Predictika · panelboards and switchboards, main breakers, feeders, ground-fault protection, fault current, tier pricing and discount authority
An AI sales agent prepares an electrical project bid for a fictional contractor. Before it goes out, the agent sends it to Predictika’s validator, which checks it against the equipment and engineering rules, compares the net bid the agent states with the one it computes, and returns a verdict with every reason.
This validator models electrical project bids in the style of WESCO: panelboards and switchboards with a main breaker and feeder conductors. It handles any bid made of these products, not just the scenarios shown below.
It does not cover other electrical product lines, real list prices, a full electrical code review, stamped engineering, or tax and multi-currency quoting.
8 scenarios in workflow pairs · click one to switch
Illustrative agent statement. The validator receives the structured request below.
Before sending, the agent must call
What this means
Our assessment of what a typical rules-based CPQ (product rules, price rules and validation rules, as in Salesforce CPQ or Revenue Cloud) does with the same cases. It is a judgment about effort and reliability, not a claim that nothing can be built.
| What the validator catches | Typical rules-based CPQ | Predictika |
|---|---|---|
| Panelboard bus and main breaker rating | Only with care Each panelboard carries its own voltage, bus and fault ratings, so every combination with a main size becomes a rule row. | Ratings are properties of the catalog item, checked against the main on every call. |
| Parallel conductor sets, ampacity and voltage drop | Only with workarounds Ampacity times the number of sets, plus a length- and size-dependent voltage drop, is a calculation, not a lookup, and rarely fits a price or validation rule. | Ampacity, sets and the three-phase voltage drop are computed together and compared with their limits. |
| Ground-fault protection by service and size | Only with care The requirement depends on service voltage and main size together, so it becomes separate rules per combination. | Service voltage and main size are evaluated together on every call. |
| Fault current and lead time against the need date | Only with care A fault rating and a lead time each come from the panelboard and are compared with job inputs in separate rules. | Both are read from the catalog and compared with the job in one pass. |
| Copper-indexed wire pricing and contractor tier | Easy Tier multipliers are a price rule most CPQ tools handle; the copper index adds a second moving input on copper conductors only. | Tier pricing and the copper-indexed wire cost feed one net bid. |
| The bid the agent states | Only with workarounds Comparing a stated bid with a computed one means a rule per quote layout, and price rules rarely run on stated figures. | The stated net bid is a field in the request and is checked against the computed bid. |
Every rule is checked on every call, in whatever order the choices arrive, and one problem never hides another. Blocking findings stop the quote; approval findings need a person to sign off; everything else is computed.
| Rule | Effect | What it checks |
|---|---|---|
| Panel voltage rating | block | The panelboard is rated for the service voltage (208 V or 480 V). |
| Main breaker vs bus | block | The main does not exceed the panelboard bus rating. |
| Main sizing | block | The main is at least 125 percent of the continuous load. |
| Conductor ampacity | block | Conductor ampacity times the number of parallel sets protects the main. |
| Feeder voltage drop | block | Three-phase feeder voltage drop stays within 3 percent (copper and aluminum constants). |
| Ground-fault protection | block | A 480Y/277 V main of 1,000 A or more has ground-fault protection. |
| Fault current rating | block | Available fault current does not exceed the panelboard rating. |
| Lead time | block | The gear lead time fits the date the job needs it. |
| SPA discount limit | block | No more than 5 percent special pricing agreement discount beyond tier pricing. |
| Net bid the agent states | block | The net bid in the agent's request matches the computed bid within USD 1. |
| SPA discount approval | needs approval | A discount above 2 percent needs sales sign-off. |
| Large bid | needs approval | A net bid above USD 250,000 needs branch manager approval. |
The recorded result of the validator for each scenario on this page: the request the AI agent sent, the verdict, and every finding, in the order they appear above.
The agent's request. 400 A main distribution on an Eaton Pow-R-Line 2a panelboard for a 480 V service. One set of 4/0 AWG copper feeders, 400 feet, 380 A calculated load, 50 kA available fault current, needed in 3 weeks. Tier B contractor pricing with an 8 percent special pricing agreement discount. Net bid USD 14,260.15. Ready to send.
Verdict: Blocked.
The agent's request. 400 A main distribution on an Eaton Pow-R-Line 3a panelboard for a 480 V service. Two sets of 500 kcmil copper feeders, 400 feet, 380 A calculated load, 50 kA available fault current, needed in 8 weeks. Tier B contractor pricing with a 2 percent special pricing agreement discount. Net bid USD 53,936.06. Ready to send.
Verdict: Allowed.
The agent's request. 1200 A main distribution on an Eaton Pow-R-Line 4 distribution panel for a 480 V service. Four sets of 500 kcmil copper feeders, 80 feet, 900 A calculated load, 50 kA available fault current, needed in 12 weeks. Tier A contractor pricing. Net bid USD 47,681.28. Ready to send.
Verdict: Blocked.
The agent's request. 1200 A main distribution on an Eaton Pow-R-Line 4 distribution panel for a 480 V service, with ground-fault protection on the main. Four sets of 500 kcmil copper feeders, 80 feet, 900 A calculated load, 50 kA available fault current, needed in 12 weeks. Tier A contractor pricing. Net bid USD 47,681.28. Ready to send.
Verdict: Allowed.
The agent's request. 400 A main distribution on an Eaton Pow-R-Line 2a panelboard for a 480 V service. Two sets of 500 kcmil copper feeders, 60 feet, 300 A calculated load, 20 kA available fault current, needed in 6 weeks. Tier B contractor pricing. Net bid USD 14,651.52. Ready to send.
Verdict: Blocked.
The agent's request. 400 A main distribution on an Eaton Pow-R-Line 3a panelboard for a 480 V service. Two sets of 500 kcmil copper feeders, 60 feet, 300 A calculated load, 20 kA available fault current, needed in 6 weeks. Tier B contractor pricing. Net bid USD 20,345.52. Ready to send.
Verdict: Allowed.
The agent's request. 200 A main distribution on an Eaton Pow-R-Line 2a panelboard for a 480 V service. One set of 4/0 AWG copper feeders, 80 feet, 150 A calculated load, 20 kA available fault current, needed in 6 weeks. Tier C contractor pricing with an 8 percent special pricing agreement discount. Net bid USD 8,114.03. Ready to send.
Verdict: Blocked.
The agent's request. 200 A main distribution on an Eaton Pow-R-Line 2a panelboard for a 480 V service. One set of 4/0 AWG copper feeders, 80 feet, 150 A calculated load, 20 kA available fault current, needed in 6 weeks. Tier C contractor pricing with a 4 percent special pricing agreement discount. Net bid USD 8,466.82. Ready to send.
Verdict: Needs approval.
The text of the narrated walkthrough, step by step.