agent prepares a quote for a Vertiv power and liquid-cooling package for AI racks: Liebert EXL S1 or Trinergy Cube UPS units, battery cabinets, CoolChip CDU liquid cooling, startup and a service plan. Before it goes out, the agent sends it to Predictika, which checks it against a declarative model of the product and quoting rules, compares the total the quote states with the computed one, and returns every finding together with the line-item quote. This is an illustrative model built from Vertiv's public product information with fictional prices; it is not Vertiv's internal rule set.
This validator is built for one thing: configuring and quoting a Vertiv power and liquid-cooling package for AI data center racks. It handles any quote involving the UPS models, battery chemistries, CDUs, redundancy modes and service tiers below, not only the scenarios shown on this page. It does not cover Vertiv's other product lines (thermal management for telecom, monitoring software, and so on).
7 scenarios in 4 groups · each group runs from the agent’s first attempt to the outcome · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Proposing agent: AI sales agent (scripted)
Before sending, the agent must call Recorded run
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator caught | Typical rules-based CPQ | Predictika |
|---|---|---|
| Usable UPS capacity that changes with the redundancy mode | Only with care N+1 gives up one unit and 2N gives up half. It can be built as a formula per mode, but every new mode or UPS family adds rules that someone has to keep in step with the line items. | Usable capacity is computed with the load on every call: 1,200 kW blocks against 1,000 kW under N+1 and passes on 800 kW units. |
| Cooling limits that depend on the liquid share, the rack density and the CDU type | Only with workarounds The liquid heat load, the heat left for room air and the 80 kW ceiling for liquid-to-air CDUs all hang on three separate choices. They are derived quantities that a quote form does not carry, so they end up in spreadsheets or hand checks. | The derived loads are computed from the choices and checked together; both findings on the 90 kW racks come back in one pass. |
| Lead time as the longer of the UPS and the CDU, against the date the customer needs it | Only with care Needs a derived maximum across two lines and a comparison with a header date. It is possible, but it is usually a note rather than a rule. | The longer lead time is computed from the chosen models and compared with the need date on every call. |
| A stated total that does not match the computed price | Only with workarounds A validation rule can compare a stated total with a calculated field, but only if the stated total is a field on the quote, which it rarely is. | The stated total travels with the quote and is compared with the computed one on every call. |
Every rule is checked on every call, in any order the choices arrive; one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| 1 | 2N redundancy needs an even number of UPS units; the quote has 3. |
| 2 | A 2N critical site on Basic service needs a service-level waiver. |
| 3 | A battery runtime of 7 minutes is not offered; choose 5, 10 or 15. |
| 4 | A discount of 18 percent is above the 10 percent a rep may give alone. |
| 5 | A discount of 21 percent is above the 20 percent maximum. |
| 6 | A service term of 6 years is not offered; choose 1 to 5 years. |
| 7 | At this liquid share each rack still gives off 54 kW to the room air; the limit is 40 kW per rack. |
| 8 | CoolChip CDU 600 is liquid-to-liquid and needs facility water; the site has none. |
| 9 | Equipment lead time is about 20 weeks (UPS 20 weeks, CDU 20 weeks); the customer needs it in 12 weeks. |
| 10 | IT load of 1,200 kW is above the 1,000 kW the UPS units can carry in this redundancy mode. |
| 11 | IT load of 950 kW is above 90 percent of the 1,000 kW usable UPS capacity; engineering review is needed. |
| 12 | Liebert EXL S1 500 kW allows at most 8 units in parallel; the quote has 10. |
| 13 | Liquid heat load of 1,000 kW is above the 600 kW the CDUs can remove in this redundancy mode. |
| 14 | Liquid-to-air CoolChip CDU 70 cannot serve racks above 80 kW; the quote has 90 kW racks. |
| 15 | Stated total does not match: the agent stated $1,717,280.00; the validator computes $1,692,280.00. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. Please quote a 2.8 MW AI hall for Sable Cloud: 40 racks of 70 kW with 70 percent liquid cooling, on three Liebert Trinergy Cube 1600 kW UPS units in N+1 redundancy with lithium-ion batteries for 5 minutes, and two CoolChip CDU 2300 units in N+1. Premium service for 6 years, delivery within 12 weeks and an 18 percent discount. The quote states a total of $5,289,400.00. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a 2.8 MW AI hall for Sable Cloud: 40 racks of 70 kW with 70 percent liquid cooling, on three Liebert Trinergy Cube 1600 kW UPS units in N+1 redundancy with lithium-ion batteries for 5 minutes, and two CoolChip CDU 2300 units in N+1. Premium service for 5 years, delivery within 24 weeks and an 18 percent discount. The quote states a total of $4,886,200.00. It is ready to send.
Verdict: Needs approval.
The agent's request. Please quote 10 racks of 90 kW for Halcyon Labs with 40 percent liquid cooling, on two Liebert EXL S1 1200 kW UPS units in N+1 redundancy with lithium-ion batteries for 5 minutes, and six CoolChip CDU 70 liquid-to-air units without a spare. The site has no facility water. Preferred service for 3 years and delivery within 16 weeks. The quote states a total of $1,799,920.00. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote 10 racks of 90 kW for Halcyon Labs with 80 percent liquid cooling, on two Liebert EXL S1 1200 kW UPS units in N+1 redundancy with lithium-ion batteries for 5 minutes, and two CoolChip CDU 1350 units in N+1 on the site's facility water. Preferred service for 3 years and delivery within 16 weeks. The quote states a total of $2,240,400.00. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote a 1.2 MW AI hall for Northgate Compute: 20 racks of 60 kW with 75 percent liquid cooling, on three Liebert EXL S1 500 kW UPS units in N+1 redundancy with lithium-ion batteries for 5 minutes, and three CoolChip CDU 600 units in N+1. Preferred service for 3 years, delivery within 16 weeks and a 10 percent discount. The quote states a total of $1,559,700.00. It is ready to send.
Verdict: Blocked.
The agent's request. Please quote a 1.2 MW AI hall for Northgate Compute: 20 racks of 60 kW with 75 percent liquid cooling, on three Liebert EXL S1 800 kW UPS units in N+1 redundancy with lithium-ion batteries for 5 minutes, and three CoolChip CDU 600 units in N+1. Preferred service for 3 years, delivery within 16 weeks and a 10 percent discount. The quote states a total of $1,867,500.00. It is ready to send.
Verdict: Allowed.
The agent's request. Please quote 5 racks of 50 kW for Kestrel Edge with 70 percent liquid cooling, on three Liebert EXL S1 500 kW UPS units in 2N redundancy with VRLA batteries for 7 minutes, and two CoolChip CDU 600 units in N+1. Premium service for 3 years and delivery within 16 weeks. The quote states a total of $1,717,280.00. It is ready to send.
Verdict: Blocked.
The text of the narrated walkthrough, step by step.